Bridge Statistics for San Antonio, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,606Number of bridges
- 57,940ft / 17,660mTotal length
- $136,861,000Total costs
- 79,749,417Total average daily traffic
- 4,924,125Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for San Antonio
- No street view available for this location
- New bridges - historical statistics
- 41900-1909
- 41910-1919
- 301920-1929
- 491930-1939
- 421940-1949
- 1161950-1959
- 6171960-1969
- 2631970-1979
- 4781980-1989
- 3851990-1999
- 2992000-2009
- 2512010-2019
- 682020-2022
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 01930-1939
- 11940-1949
- 201950-1959
- 171960-1969
- 241970-1979
- 981980-1989
- 591990-1999
- 942000-2009
- 472010-2019
- 52020-2022
- Bridge Condition - Deck
- 11.9%Excellent
- 58.2%Very good
- 26.3%Good
- 2.7%Satisfactory
- 0.7%Fair
- 0.2%Poor
- Bridge Condition - Superstructure
- 1.4%Excellent
- 20.8%Very good
- 47.5%Good
- 28.2%Satisfactory
- 1.8%Fair
- 0.3%Poor
- Bridge Condition - Substructure
- 0.3%Excellent
- 9.6%Very good
- 60.8%Good
- 26.0%Satisfactory
- 3.1%Fair
- Bridge Condition - Channel
- 12.4%Very good
- 56.8%Good
- 27.0%Satisfactory
- 3.3%Fair
- 0.3%Poor
- Bridge Condition - Culverts
- 1.0%Very good
- 57.4%Good
- 39.2%Satisfactory
- 2.2%Fair
- 0.1%Poor
Find on map >> Show street view
Structure Number: AFTXMPLS00031, Location: 0.1 MILES NORTH OF TRUEMP (Lat: 29.390267, Lng: -98.616106), Route carried "on" structure: Federal lands road , Year Built: 1992, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 3,000 (year 2016), Average Future Daily Traffic: 3,600 (year 2036), Design Load: HS 15, Features Intersected: DRAINAGE, Facility Carried by Structure: KENLY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Owner: Air Force, Approaching Roadway Width: 14.6m (47.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.1m (6.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 18.4m (60.4ft)
Condition: Channel: Good, Culverts: Fair, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020
Structure Number: AFTXMPLS00031, Location: 0.1 MILES NORTH OF TRUEMP (Lat: 29.390267, Lng: -98.616106), Route carried "on" structure: Federal lands road , Year Built: 1992, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 3,000 (year 2016), Average Future Daily Traffic: 3,600 (year 2036), Design Load: HS 15, Features Intersected: DRAINAGE, Facility Carried by Structure: KENLY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Owner: Air Force, Approaching Roadway Width: 14.6m (47.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.1m (6.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 18.4m (60.4ft)
Condition: Channel: Good, Culverts: Fair, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020
Find on map >> Show street view
Structure Number: AFTXMPLS00032, Location: 0.5 MILES FROM LUKE BOULE (Lat: 29.388558, Lng: -98.620336), Route carried "on" structure: Federal lands road , Year Built: 1995, Status: Open, Structure Length: 0.84m (2.76ft), Average Daily Traffic: 250 (year 2016), Average Future Daily Traffic: 300 (year 2036), Design Load: HS 15, Features Intersected: DRAINAGE, Facility Carried by Structure: BONG AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 8.5m (27.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.4m (7.9ft), Curb-To-Curb Width: 9.4m (30.8ft), Out-to-Out Width: 11.8m (38.7ft)
Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: AFTXMPLS00032, Location: 0.5 MILES FROM LUKE BOULE (Lat: 29.388558, Lng: -98.620336), Route carried "on" structure: Federal lands road , Year Built: 1995, Status: Open, Structure Length: 0.84m (2.76ft), Average Daily Traffic: 250 (year 2016), Average Future Daily Traffic: 300 (year 2036), Design Load: HS 15, Features Intersected: DRAINAGE, Facility Carried by Structure: BONG AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 8.5m (27.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.4m (7.9ft), Curb-To-Curb Width: 9.4m (30.8ft), Out-to-Out Width: 11.8m (38.7ft)
Condition: Channel: Good, Culverts: Satisfactory, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: AFTXMPLS00033, Location: 0.2 MILES SOUTH OF MOREY (Lat: 29.389181, Lng: -98.587908), Route carried "on" structure: Federal lands road , Year Built: 1955, Status: Open, Structure Length: 0.77m (2.53ft), Average Daily Traffic: 2,500 (year 2016), Average Future Daily Traffic: 3,000 (year 2036), Design Load: HS 15, Features Intersected: DRAINAGE, Facility Carried by Structure: GROWDON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 10.5m (34.4ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.4m (7.9ft), Curb-To-Curb Width: 10.5m (34.4ft), Out-to-Out Width: 21.3m (69.9ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: AFTXMPLS00033, Location: 0.2 MILES SOUTH OF MOREY (Lat: 29.389181, Lng: -98.587908), Route carried "on" structure: Federal lands road , Year Built: 1955, Status: Open, Structure Length: 0.77m (2.53ft), Average Daily Traffic: 2,500 (year 2016), Average Future Daily Traffic: 3,000 (year 2036), Design Load: HS 15, Features Intersected: DRAINAGE, Facility Carried by Structure: GROWDON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 10.5m (34.4ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.4m (7.9ft), Curb-To-Curb Width: 10.5m (34.4ft), Out-to-Out Width: 21.3m (69.9ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: AFTXMPLS00102, Location: 0.3 MILES FROM GATE ON RA (Lat: 29.373083, Lng: -98.650889), Route carried "on" structure: Federal lands road , Year Built: 2003, Status: Open, Structure Length: 1.65m (5.41ft), Average Daily Traffic: 3,000 (year 2014), Average Future Daily Traffic: 3,600 (year 2034), Design Load: HS 20, Features Intersected: APOLLO DRIVE, Facility Carried by Structure: MEDINA BASE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Owner: Air Force, Approaching Roadway Width: 15.2m (49.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 4.3m (14.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.6m (5.2ft)
Condition: Channel: Fair, Culverts: Fair, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: AFTXMPLS00102, Location: 0.3 MILES FROM GATE ON RA (Lat: 29.373083, Lng: -98.650889), Route carried "on" structure: Federal lands road , Year Built: 2003, Status: Open, Structure Length: 1.65m (5.41ft), Average Daily Traffic: 3,000 (year 2014), Average Future Daily Traffic: 3,600 (year 2034), Design Load: HS 20, Features Intersected: APOLLO DRIVE, Facility Carried by Structure: MEDINA BASE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Owner: Air Force, Approaching Roadway Width: 15.2m (49.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 4.3m (14.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.6m (5.2ft)
Condition: Channel: Fair, Culverts: Fair, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: AFTXMPLS00156, Location: ENTER GATE ON RAY ELLISON (Lat: 29.374528, Lng: -98.648306), Route carried "on" structure: Federal lands road , Year Built: 2003, Status: Open, Structure Length: 1.15m (3.77ft), Average Daily Traffic: 200 (year 2014), Average Future Daily Traffic: 240 (year 2034), Design Load: HS 20, Features Intersected: HILL RISE ROAD, Facility Carried by Structure: MEDINA BASE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 9.1m (29.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.6m (11.8ft)
Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: AFTXMPLS00156, Location: ENTER GATE ON RAY ELLISON (Lat: 29.374528, Lng: -98.648306), Route carried "on" structure: Federal lands road , Year Built: 2003, Status: Open, Structure Length: 1.15m (3.77ft), Average Daily Traffic: 200 (year 2014), Average Future Daily Traffic: 240 (year 2034), Design Load: HS 20, Features Intersected: HILL RISE ROAD, Facility Carried by Structure: MEDINA BASE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 9.1m (29.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.6m (11.8ft)
Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: AFTXMPLS0024, Location: 0.7 MILES FROM GATE AT RA (Lat: 29.372083, Lng: -98.658222), Route carried "on" structure: Federal lands road , Year Built: 1954, Status: Open, Structure Length: 4.72m (15.49ft), Average Daily Traffic: 5,000 (year 2014), Average Future Daily Traffic: 6,000 (year 2034), Design Load: HS 20, Features Intersected: MEDIO CREEK, Facility Carried by Structure: MEDINA BASE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 9.4m (30.8ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.9m (32.5ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Bridge Improvement Cost: $55,000, Roadway Improvement Cost: $6,000, Total Project Cost: $83,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: AFTXMPLS0024, Location: 0.7 MILES FROM GATE AT RA (Lat: 29.372083, Lng: -98.658222), Route carried "on" structure: Federal lands road , Year Built: 1954, Status: Open, Structure Length: 4.72m (15.49ft), Average Daily Traffic: 5,000 (year 2014), Average Future Daily Traffic: 6,000 (year 2034), Design Load: HS 20, Features Intersected: MEDIO CREEK, Facility Carried by Structure: MEDINA BASE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 9.4m (30.8ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.9m (32.5ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Bridge Improvement Cost: $55,000, Roadway Improvement Cost: $6,000, Total Project Cost: $83,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: AFTXMPLS00906, Location: 0.5 MILES FROM INTERSECTI (Lat: 29.382556, Lng: -98.596667), Route carried "on" structure: Federal lands road , Year Built: 1960, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 4,560 (year 2014), Average Future Daily Traffic: 5,472 (year 2034), Design Load: HS 15, Features Intersected: LEON CREEK, Facility Carried by Structure: HALL STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.3m (10.8ft), Curb-To-Curb Width: 7.0m (23.0ft), Out-to-Out Width: 8.4m (27.6ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: Febuary 2020, Underwater Inspection Date: Febuary 2019, Bridge Improvement Cost: $110,000, Roadway Improvement Cost: $11,000, Total Project Cost: $165,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: AFTXMPLS00906, Location: 0.5 MILES FROM INTERSECTI (Lat: 29.382556, Lng: -98.596667), Route carried "on" structure: Federal lands road , Year Built: 1960, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 4,560 (year 2014), Average Future Daily Traffic: 5,472 (year 2034), Design Load: HS 15, Features Intersected: LEON CREEK, Facility Carried by Structure: HALL STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.3m (10.8ft), Curb-To-Curb Width: 7.0m (23.0ft), Out-to-Out Width: 8.4m (27.6ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: Febuary 2020, Underwater Inspection Date: Febuary 2019, Bridge Improvement Cost: $110,000, Roadway Improvement Cost: $11,000, Total Project Cost: $165,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: AFTXMPLS018, Location: AT EAST EDGE OF STILLMAN (Lat: 29.387444, Lng: -98.608639), Route carried "on" structure: Federal lands road , Year Built: 1942, Status: Open, Structure Length: 6.10m (20.01ft), Average Daily Traffic: 5,390 (year 2014), Average Future Daily Traffic: 6,468 (year 2034), Design Load: HS 15, Features Intersected: LEON CREEK, Facility Carried by Structure: KELLY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 10.3m (33.8ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 6.1m (20.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.4m (27.6ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: Febuary 2020, Underwater Inspection Date: Febuary 2019, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: AFTXMPLS018, Location: AT EAST EDGE OF STILLMAN (Lat: 29.387444, Lng: -98.608639), Route carried "on" structure: Federal lands road , Year Built: 1942, Status: Open, Structure Length: 6.10m (20.01ft), Average Daily Traffic: 5,390 (year 2014), Average Future Daily Traffic: 6,468 (year 2034), Design Load: HS 15, Features Intersected: LEON CREEK, Facility Carried by Structure: KELLY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 10.3m (33.8ft), Material/Design: Concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 6.1m (20.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.4m (27.6ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: Febuary 2020, Underwater Inspection Date: Febuary 2019, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: AFTXMPLS02107, Location: 1.25 MILES FROM VALLEY HI (Lat: 29.387583, Lng: -98.620917), Route carried "on" structure: Federal lands road , Year Built: 1994, Status: Open, Structure Length: 9.75m (31.99ft), Average Daily Traffic: 32,000 (year 2014), Average Future Daily Traffic: 38,400 (year 2034), Design Load: HS 20, Features Intersected: LOOP 13, Facility Carried by Structure: TRUEMPER STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 6, Owner: Air Force, Approaching Roadway Width: 21.3m (69.9ft), Skew: 30 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 24.4m (80.1ft), Curb or Sidewalk Widths: Left: 3.3m (10.8ft), Right: 3.4m (11.2ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 25.5m (83.7ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Bridge Improvement Cost: $85,000, Roadway Improvement Cost: $9,000, Total Project Cost: $128,000, Deck Structure Type: Concrete Cast-file-Place
Structure Number: AFTXMPLS02107, Location: 1.25 MILES FROM VALLEY HI (Lat: 29.387583, Lng: -98.620917), Route carried "on" structure: Federal lands road , Year Built: 1994, Status: Open, Structure Length: 9.75m (31.99ft), Average Daily Traffic: 32,000 (year 2014), Average Future Daily Traffic: 38,400 (year 2034), Design Load: HS 20, Features Intersected: LOOP 13, Facility Carried by Structure: TRUEMPER STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 6, Owner: Air Force, Approaching Roadway Width: 21.3m (69.9ft), Skew: 30 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 24.4m (80.1ft), Curb or Sidewalk Widths: Left: 3.3m (10.8ft), Right: 3.4m (11.2ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 25.5m (83.7ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Bridge Improvement Cost: $85,000, Roadway Improvement Cost: $9,000, Total Project Cost: $128,000, Deck Structure Type: Concrete Cast-file-Place
Find on map >> Show street view
Structure Number: AFTXMPLS10302, Location: AT INTERSECTION WITH CHAP (Lat: 29.387194, Lng: -98.600306), Route carried "on" structure: Federal lands road , Year Built: 1960, Status: Open, Structure Length: 1.83m (6.00ft), Average Daily Traffic: 5,020 (year 2014), Average Future Daily Traffic: 6,024 (year 2034), Design Load: HS 15, Features Intersected: DRAW, Facility Carried by Structure: KELLY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 10.3m (33.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 6.1m (20.0ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.3m (33.8ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Poor, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Bridge Improvement Cost: $85,000, Roadway Improvement Cost: $9,000, Total Project Cost: $128,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: AFTXMPLS10302, Location: AT INTERSECTION WITH CHAP (Lat: 29.387194, Lng: -98.600306), Route carried "on" structure: Federal lands road , Year Built: 1960, Status: Open, Structure Length: 1.83m (6.00ft), Average Daily Traffic: 5,020 (year 2014), Average Future Daily Traffic: 6,024 (year 2034), Design Load: HS 15, Features Intersected: DRAW, Facility Carried by Structure: KELLY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Air Force, Approaching Roadway Width: 10.3m (33.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 6.1m (20.0ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.3m (33.8ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Poor, Operating Rating: 36.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2020, Bridge Improvement Cost: $85,000, Roadway Improvement Cost: $9,000, Total Project Cost: $128,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: DAPAMCRIV00003B, Location: ELLIOTT LAKE SPILLWAY (Lat: 33.380250, Lng: -94.262219), Route carried "on" structure: Other road , Year Built: 1996, Status: Open, Structure Length: 10.10m (33.14ft), Average Daily Traffic: 50 (year 2018), Truck Traffic: 15%, Average Future Daily Traffic: 120 (year 2042), Design Load: HS 20, Features Intersected: ELLIOTT LAKE, Facility Carried by Structure: LAKE RD.
