Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Rockland, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 73Number of bridges
  • 745ft / 227mTotal length
  • $113,880,000Total costs
  • 121,543Total average daily traffic
  • 16,786Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rockland
  • No street view available for this location

New bridges in Rockland, NY - historical statistics
  • New bridges - historical statistics
  • 3Before 1900
  • 11910-1919
  • 31930-1939
  • 31940-1949
  • 31950-1959
  • 371960-1969
  • 51980-1989
  • 51990-1999
  • 112000-2009
  • 22010-2019
Reconstructed bridges in Rockland, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 141980-1989
  • 51990-1999
  • 62000-2009
  • 32010-2019
Average Bridge Daily Traffic in Rockland, NY
Average Bridge Truck Traffic in Rockland, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.3%Excellent
  • 20.7%Very good
  • 37.9%Good
  • 19.0%Satisfactory
  • 10.3%Fair
  • 1.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.9%Excellent
  • 22.4%Very good
  • 43.1%Good
  • 17.2%Satisfactory
  • 8.6%Fair
  • 1.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.7%Excellent
  • 15.5%Very good
  • 25.9%Good
  • 29.3%Satisfactory
  • 24.1%Fair
  • 3.4%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.8%Very good
  • 22.6%Good
  • 39.6%Satisfactory
  • 34.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 1013491,  Location: 0.5 MI NW EXIT 94-RTE 17 (Lat: 41.934194,  Lng: -74.920428),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 11.92m (39.11ft),  Average Daily Traffic: 3,150 (year 2011),  Truck Traffic: 19%,  Average Future Daily Traffic: 4,915 (year 2040),  Design Load: HS 20,  Features Intersected: WILLOWEMOC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 52.4m (171.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.91m (39.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,891,000,  Roadway Improvement Cost: $1,693,000,  Total Project Cost: $4,584,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1013492,  Location: 0.5 MI NW EXIT 94 - RT 17 (Lat: 41.933872,  Lng: -74.920156),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 11.70m (38.39ft),  Average Daily Traffic: 3,150 (year 2011),  Truck Traffic: 19%,  Average Future Daily Traffic: 4,915 (year 2040),  Design Load: HS 20,  Features Intersected: WILLOWEMOC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 51.5m (169.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.70m (38.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,840,000,  Roadway Improvement Cost: $1,663,000,  Total Project Cost: $4,502,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1013501,  Location: 0.1 MI SE EXIT 94-RTE 17 (Lat: 41.931467,  Lng: -74.914003),  Route carried "on" structure: State highway 17,  Year Built: 1965,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: BROAD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.526,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,182,000,  Roadway Improvement Cost: $692,000,  Total Project Cost: $1,874,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1013502,  Location: 0.1 MI NW EXIT 94-RTE 17 (Lat: 41.931308,  Lng: -74.914114),  Route carried "on" structure: State highway 17,  Year Built: 1965,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: BROAD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.526,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $913,000,  Roadway Improvement Cost: $535,000,  Total Project Cost: $1,448,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101351,  Location: 02 MI NW EXIT 96 RTE 17 (Lat: 41.907158,  Lng: -74.821681),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 329 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 461 (year 2039),  Design Load: HS 20,  Features Intersected: 17 17 96091074 WB, RTE,  Facility Carried by Structure: WHITE ROE LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,493,000,  Roadway Improvement Cost: $874,000,  Total Project Cost: $2,368,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1013521,  Location: EXIT 96/SH 17 INTERCHANGE (Lat: 41.906153,  Lng: -74.819567),  Route carried "on" structure: State highway 17,  Year Built: 1963,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 4,408 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 6,878 (year 2040),  Design Load: HS 20,  Features Intersected: DE BRUCE RD-CR 81, WILLO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.164,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Very good,  Channel: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.77m (28.77ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: April 2018,  Bridge Improvement Cost: $3,160,000,  Roadway Improvement Cost: $1,850,000,  Total Project Cost: $5,010,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1013522,  Location: EXIT 96/SH 17 INTERCHANGE (Lat: 41.906089,  Lng: -74.819719),  Route carried "on" structure: State highway 17,  Year Built: 1963,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 4,408 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 6,878 (year 2040),  Design Load: HS 20,  Features Intersected: DE BRUCE RD-CR 81, WILLO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.164,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.77m (28.77ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: April 2018,  Bridge Improvement Cost: $3,160,000,  Roadway Improvement Cost: $1,850,000,  Total Project Cost: $5,010,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1013539,  Location: 19 MI SE EXIT 96 RTE 17 (Lat: 41.881206,  Lng: -74.799603),  Route carried "on" structure: State highway 17,  Year Built: 1963,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 8,816 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 13,757 (year 2040),  Design Load: HS 20,  Features Intersected: SERVICE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.479,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 29.9m (98.1ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,095,000,  Roadway Improvement Cost: $2,398,000,  Total Project Cost: $6,494,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1063371,  Location: 13 MI SE EXIT 94 RTE 17 (Lat: 41.924289,  Lng: -74.891972),  Route carried "on" structure: State highway 17,  Year Built: 1966,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 8.99m (29.49ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: WILLOWEMOC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.570,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.99m (29.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,299,000,  Roadway Improvement Cost: $1,346,000,  Total Project Cost: $3,646,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1063372,  Location: 1.3 MI SE EXIT 94 RTE 17 (Lat: 41.924108,  Lng: -74.892006),  Route carried "on" structure: State highway 17,  Year Built: 1966,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 8.99m (29.49ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: WILLOWEMOC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.570,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.99m (29.