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Number Of Approach Spans: 1, Length of Maximum Span: 24.4m (80.1ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 47.0 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.36m (11.02ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2020), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Gravel
Structure Number: DAPAMCRIV00003B, Location: ELLIOTT LAKE SPILLWAY (Lat: 33.380250, Lng: -94.262219), Route carried "on" structure: Other road , Year Built: 1996, Status: Open, Structure Length: 10.10m (33.14ft), Average Daily Traffic: 50 (year 2018), Truck Traffic: 15%, Average Future Daily Traffic: 120 (year 2042), Design Load: HS 20, Features Intersected: ELLIOTT LAKE, Facility Carried by Structure: LAKE RD.
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Number Of Approach Spans: 1, Length of Maximum Span: 24.4m (80.1ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Very good, Operating Rating: 60.8 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 47.0 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.36m (11.02ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2020), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >> Show street view
Structure Number: DAPAMCSTA000002, Location: NEAR BLDG 200 (Lat: 29.708761, Lng: -98.622000), Route carried "on" structure: Other road , Year Built: 1975, Status: Posted for load, Structure Length: 1.71m (5.61ft), Average Daily Traffic: 200 (year 2018), Truck Traffic: 12%, Average Future Daily Traffic: 300 (year 2043), Features Intersected: SALADO CREEK, Facility Carried by Structure: BUTLER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.8m (55.1ft), Curb-To-Curb Width: 6.9m (22.6ft), Out-to-Out Width: 7.3m (24.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 34.6 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 26.7 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 2.41m (7.91ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: DAPAMCSTA000002, Location: NEAR BLDG 200 (Lat: 29.708761, Lng: -98.622000), Route carried "on" structure: Other road , Year Built: 1975, Status: Posted for load, Structure Length: 1.71m (5.61ft), Average Daily Traffic: 200 (year 2018), Truck Traffic: 12%, Average Future Daily Traffic: 300 (year 2043), Features Intersected: SALADO CREEK, Facility Carried by Structure: BUTLER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.8m (55.1ft), Curb-To-Curb Width: 6.9m (22.6ft), Out-to-Out Width: 7.3m (24.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 34.6 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 26.7 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 2.41m (7.91ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2021), Deck Structure Type: Concrete Precast Panels, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: DAPAMCSTA0000C3, Location: BTN RD NO H-18 & G-16 (Lat: 29.700381, Lng: -98.622831), Route carried "on" structure: Other road , Year Built: 1989, Status: Open, Structure Length: 1.15m (3.77ft), Average Daily Traffic: 200 (year 2018), Truck Traffic: 12%, Average Future Daily Traffic: 300 (year 2043), Features Intersected: TRIB TO SALADO CREEK, Facility Carried by Structure: BUTLER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 2.7m (8.9ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 8.7m (28.5ft), Out-to-Out Width: 9.2m (30.2ft)
Condition: Channel: Good, Culverts: Good, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.83m (6.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2021)
Structure Number: DAPAMCSTA0000C3, Location: BTN RD NO H-18 & G-16 (Lat: 29.700381, Lng: -98.622831), Route carried "on" structure: Other road , Year Built: 1989, Status: Open, Structure Length: 1.15m (3.77ft), Average Daily Traffic: 200 (year 2018), Truck Traffic: 12%, Average Future Daily Traffic: 300 (year 2043), Features Intersected: TRIB TO SALADO CREEK, Facility Carried by Structure: BUTLER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 2.7m (8.9ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 8.7m (28.5ft), Out-to-Out Width: 9.2m (30.2ft)
Condition: Channel: Good, Culverts: Good, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.83m (6.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCSTA0000C8, Location: NEAR HUNTING RD 14 (Lat: 29.677131, Lng: -98.627731), Route carried "on" structure: Other road , Year Built: 1989, Year Reconstructed: 2008, Status: Open, Structure Length: 0.70m (2.30ft), Average Daily Traffic: 200 (year 2018), Truck Traffic: 12%, Average Future Daily Traffic: 300 (year 2043), Features Intersected: STORM DRAINAGE, Facility Carried by Structure: SOUTH OUTER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.6m (21.7ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 1.8m (5.9ft)
Condition: Channel: Good, Culverts: Good, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.68m (5.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2021)
Structure Number: DAPAMCSTA0000C8, Location: NEAR HUNTING RD 14 (Lat: 29.677131, Lng: -98.627731), Route carried "on" structure: Other road , Year Built: 1989, Year Reconstructed: 2008, Status: Open, Structure Length: 0.70m (2.30ft), Average Daily Traffic: 200 (year 2018), Truck Traffic: 12%, Average Future Daily Traffic: 300 (year 2043), Features Intersected: STORM DRAINAGE, Facility Carried by Structure: SOUTH OUTER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.6m (21.7ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 1.8m (5.9ft)
Condition: Channel: Good, Culverts: Good, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.68m (5.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCSTA0000P5, Location: BTW BUTLER DR & MOYER RD (Lat: 29.710961, Lng: -98.617361), Route carried "on" structure: Other road , Year Built: 2011, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 200 (year 2018), Truck Traffic: 12%, Average Future Daily Traffic: 300 (year 2043), Features Intersected: STORM DRAINAGE, Facility Carried by Structure: EAST OUTER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.4m (7.9ft)
Condition: Channel: Good, Culverts: Good, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.50m (4.92ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2021)
Structure Number: DAPAMCSTA0000P5, Location: BTW BUTLER DR & MOYER RD (Lat: 29.710961, Lng: -98.617361), Route carried "on" structure: Other road , Year Built: 2011, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 200 (year 2018), Truck Traffic: 12%, Average Future Daily Traffic: 300 (year 2043), Features Intersected: STORM DRAINAGE, Facility Carried by Structure: EAST OUTER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 7.6m (24.9ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 2.4m (7.9ft)
Condition: Channel: Good, Culverts: Good, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.50m (4.92ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCSTA000P1, Location: 25 MI S OF E PASTURE GATE (Lat: 29.690350, Lng: -98.610039), Route carried "on" structure: Other road , Year Built: 2008, Status: Open, Structure Length: 3.81m (12.50ft), Average Daily Traffic: 20 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 25 (year 2043), Features Intersected: SALADO CREEK, Facility Carried by Structure: EAST OUTER DR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.6m (21.7ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 7, Length of Maximum Span: 5.2m (17.1ft)
Condition: Channel: Good, Culverts: Fair, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 35.9 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.73m (15.52ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2021)
Structure Number: DAPAMCSTA000P1, Location: 25 MI S OF E PASTURE GATE (Lat: 29.690350, Lng: -98.610039), Route carried "on" structure: Other road , Year Built: 2008, Status: Open, Structure Length: 3.81m (12.50ft), Average Daily Traffic: 20 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 25 (year 2043), Features Intersected: SALADO CREEK, Facility Carried by Structure: EAST OUTER DR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.6m (21.7ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 7, Length of Maximum Span: 5.2m (17.1ft)
Condition: Channel: Good, Culverts: Fair, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 35.9 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.73m (15.52ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCSTA000P12, Location: OUTSIDE EAST GATE (Lat: 29.691311, Lng: -98.606950), Route carried "on" structure: Other road , Year Built: 2008, Status: Open, Structure Length: 2.54m (8.33ft), Average Daily Traffic: 20 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 25 (year 2043), Features Intersected: TRIB SALADO CREEK, Facility Carried by Structure: RD OUTSIDE E GATE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.6m (21.7ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 5, Length of Maximum Span: 4.2m (13.8ft)
Condition: Channel: Good, Culverts: Good, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 34.9 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.42m (11.22ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2021)
Structure Number: DAPAMCSTA000P12, Location: OUTSIDE EAST GATE (Lat: 29.691311, Lng: -98.606950), Route carried "on" structure: Other road , Year Built: 2008, Status: Open, Structure Length: 2.54m (8.33ft), Average Daily Traffic: 20 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 25 (year 2043), Features Intersected: TRIB SALADO CREEK, Facility Carried by Structure: RD OUTSIDE E GATE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.6m (21.7ft), Skew: 2 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 5, Length of Maximum Span: 4.2m (13.8ft)
Condition: Channel: Good, Culverts: Good, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 34.9 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 3.42m (11.22ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $1,000, Total Project Cost: $2,000 ( Estimate for 2021)
Structure Number: 150150001607155, Location: 3.77 MI S OF SH 218, Route carried "under" structure: City street 306, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 35,840 (year 2010), Features Intersected: STARLIGHT TERRACE, Facility Carried by Structure: IH 35 SBML
Minimum Vertical Clearance: 7.06m (23.16ft), Kilometerpoint: 0.048, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Minimum Vertical Clearance: 7.06m (23.16ft), Kilometerpoint: 0.048, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Structure Number: 150150001607156, Location: 3.77 MI S OF SH 218, Route carried "under" structure: City street 2705, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 35,840 (year 2010), Features Intersected: STARLIGHT TERRACE, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.048, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 0.048, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Find on map >> Show street view
Structure Number: 150150001607161, Location: 2.05 MI S OF SH 218 (Lat: 29.552142, Lng: -98.355331), Route carried "under" structure: Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 178,950 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 ML, Facility Carried by Structure: JUDSON RD
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 58.991, Lanes on structure: 6, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.6m (74.1ft)
Structure Number: 150150001607161, Location: 2.05 MI S OF SH 218 (Lat: 29.552142, Lng: -98.355331), Route carried "under" structure: Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 178,950 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 ML, Facility Carried by Structure: JUDSON RD
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 58.991, Lanes on structure: 6, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.6m (74.1ft)
Find on map >> Show street view
Structure Number: 150150001607162, Location: 2.24 MI S OF SH 218 (Lat: 29.545575, Lng: -98.368919), Route carried "under" structure: Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 178,950 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 ML, Facility Carried by Structure: O'CONNOR RD
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 58.286, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.6m (74.1ft)
Structure Number: 150150001607162, Location: 2.24 MI S OF SH 218 (Lat: 29.545575, Lng: -98.368919), Route carried "under" structure: Interstate 35, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 178,950 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 ML, Facility Carried by Structure: O'CONNOR RD
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 58.286, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.6m (74.1ft)
Find on map >> Show street view
Structure Number: 150150001607163, Location: 2.98 MI S OF SH 218 (Lat: 29.539786, Lng: -98.379228), Route carried "under" structure: City street 6405, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 8,530 (year 2010), Features Intersected: WEIDNER RD, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Structure Number: 150150001607163, Location: 2.98 MI S OF SH 218 (Lat: 29.539786, Lng: -98.379228), Route carried "under" structure: City street 6405, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 8,530 (year 2010), Features Intersected: WEIDNER RD, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Find on map >> Show street view
Structure Number: 150150001607164, Location: 2.98 MI S OF SH 218 (Lat: 29.539894, Lng: -98.379228), Route carried "under" structure: City street 6405, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 8,530 (year 2010), Features Intersected: WEIDNER RD, Facility Carried by Structure: IH 35 SBML
Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 4.023, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Structure Number: 150150001607164, Location: 2.98 MI S OF SH 218 (Lat: 29.539894, Lng: -98.379228), Route carried "under" structure: City street 6405, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 8,530 (year 2010), Features Intersected: WEIDNER RD, Facility Carried by Structure: IH 35 SBML
Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 4.023, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.0m (95.1ft)
Find on map >> Show street view
Structure Number: 150150001608027, Location: 0.60 MI NE OF EISENHAUER (Lat: 29.500183, Lng: -98.421372), Route carried "under" structure: City street , Year Built: 1934, Structure Length: 0. m, Average Daily Traffic: 1,960 (year 2010), Truck Traffic: 1%, Features Intersected: SALADO CRK & IRA LEE RD, Facility Carried by Structure: SL368 (AUSTIN HWY)
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 2.157, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Tee Beam, Length of Maximum Span: 8.8m (28.9ft)
Structure Number: 150150001608027, Location: 0.60 MI NE OF EISENHAUER (Lat: 29.500183, Lng: -98.421372), Route carried "under" structure: City street , Year Built: 1934, Structure Length: 0. m, Average Daily Traffic: 1,960 (year 2010), Truck Traffic: 1%, Features Intersected: SALADO CRK & IRA LEE RD, Facility Carried by Structure: SL368 (AUSTIN HWY)
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 2.157, Lanes on structure: 5, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Tee Beam, Length of Maximum Span: 8.8m (28.9ft)
Find on map >> Show street view
Structure Number: 150150001608426, Location: 2.9 MI SW OF IH 410 (Lat: 29.493625, Lng: -98.433694), Route carried "under" structure: City street , Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 26,000 (year 2011), Features Intersected: HARRY WURZBACH RD, Facility Carried by Structure: LP368 (AUSTIN HWY)
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 4.989, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 13.7m (44.9ft)
Structure Number: 150150001608426, Location: 2.9 MI SW OF IH 410 (Lat: 29.493625, Lng: -98.433694), Route carried "under" structure: City street , Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 26,000 (year 2011), Features Intersected: HARRY WURZBACH RD, Facility Carried by Structure: LP368 (AUSTIN HWY)
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 4.989, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 13.7m (44.9ft)
Find on map >> Show street view
Structure Number: 150150001702269, Location: 0.80 MI S OF IH 410 (Lat: 29.310197, Lng: -98.616481), Route carried "under" structure: Interstate 35, Year Built: 1974, Structure Length: 0. m, Average Daily Traffic: 41,690 (year 2013), Truck Traffic: 20%, Features Intersected: IH 35, Facility Carried by Structure: FISCHER RD
Minimum Vertical Clearance: 5.01m (16.44ft), Kilometerpoint: 19.103, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.0m (82.0ft)
Structure Number: 150150001702269, Location: 0.80 MI S OF IH 410 (Lat: 29.310197, Lng: -98.616481), Route carried "under" structure: Interstate 35, Year Built: 1974, Structure Length: 0. m, Average Daily Traffic: 41,690 (year 2013), Truck Traffic: 20%, Features Intersected: IH 35, Facility Carried by Structure: FISCHER RD
Minimum Vertical Clearance: 5.01m (16.44ft), Kilometerpoint: 19.103, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.0m (82.0ft)
Find on map >> Show street view
Structure Number: 150150001702304, Location: 5.75 MI S OF LP 13 (Lat: 29.317189, Lng: -98.608400), Route carried "under" structure: Interstate 410, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 49,160 (year 2013), Truck Traffic: 8%, Features Intersected: IH 410, Facility Carried by Structure: IH 35 SBFR
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.821, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Structure Number: 150150001702304, Location: 5.75 MI S OF LP 13 (Lat: 29.317189, Lng: -98.608400), Route carried "under" structure: Interstate 410, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 49,160 (year 2013), Truck Traffic: 8%, Features Intersected: IH 410, Facility Carried by Structure: IH 35 SBFR
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.821, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Find on map >> Show street view
Structure Number: 150150001702305, Location: 5.75 MI S OF LP 13 (Lat: 29.317142, Lng: -98.608253), Route carried "under" structure: Interstate 410, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 49,160 (year 2013), Truck Traffic: 8%, Features Intersected: IH 410, Facility Carried by Structure: IH 35 SB ML
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 0.813, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Structure Number: 150150001702305, Location: 5.75 MI S OF LP 13 (Lat: 29.317142, Lng: -98.608253), Route carried "under" structure: Interstate 410, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 49,160 (year 2013), Truck Traffic: 8%, Features Intersected: IH 410, Facility Carried by Structure: IH 35 SB ML