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,298,000,  Roadway Improvement Cost: $1,345,000,  Total Project Cost: $3,643,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1063381,  Location: 16 MI SE EXIT 94 RTE 17 (Lat: 41.926239,  Lng: -74.886453),  Route carried "on" structure: State highway 17,  Year Built: 1966,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: WILLOWEMOC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.133,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.26m (13.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,042,000,  Roadway Improvement Cost: $1,196,000,  Total Project Cost: $3,238,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1063382,  Location: 16 MI SE EXIT 94 RTE 17 (Lat: 41.926058,  Lng: -74.886136),  Route carried "on" structure: State highway 17,  Year Built: 1966,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: WILLOWEMOC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.133,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.6m (139.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.41m (14.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,077,000,  Roadway Improvement Cost: $1,216,000,  Total Project Cost: $3,293,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1063391,  Location: 2.1 MI SE EXIT 94 RTE-17 (Lat: 41.927678,  Lng: -74.876961),  Route carried "on" structure: State highway 17,  Year Built: 1966,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: HAZEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.985,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,270,000,  Roadway Improvement Cost: $744,000,  Total Project Cost: $2,014,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1063392,  Location: 2.1 MI SE EXIT 94-RTE 17 (Lat: 41.927356,  Lng: -74.876544),  Route carried "on" structure: State highway 17,  Year Built: 1966,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: HAZEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.985,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,229,000,  Roadway Improvement Cost: $719,000,  Total Project Cost: $1,948,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1063401,  Location: 3.2 MI SE EXIT 94 - SH 17 (Lat: 41.924314,  Lng: -74.858383),  Route carried "on" structure: State highway 17,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: WILLOWEMOC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.675,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.76m (22.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,051,000,  Roadway Improvement Cost: $1,201,000,  Total Project Cost: $3,252,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1063402,  Location: 3.2 MI SE EXIT 94 - SH 17 (Lat: 41.923964,  Lng: -74.858761),  Route carried "on" structure: State highway 17,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: WILLOWEMOC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.675,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 27.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,016,000,  Roadway Improvement Cost: $1,181,000,  Total Project Cost: $3,197,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1063411,  Location: 07 MI NW EXIT 96 RTE 17 (Lat: 41.911425,  Lng: -74.830031),  Route carried "on" structure: State highway 17,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 13.38m (43.90ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: COVERED BRIDGE RD, WILLO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.086,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.38m (43.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,278,000,  Roadway Improvement Cost: $1,920,000,  Total Project Cost: $5,198,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1063412,  Location: 07 MI NW EXIT 96 RTE 17 (Lat: 41.911275,  Lng: -74.830189),  Route carried "on" structure: State highway 17,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 13.38m (43.90ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: COVERED BRIDGE RD, WILLO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.086,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.38m (43.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,292,000,  Roadway Improvement Cost: $1,928,000,  Total Project Cost: $5,220,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1063421,  Location: .5 MI NW OF SH17- EXIT 96 (Lat: 41.909997,  Lng: -74.826631),  Route carried "on" structure: State highway 17,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: CR 179
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.440,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 67.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.49m (24.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,017,000,  Roadway Improvement Cost: $1,181,000,  Total Project Cost: $3,198,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1063422,  Location: .5 MI NW OF SH17- EXIT 96 (Lat: 41.909783,  Lng: -74.826553),  Route carried "on" structure: State highway 17,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 4,435 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,921 (year 2040),  Design Load: HS 20,  Features Intersected: CR 179
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.440,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.34m (24.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,955,000,  Roadway Improvement Cost: $1,145,000,  Total Project Cost: $3,099,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222918,  Location: 3.3 MILES NW OF DEBRUCE (Lat: 41.939483,  Lng: -74.767944),  Route carried "on" structure: Other road ,  Year Built: 1940,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 244 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 342 (year 2037),  Features Intersected: SPRAGUE BROOK,  Facility Carried by Structure: GROOVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.682,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $424,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222922,  Location: TH44-OFF CR92 AT ROSCOE (Lat: 41.932694,  Lng: -74.919919),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 18 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 25 (year 2039),  Features Intersected: ABE WOOD BROOK,  Facility Carried by Structure: PUNCHBOWL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 78.