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 0.813, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Find on map >> Show street view
Structure Number: 150150001702306, Location: 5.75 MI S OF LP 13 (Lat: 29.316414, Lng: -98.608614), Route carried "under" structure: Interstate 410, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 34,780 (year 2013), Truck Traffic: 10%, Features Intersected: IH 410, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 85.432, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Structure Number: 150150001702306, Location: 5.75 MI S OF LP 13 (Lat: 29.316414, Lng: -98.608614), Route carried "under" structure: Interstate 410, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 34,780 (year 2013), Truck Traffic: 10%, Features Intersected: IH 410, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 85.432, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Find on map >> Show street view
Structure Number: 150150001702307, Location: 5.75 MI S OF LP 13 (Lat: 29.316372, Lng: -98.608458), Route carried "under" structure: Interstate 410, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 34,780 (year 2013), Truck Traffic: 10%, Features Intersected: IH 410, Facility Carried by Structure: IH 35 NBFR
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 85.413, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Structure Number: 150150001702307, Location: 5.75 MI S OF LP 13 (Lat: 29.316372, Lng: -98.608458), Route carried "under" structure: Interstate 410, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 34,780 (year 2013), Truck Traffic: 10%, Features Intersected: IH 410, Facility Carried by Structure: IH 35 NBFR
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 85.413, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Find on map >> Show street view
Structure Number: 150150001702385, Location: 0.7 MI SW OF IH 410 (Lat: 29.310069, Lng: -98.616503), Route carried "under" structure: Interstate 35, Year Built: 2010, Structure Length: 0. m, Average Daily Traffic: 41,690 (year 2013), Truck Traffic: 20%, Features Intersected: IH 35 ML
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 19.093, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft)
Structure Number: 150150001702385, Location: 0.7 MI SW OF IH 410 (Lat: 29.310069, Lng: -98.616503), Route carried "under" structure: Interstate 35, Year Built: 2010, Structure Length: 0. m, Average Daily Traffic: 41,690 (year 2013), Truck Traffic: 20%, Features Intersected: IH 35 ML
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 19.093, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft)
Find on map >> Show street view
Structure Number: 150150001709108, Location: 1.80 MI SW OF LP 13 (Lat: 29.343614, Lng: -98.551028), Route carried "under" structure: State highway 422, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 22,340 (year 2013), Truck Traffic: 8%, Features Intersected: SPUR 422, Facility Carried by Structure: IH 35 SB
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 1.988, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 150150001709108, Location: 1.80 MI SW OF LP 13 (Lat: 29.343614, Lng: -98.551028), Route carried "under" structure: State highway 422, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 22,340 (year 2013), Truck Traffic: 8%, Features Intersected: SPUR 422, Facility Carried by Structure: IH 35 SB
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 1.988, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 150150001709109, Location: 1.80 MI SW OF LP 13 (Lat: 29.341961, Lng: -98.550714), Route carried "under" structure: State highway 422, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 22,340 (year 2013), Truck Traffic: 8%, Features Intersected: SPUR 422, Facility Carried by Structure: IH 35 NB
Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 2.179, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 150150001709109, Location: 1.80 MI SW OF LP 13 (Lat: 29.341961, Lng: -98.550714), Route carried "under" structure: State highway 422, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 22,340 (year 2013), Truck Traffic: 8%, Features Intersected: SPUR 422, Facility Carried by Structure: IH 35 NB
Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 2.179, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 15015000170911, Location: 1.90 MI SW OF LP 13 (Lat: 29.341639, Lng: -98.553206), Route carried "under" structure: Ramp State highway 422, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 1 (year 2012), Features Intersected: IH 35 SP 422 INTCHG ROW, Facility Carried by Structure: IH 35 NB
Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 3.428, Lanes on structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 15.2m (49.9ft)
Structure Number: 15015000170911, Location: 1.90 MI SW OF LP 13 (Lat: 29.341639, Lng: -98.553206), Route carried "under" structure: Ramp State highway 422, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 1 (year 2012), Features Intersected: IH 35 SP 422 INTCHG ROW, Facility Carried by Structure: IH 35 NB
Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 3.428, Lanes on structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 15.2m (49.9ft)
Find on map >> Show street view
Structure Number: 150150001709111, Location: 1.70 MI NE OF IH 410 (Lat: 29.329653, Lng: -98.585378), Route carried "under" structure: City street 59, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 2,470 (year 2012), Truck Traffic: 1%, Features Intersected: LEON CREEK / CASSIN RD, Facility Carried by Structure: IH 35 SB
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 1.067, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.6m (70.9ft)
Structure Number: 150150001709111, Location: 1.70 MI NE OF IH 410 (Lat: 29.329653, Lng: -98.585378), Route carried "under" structure: City street 59, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 2,470 (year 2012), Truck Traffic: 1%, Features Intersected: LEON CREEK / CASSIN RD, Facility Carried by Structure: IH 35 SB
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 1.067, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.6m (70.9ft)
Find on map >> Show street view
Structure Number: 150150001709112, Location: 1.70 MI NE OF IH 410 (Lat: 29.329403, Lng: -98.585278), Route carried "under" structure: City street 59, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 2,470 (year 2012), Truck Traffic: 1%, Features Intersected: LEON CREEK / CASSIN RD, Facility Carried by Structure: IH 35 NB
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 1.086, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.6m (70.9ft)
Structure Number: 150150001709112, Location: 1.70 MI NE OF IH 410 (Lat: 29.329403, Lng: -98.585278), Route carried "under" structure: City street 59, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 2,470 (year 2012), Truck Traffic: 1%, Features Intersected: LEON CREEK / CASSIN RD, Facility Carried by Structure: IH 35 NB
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 1.086, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.6m (70.9ft)
Find on map >> Show street view
Structure Number: 150150001709114, Location: 0.6 MI NE OF IH 410 (Lat: 29.323036, Lng: -98.601161), Route carried "under" structure: Ramp State highway 353, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 3,940 (year 2012), Truck Traffic: 7%, Features Intersected: SPUR 353 NB CONN, Facility Carried by Structure: IH 35 SB
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 42.696, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.6m (70.9ft)
Structure Number: 150150001709114, Location: 0.6 MI NE OF IH 410 (Lat: 29.323036, Lng: -98.601161), Route carried "under" structure: Ramp State highway 353, Year Built: 1956, Structure Length: 0. m, Average Daily Traffic: 3,940 (year 2012), Truck Traffic: 7%, Features Intersected: SPUR 353 NB CONN, Facility Carried by Structure: IH 35 SB
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 42.696, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.6m (70.9ft)
Find on map >> Show street view
Structure Number: 15015000170912, Location: 0.40 MI S OF US 90 (Lat: 29.387639, Lng: -98.511978), Route carried "under" structure: City street 340, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 8,850 (year 2011), Truck Traffic: 2%, Features Intersected: THEO & MALONE AVE, Facility Carried by Structure: IH 35 NB
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 2.033, Lanes on structure: 3, Lanes under structure: 7, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 15015000170912, Location: 0.40 MI S OF US 90 (Lat: 29.387639, Lng: -98.511978), Route carried "under" structure: City street 340, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 8,850 (year 2011), Truck Traffic: 2%, Features Intersected: THEO & MALONE AVE, Facility Carried by Structure: IH 35 NB
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 2.033, Lanes on structure: 3, Lanes under structure: 7, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Find on map >> Show street view
Structure Number: 150150001709121, Location: 0.40 MI S OF US 90 (Lat: 29.387686, Lng: -98.512206), Route carried "under" structure: City street 340, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 8,850 (year 2011), Truck Traffic: 2%, Features Intersected: THEO & MALONE AVE, Facility Carried by Structure: IH 35 SB
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 2.013, Lanes on structure: 4, Lanes under structure: 7, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 150150001709121, Location: 0.40 MI S OF US 90 (Lat: 29.387686, Lng: -98.512206), Route carried "under" structure: City street 340, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 8,850 (year 2011), Truck Traffic: 2%, Features Intersected: THEO & MALONE AVE, Facility Carried by Structure: IH 35 SB
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 2.013, Lanes on structure: 4, Lanes under structure: 7, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 150150001709125, Location: 0.9 MI S OF US 90, Route carried "under" structure: City street 96, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 17,290 (year 2012), Truck Traffic: 1%, Features Intersected: DIVISION AVE, Facility Carried by Structure: IH 35 SBML
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 1.630, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Minimum Vertical Clearance: 4.55m (14.93ft), Kilometerpoint: 1.630, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 150150001709126, Location: 0.9 MI S OF US 90, Route carried "under" structure: City street 96, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 17,290 (year 2012), Truck Traffic: 1%, Features Intersected: DIVISION AVE, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 1.650, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 1.650, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 21.3m (69.9ft)
Find on map >> Show street view
Structure Number: 150150001709127, Location: 1.7 MI S OF US 90 (Lat: 29.368725, Lng: -98.518250), Route carried "under" structure: City street 321, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 10,710 (year 2012), Truck Traffic: 1%, Features Intersected: SOUTHCROSS BLVD, Facility Carried by Structure: IH 35 SBML
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 3.973, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 150150001709127, Location: 1.7 MI S OF US 90 (Lat: 29.368725, Lng: -98.518250), Route carried "under" structure: City street 321, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 10,710 (year 2012), Truck Traffic: 1%, Features Intersected: SOUTHCROSS BLVD, Facility Carried by Structure: IH 35 SBML
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 3.973, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 150150001709128, Location: 1.7 MI S OF US 90 (Lat: 29.368214, Lng: -98.518256), Route carried "under" structure: City street 321, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 10,710 (year 2012), Truck Traffic: 1%, Features Intersected: SOUTHCROSS BLVD, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 3.985, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 150150001709128, Location: 1.7 MI S OF US 90 (Lat: 29.368214, Lng: -98.518256), Route carried "under" structure: City street 321, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 10,710 (year 2012), Truck Traffic: 1%, Features Intersected: SOUTHCROSS BLVD, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 3.985, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 150150001709136, Location: 0.65 MI S OF LP 13 (Lat: 29.350483, Lng: -98.534214), Route carried "under" structure: City street 383, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 23,720 (year 2012), Truck Traffic: 2%, Features Intersected: ZARZAMORA BLVD, Facility Carried by Structure: IH 35 SBML
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 12.400, Lanes on structure: 3, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 150150001709136, Location: 0.65 MI S OF LP 13 (Lat: 29.350483, Lng: -98.534214), Route carried "under" structure: City street 383, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 23,720 (year 2012), Truck Traffic: 2%, Features Intersected: ZARZAMORA BLVD, Facility Carried by Structure: IH 35 SBML
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 12.400, Lanes on structure: 3, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 150150001709137, Location: 0.65 MI S OF LP 13 (Lat: 29.350372, Lng: -98.534214), Route carried "under" structure: City street 383, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 23,720 (year 2012), Truck Traffic: 2%, Features Intersected: ZARZAMORA BLVD, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 12.416, Lanes on structure: 3, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 150150001709137, Location: 0.65 MI S OF LP 13 (Lat: 29.350372, Lng: -98.534214), Route carried "under" structure: City street 383, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 23,720 (year 2012), Truck Traffic: 2%, Features Intersected: ZARZAMORA BLVD, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 12.416, Lanes on structure: 3, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 150150001709138, Location: 2.80 MI S OF LP 13 (Lat: 29.337778, Lng: -98.565636), Route carried "under" structure: City street 320, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 5,600 (year 2012), Truck Traffic: 1%, Features Intersected: SOMERSET RD, Facility Carried by Structure: IH 35 SBML
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 5.222, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.8m (78.1ft)
Structure Number: 150150001709138, Location: 2.80 MI S OF LP 13 (Lat: 29.337778, Lng: -98.565636), Route carried "under" structure: City street 320, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 5,600 (year 2012), Truck Traffic: 1%, Features Intersected: SOMERSET RD, Facility Carried by Structure: IH 35 SBML
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 5.222, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.8m (78.1ft)
Find on map >> Show street view
Structure Number: 150150001709139, Location: 2.80 MI S OF LP 13 (Lat: 29.336975, Lng: -98.566831), Route carried "under" structure: City street 320, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 5,600 (year 2012), Truck Traffic: 1%, Features Intersected: SOMERSET RD, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 5.238, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.8m (78.1ft)
Structure Number: 150150001709139, Location: 2.80 MI S OF LP 13 (Lat: 29.336975, Lng: -98.566831), Route carried "under" structure: City street 320, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 5,600 (year 2012), Truck Traffic: 1%, Features Intersected: SOMERSET RD, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 5.238, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.8m (78.1ft)
Find on map >> Show street view
Structure Number: 150150001709239, Location: IH 35 @ IH 10 (Lat: 29.395714, Lng: -98.511153), Route carried "under" structure: Interstate 35, Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 127,900 (year 2012), Truck Traffic: 15%, Features Intersected: IH 10 CONNECTORS
Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.381, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Structure Number: 150150001709239, Location: IH 35 @ IH 10 (Lat: 29.395714, Lng: -98.511153), Route carried "under" structure: Interstate 35, Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 127,900 (year 2012), Truck Traffic: 15%, Features Intersected: IH 10 CONNECTORS
Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.381, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Find on map >> Show street view
Structure Number: 15015000170924, Location: IH 35 @ IH 10 (Lat: 29.396619, Lng: -98.511228), Route carried "under" structure: Interstate 35, Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 68,425 (year 2012), Truck Traffic: 1%, Features Intersected: IH 10 CONNECTORS
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 0.381, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Structure Number: 15015000170924, Location: IH 35 @ IH 10 (Lat: 29.396619, Lng: -98.511228), Route carried "under" structure: Interstate 35, Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 68,425 (year 2012), Truck Traffic: 1%, Features Intersected: IH 10 CONNECTORS
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 0.381, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Find on map >> Show street view
Structure Number: 150150001709308, Location: 1.8 MI NE OF SPUR 422 (Lat: 29.356594, Lng: -98.525817), Route carried "under" structure: Spur State highway 13, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 24,930 (year 2013), Truck Traffic: 9%, Features Intersected: LOOP 13, Facility Carried by Structure: IH 35 SBML
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 3.259, Lanes on structure: 3, Lanes under structure: 9, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 150150001709308, Location: 1.8 MI NE OF SPUR 422 (Lat: 29.356594, Lng: -98.525817), Route carried "under" structure: Spur State highway 13, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 24,930 (year 2013), Truck Traffic: 9%, Features Intersected: LOOP 13, Facility Carried by Structure: IH 35 SBML