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $134,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $212,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222923,  Location: FINCH STREET (Lat: 41.898161,  Lng: -74.831683),  Route carried "on" structure: Spur Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 85 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 119 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CATTAIL BROOK,  Facility Carried by Structure: FINCH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $194,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $307,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 227091,  Location: 0.4 MILES SW OF LIVINGSTO (Lat: 41.895033,  Lng: -74.832764),  Route carried "on" structure: Other road ,  Year Built: 2012,  Status: Open,  Structure Length: 1.25m (4.10ft),  Truck Traffic: 6%,  Features Intersected: CATTAIL BROOK,  Facility Carried by Structure: HOOS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $284,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $451,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335572,  Location: 1.8 MI E OF LIVNGSTON MNR (Lat: 41.904936,  Lng: -74.793808),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 802 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,123 (year 2036),  Features Intersected: TB WILLOWEMOC CRK,  Facility Carried by Structure: DEBRUCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.073,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $415,000,  Roadway Improvement Cost: $243,000,  Total Project Cost: $659,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335573,  Location: 2.2 MI E OF EXIT 96 -SH17 (Lat: 41.902394,  Lng: -74.786828),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 802 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,123 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: SPRAGUE BROOK,  Facility Carried by Structure: CR 81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.813,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $455,000,  Roadway Improvement Cost: $266,000,  Total Project Cost: $721,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335574,  Location: .1 MILE WEST OF DEBRUCE (Lat: 41.911064,  Lng: -74.745889),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 405 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 567 (year 2038),  Features Intersected: TB WILLOWEMOC CRK,  Facility Carried by Structure: DEBRUCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.636,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $261,000,  Roadway Improvement Cost: $153,000,  Total Project Cost: $414,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335575,  Location: IN DEBRUCE (Lat: 41.912264,  Lng: -74.729042),  Route carried "on" structure: County highway ,  Year Built: 1948,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 273 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 382 (year 2039),  Design Load: HS 20,  Features Intersected: MONGAUP CREEK,  Facility Carried by Structure: DEBRUCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $394,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $624,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335577,  Location: .7 MILE SW OF ROSCOE (Lat: 41.918294,  Lng: -74.931767),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 655 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 917 (year 2040),  Design Load: HS 20,  Features Intersected: ABE WOOD BROOK,  Facility Carried by Structure: TENNANAH LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.487,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 79.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $235,000,  Total Project Cost: $636,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335578,  Location: .5 MILE WEST OF ROSCOE (Lat: 41.929833,  Lng: -74.924744),  Route carried "on" structure: County highway ,  Year Built: 1961,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 655 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 917 (year 2040),  Design Load: HS 20,  Features Intersected: ABE WOOD BROOK,  Facility Carried by Structure: TENNANAH LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.779,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $503,000,  Roadway Improvement Cost: $295,000,  Total Project Cost: $798,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335596,  Location: 1.9 MILES SE OF ROSCOE (Lat: 41.907814,  Lng: -74.897858),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 420 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 588 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: STEWART BROOK,  Facility Carried by Structure: COUNTY ROAD 123
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.783,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $832,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335597,  Location: .5 MILE SE OF ROSCOE (Lat: 41.925375,  Lng: -74.908550),  Route carried "on" structure: County highway ,  Year Built: 1919,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 626 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 876 (year 2038),  Features Intersected: STEWART BROOK,  Facility Carried by Structure: COUNTY ROAD 124
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.357,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $226,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $359,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335598,  Location: IN ROSCOE (Lat: 41.930492,  Lng: -74.914694),  Route carried "on" structure: County highway ,  Year Built: 1969,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 1,645 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,303 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: WILLOWEMOC CREEK,  Facility Carried by Structure: CR 124
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.4m (99.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 9.23m (30.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,654,000,  Roadway Improvement Cost: $1,554,000,  Total Project Cost: $4,208,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 335606,  Location: 0.5 MI S OF MORSSTON (Lat: 41.880414,  Lng: -74.808922),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 531 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 743 (year 2038),  Design Load: HS 20,  Features Intersected: LITTLE BEAVERKILL,  Facility Carried by Structure: COUNTY ROAD 146
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.114,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $794,000,  Roadway Improvement Cost: $465,000,  Total Project Cost: $1,258,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335609,  Location: 1.4 MILES SW OF LIV MANOR (Lat: 41.887478,  Lng: -74.836833),  Route carried "on" structure: County highway ,  Year Built: 1953,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 825 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,155 (year 2037),  Design Load: HS 20,  Features Intersected: CATTAIL BROOK,  Facility Carried by Structure: COUNTY ROAD 149
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.842,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $772,000,  Roadway Improvement Cost: $452,000,  Total Project Cost: $1,224,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33561,  Location: 1.1 MI SW OF LIV MANOR (Lat: 41.892019,  Lng: -74.835067),  Route carried "on" structure: County highway ,  Year Built: 1953,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 825 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,155 (year 2037),  Features Intersected: CATTAIL BROOK,  Facility Carried by Structure: SHANDELEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.357,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $708,000,  Roadway Improvement Cost: $414,000,  Total Project Cost: $1,122,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Rockland, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.