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 3.259, Lanes on structure: 3, Lanes under structure: 9, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 150150001709309, Location: 1.8 MI NE OF SPUR 422 (Lat: 29.356594, Lng: -98.525681), Route carried "under" structure: Spur State highway 13, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 29,900 (year 2013), Truck Traffic: 8%, Features Intersected: LOOP 13, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 3.275, Lanes on structure: 3, Lanes under structure: 9, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 150150001709309, Location: 1.8 MI NE OF SPUR 422 (Lat: 29.356594, Lng: -98.525681), Route carried "under" structure: Spur State highway 13, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 29,900 (year 2013), Truck Traffic: 8%, Features Intersected: LOOP 13, Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 3.275, Lanes on structure: 3, Lanes under structure: 9, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 150150001709314, Location: 0.2 MI W OF IH 35 (Lat: 29.396658, Lng: -98.513964), Route carried "under" structure: State highway 353, Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 15,650 (year 2012), Truck Traffic: 3%, Features Intersected: NOGALITOS ST, Facility Carried by Structure: IH 35 SB OFF RAMP
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 30.978, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Structure Number: 150150001709314, Location: 0.2 MI W OF IH 35 (Lat: 29.396658, Lng: -98.513964), Route carried "under" structure: State highway 353, Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 15,650 (year 2012), Truck Traffic: 3%, Features Intersected: NOGALITOS ST, Facility Carried by Structure: IH 35 SB OFF RAMP
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 30.978, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 19.8m (65.0ft)
Find on map >> Show street view
Structure Number: 15015000171008, Location: 1.4 MI N OF US 90 (Lat: 29.414292, Lng: -98.504453), Route carried "under" structure: Interstate 35, Year Built: 1952, Structure Length: 0. m, Average Daily Traffic: 91,390 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 LOWER LEVEL, Facility Carried by Structure: SP 536 (ALAMO ST)
Minimum Vertical Clearance: 5.01m (16.44ft), Kilometerpoint: 34.799, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 15.2m (49.9ft)
Structure Number: 15015000171008, Location: 1.4 MI N OF US 90 (Lat: 29.414292, Lng: -98.504453), Route carried "under" structure: Interstate 35, Year Built: 1952, Structure Length: 0. m, Average Daily Traffic: 91,390 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 LOWER LEVEL, Facility Carried by Structure: SP 536 (ALAMO ST)
Minimum Vertical Clearance: 5.01m (16.44ft), Kilometerpoint: 34.799, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 15.2m (49.9ft)
Find on map >> Show street view
Structure Number: 150150001710082, Location: 0.30 MI S OF SP 536 (Lat: 29.411242, Lng: -98.507903), Route carried "under" structure: City street , Year Built: 1952, Structure Length: 0. m, Average Daily Traffic: 20,220 (year 2012), Truck Traffic: 3%, Features Intersected: S LAREDO ST, Facility Carried by Structure: IH 35
Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 0.161, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.9m (75.1ft)
Structure Number: 150150001710082, Location: 0.30 MI S OF SP 536 (Lat: 29.411242, Lng: -98.507903), Route carried "under" structure: City street , Year Built: 1952, Structure Length: 0. m, Average Daily Traffic: 20,220 (year 2012), Truck Traffic: 3%, Features Intersected: S LAREDO ST, Facility Carried by Structure: IH 35
Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 0.161, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.9m (75.1ft)
Find on map >> Show street view
Structure Number: 150150001710093, Location: 0.7 MI W OF IH 37 (Lat: 29.438297, Lng: -98.489533), Route carried "under" structure: Interstate 35, Year Built: 1954, Structure Length: 0. m, Average Daily Traffic: 190,670 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 ML (LOWER LEVEL), Facility Carried by Structure: BROOKLYN AVE
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 38.092, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 16.2m (53.1ft)
Structure Number: 150150001710093, Location: 0.7 MI W OF IH 37 (Lat: 29.438297, Lng: -98.489533), Route carried "under" structure: Interstate 35, Year Built: 1954, Structure Length: 0. m, Average Daily Traffic: 190,670 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 ML (LOWER LEVEL), Facility Carried by Structure: BROOKLYN AVE
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 38.092, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 16.2m (53.1ft)
Find on map >> Show street view
Structure Number: 150150001710094, Location: 0.8 MI W OF IH 37 (Lat: 29.437719, Lng: -98.490536), Route carried "under" structure: Interstate 35, Year Built: 1954, Structure Length: 0. m, Average Daily Traffic: 190,670 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 ML (LOWER LEVEL), Facility Carried by Structure: MCCULLOUGH AVE
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 37.969, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 16.2m (53.1ft)
Structure Number: 150150001710094, Location: 0.8 MI W OF IH 37 (Lat: 29.437719, Lng: -98.490536), Route carried "under" structure: Interstate 35, Year Built: 1954, Structure Length: 0. m, Average Daily Traffic: 190,670 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 ML (LOWER LEVEL), Facility Carried by Structure: MCCULLOUGH AVE
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 37.969, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 16.2m (53.1ft)
Find on map >> Show street view
Structure Number: 150150001710095, Location: 0.90 MI W OF IH 37 (Lat: 29.436544, Lng: -98.492522), Route carried "under" structure: Interstate 35, Year Built: 1954, Structure Length: 0. m, Average Daily Traffic: 190,670 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 LOWER LEVEL, Facility Carried by Structure: LEXINGTON AVE
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 37.738, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 15.9m (52.2ft)
Structure Number: 150150001710095, Location: 0.90 MI W OF IH 37 (Lat: 29.436544, Lng: -98.492522), Route carried "under" structure: Interstate 35, Year Built: 1954, Structure Length: 0. m, Average Daily Traffic: 190,670 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 LOWER LEVEL, Facility Carried by Structure: LEXINGTON AVE
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 37.738, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 15.9m (52.2ft)
Find on map >> Show street view
Structure Number: 150150001710096, Location: 1.00 MI W OF IH 37 (Lat: 29.435833, Lng: -98.494072), Route carried "under" structure: Interstate 35, Year Built: 1954, Structure Length: 0. m, Average Daily Traffic: 95,330 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 LOWER LEVEL, Facility Carried by Structure: MAIN AVE
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 37.569, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 13.1m (43.0ft)
Structure Number: 150150001710096, Location: 1.00 MI W OF IH 37 (Lat: 29.435833, Lng: -98.494072), Route carried "under" structure: Interstate 35, Year Built: 1954, Structure Length: 0. m, Average Daily Traffic: 95,330 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 LOWER LEVEL, Facility Carried by Structure: MAIN AVE
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 37.569, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 13.1m (43.0ft)
Find on map >> Show street view
Structure Number: 150150001710097, Location: 1.10 MI W OF IH 37 (Lat: 29.435269, Lng: -98.495492), Route carried "under" structure: Interstate 35, Year Built: 1954, Structure Length: 0. m, Average Daily Traffic: 95,330 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 LOWER LEVEL, Facility Carried by Structure: SAN PEDRO AVE
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 37.417, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 13.4m (44.0ft)
Structure Number: 150150001710097, Location: 1.10 MI W OF IH 37 (Lat: 29.435269, Lng: -98.495492), Route carried "under" structure: Interstate 35, Year Built: 1954, Structure Length: 0. m, Average Daily Traffic: 95,330 (year 2013), Truck Traffic: 12%, Features Intersected: IH 35 LOWER LEVEL, Facility Carried by Structure: SAN PEDRO AVE
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 37.417, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 13.4m (44.0ft)
Find on map >> Show street view
Structure Number: 150150001710154, Location: 2.45 MI E OF IH 37/US 281 (Lat: 29.441731, Lng: -98.438033), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 9,990 (year 2010), Truck Traffic: 5%, Features Intersected: AT&T PRKWY, Facility Carried by Structure: IH 35 NB ML
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 0.161, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.7m (58.1ft)
Structure Number: 150150001710154, Location: 2.45 MI E OF IH 37/US 281 (Lat: 29.441731, Lng: -98.438033), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 9,990 (year 2010), Truck Traffic: 5%, Features Intersected: AT&T PRKWY, Facility Carried by Structure: IH 35 NB ML
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 0.161, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.7m (58.1ft)
Find on map >> Show street view
Structure Number: 150150001710155, Location: 2.45 MI E OF IH 37/US 281 (Lat: 29.442147, Lng: -98.437900), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 9,990 (year 2010), Truck Traffic: 5%, Features Intersected: AT&T PRKWY, Facility Carried by Structure: IH 35 SB ML
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.161, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.7m (58.1ft)
Structure Number: 150150001710155, Location: 2.45 MI E OF IH 37/US 281 (Lat: 29.442147, Lng: -98.437900), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 9,990 (year 2010), Truck Traffic: 5%, Features Intersected: AT&T PRKWY, Facility Carried by Structure: IH 35 SB ML
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.161, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 17.7m (58.1ft)
Find on map >> Show street view
Structure Number: 150150001710157, Location: 2.20 MI E OF IH 37/US 281 (Lat: 29.440222, Lng: -98.441556), Route carried "under" structure: Interstate 35, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 69,360 (year 2013), Truck Traffic: 13%, Features Intersected: UPRR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 42.802, Lanes on structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.9m (75.1ft)
Structure Number: 150150001710157, Location: 2.20 MI E OF IH 37/US 281 (Lat: 29.440222, Lng: -98.441556), Route carried "under" structure: Interstate 35, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 69,360 (year 2013), Truck Traffic: 13%, Features Intersected: UPRR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 42.802, Lanes on structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.9m (75.1ft)
Find on map >> Show street view
Structure Number: 150150001710164, Location: 0.5 MI E OF IH 37/US 281 (Lat: 29.438467, Lng: -98.470194), Route carried "under" structure: Interstate 35, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 156,740 (year 2013), Truck Traffic: 13%, Features Intersected: IH 35 MLS CONN 7, Facility Carried by Structure: N PINE ST
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 40.058, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.0m (82.0ft)
Structure Number: 150150001710164, Location: 0.5 MI E OF IH 37/US 281 (Lat: 29.438467, Lng: -98.470194), Route carried "under" structure: Interstate 35, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 156,740 (year 2013), Truck Traffic: 13%, Features Intersected: IH 35 MLS CONN 7, Facility Carried by Structure: N PINE ST
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 40.058, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.0m (82.0ft)
Find on map >> Show street view
Structure Number: 150150001710167, Location: 4.3 MI E OF IH 37/US 281 (Lat: 29.456681, Lng: -98.413164), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 9,250 (year 2011), Truck Traffic: 2%, Features Intersected: BINZ-ENGLEMAN RD, Facility Carried by Structure: IH 35 SB ML
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.161, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Structure Number: 150150001710167, Location: 4.3 MI E OF IH 37/US 281 (Lat: 29.456681, Lng: -98.413164), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 9,250 (year 2011), Truck Traffic: 2%, Features Intersected: BINZ-ENGLEMAN RD, Facility Carried by Structure: IH 35 SB ML
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.161, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Find on map >> Show street view
Structure Number: 150150001710168, Location: 4.3 MI E OF IH 37/US 281 (Lat: 29.456436, Lng: -98.412947), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 48,170 (year 2011), Truck Traffic: 2%, Features Intersected: BINZ-ENGLEMAN RD, Facility Carried by Structure: IH 35 NB ML
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 46.151, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Structure Number: 150150001710168, Location: 4.3 MI E OF IH 37/US 281 (Lat: 29.456436, Lng: -98.412947), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 48,170 (year 2011), Truck Traffic: 2%, Features Intersected: BINZ-ENGLEMAN RD, Facility Carried by Structure: IH 35 NB ML
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 46.151, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Find on map >> Show street view
Structure Number: 150150001710184, Location: 5.46 MI S OF SH 218 (Lat: 29.510606, Lng: -98.397925), Route carried "under" structure: State highway 1976, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 37,180 (year 2013), Truck Traffic: 2%, Features Intersected: WALZEM RD (FM 1976), Facility Carried by Structure: IH 35 SBML & RAMP
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.837, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Structure Number: 150150001710184, Location: 5.46 MI S OF SH 218 (Lat: 29.510606, Lng: -98.397925), Route carried "under" structure: State highway 1976, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 37,180 (year 2013), Truck Traffic: 2%, Features Intersected: WALZEM RD (FM 1976), Facility Carried by Structure: IH 35 SBML & RAMP
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.837, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Find on map >> Show street view
Structure Number: 150150001710185, Location: 5.46 MI S OF SH 218 (Lat: 29.510022, Lng: -98.397617), Route carried "under" structure: State highway 1976, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 37,180 (year 2013), Truck Traffic: 2%, Features Intersected: WALZEM RD (FM 1976), Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.856, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Structure Number: 150150001710185, Location: 5.46 MI S OF SH 218 (Lat: 29.510022, Lng: -98.397617), Route carried "under" structure: State highway 1976, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 37,180 (year 2013), Truck Traffic: 2%, Features Intersected: WALZEM RD (FM 1976), Facility Carried by Structure: IH 35 NBML
Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.856, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Find on map >> Show street view
Structure Number: 150150001710186, Location: 0.96 MI S OF FM 1976 (Lat: 29.496617, Lng: -98.400519), Route carried "under" structure: City street 106, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 36,750 (year 2011), Truck Traffic: 2%, Features Intersected: EISENHAUER RD, Facility Carried by Structure: IH 35 NB ML
Minimum Vertical Clearance: 5.01m (16.44ft), Kilometerpoint: 6.381, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Structure Number: 150150001710186, Location: 0.96 MI S OF FM 1976 (Lat: 29.496617, Lng: -98.400519), Route carried "under" structure: City street 106, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 36,750 (year 2011), Truck Traffic: 2%, Features Intersected: EISENHAUER RD, Facility Carried by Structure: IH 35 NB ML
Minimum Vertical Clearance: 5.01m (16.44ft), Kilometerpoint: 6.381, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Find on map >> Show street view
Structure Number: 150150001710187, Location: 0.96 MI S OF FM 1976 (Lat: 29.496617, Lng: -98.400636), Route carried "under" structure: City street 106, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 36,750 (year 2011), Truck Traffic: 2%, Features Intersected: EISENHAUER RD, Facility Carried by Structure: IH 35 SB ML
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 6.354, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Structure Number: 150150001710187, Location: 0.96 MI S OF FM 1976 (Lat: 29.496617, Lng: -98.400636), Route carried "under" structure: City street 106, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 36,750 (year 2011), Truck Traffic: 2%, Features Intersected: EISENHAUER RD, Facility Carried by Structure: IH 35 SB ML
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 6.354, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Find on map >> Show street view
Structure Number: 150150001710188, Location: 4.3 MI E OF IH 37/US 281 (Lat: 29.484078, Lng: -98.403064), Route carried "under" structure: City street 290, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 37,970 (year 2011), Truck Traffic: 1%, Features Intersected: RITTIMAN RD, Facility Carried by Structure: IH 35 NB ML
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 4.873, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Structure Number: 150150001710188, Location: 4.3 MI E OF IH 37/US 281 (Lat: 29.484078, Lng: -98.403064), Route carried "under" structure: City street 290, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 37,970 (year 2011), Truck Traffic: 1%, Features Intersected: RITTIMAN RD, Facility Carried by Structure: IH 35 NB ML
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 4.873, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Find on map >> Show street view
Structure Number: 150150001710189, Location: 4.3 MI E OF IH 37/US 281 (Lat: 29.484078, Lng: -98.403314), Route carried "under" structure: City street 290, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 37,970 (year 2011), Truck Traffic: 1%, Features Intersected: RITTIMAN RD, Facility Carried by Structure: IH 35 SB ML
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 4.852, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Structure Number: 150150001710189, Location: 4.3 MI E OF IH 37/US 281 (Lat: 29.484078, Lng: -98.403314), Route carried "under" structure: City street 290, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 37,970 (year 2011), Truck Traffic: 1%, Features Intersected: RITTIMAN RD, Facility Carried by Structure: IH 35 SB ML
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 4.852, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)