Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sapulpa, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 102Number of bridges
  • 1,293ft / 394mTotal length
  • $116,609,000Total costs
  • 850,025Total average daily traffic
  • 146,007Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sapulpa
  • No street view available for this location

New bridges in Sapulpa, OK - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 31930-1939
  • 101950-1959
  • 21960-1969
  • 51970-1979
  • 71980-1989
  • 141990-1999
  • 472000-2009
  • 132010-2019
Reconstructed bridges in Sapulpa, OK - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31960-1969
  • 01970-1979
  • 01980-1989
  • 31990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Sapulpa, OK
Average Bridge Truck Traffic in Sapulpa, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.9%Excellent
  • 9.8%Very good
  • 68.6%Good
  • 11.8%Satisfactory
  • 5.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.8%Excellent
  • 54.9%Very good
  • 25.5%Good
  • 7.8%Satisfactory
  • 3.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.8%Excellent
  • 3.9%Very good
  • 76.5%Good
  • 3.9%Satisfactory
  • 3.9%Fair
  • 3.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Excellent
  • 27.0%Very good
  • 39.7%Good
  • 12.7%Satisfactory
  • 12.7%Fair
  • 1.6%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 19.4%Very good
  • 38.7%Good
  • 29.0%Satisfactory
  • 6.5%Fair
  • 6.5%Serious
Find on map >>   Show street view

Structure Number: 3186,  Location: 79.4 NE JCT I-35 (Lat: 36.010278,  Lng: -96.114722),  Route carried "on" structure: Ramp Other road ,  Year Built: 1953,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 15,750 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 25,200 (year 2040),  Design Load: HL 93,  Features Intersected: TURNER TP (I-44) UNDER,  Facility Carried by Structure: SAPULPA INTERCHANG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.789,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31861,  Location: 77.6 NE JCT I-35 (Lat: 35.997222,  Lng: -96.163333),  Route carried "on" structure: County highway 1954C,  Year Built: 2018,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: HL 93,  Features Intersected: TURNER TP (I-44) UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 79.547,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26017,  Location: 00.01 (Lat: 36.024819,  Lng: -96.093289),  Route carried "under" structure: Ramp Other road 44,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: TURNER TP (I-44) UNDER,  Facility Carried by Structure: 96TH ST. S.
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 56.556,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 26017,  Location: 00.01 (Lat: 36.024819,  Lng: -96.093289),  Route carried "under" structure: Ramp Other road 44,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: TURNER TP (I-44) UNDER,  Facility Carried by Structure: 96TH ST. S.
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 56.556,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 26017,  Location: 00.01 (Lat: 36.024819,  Lng: -96.093289),  Route carried "under" structure: Other road 44,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 26,300 (year 2020),  Truck Traffic: 8%,  Features Intersected: TURNER TP (I-44) UNDER,  Facility Carried by Structure: 96TH ST. S.
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 56.556,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 26018,  Location: 83.01 S (Lat: 36.028442,  Lng: -96.092219),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 15,700 (year 2020),  Truck Traffic: 16%,  Features Intersected: CREEK TP & CREEK UNDER,  Facility Carried by Structure: TURNER TP (I-44)
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.1m (148.0ft)

Find on map >>   Show street view

Structure Number: 26019,  Location: 83.01 N (Lat: 36.028611,  Lng: -96.092500),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 8,050 (year 2020),  Truck Traffic: 16%,  Features Intersected: CREEK TP & CREEK UNDER,  Facility Carried by Structure: TURNER TP (I-44)
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: 26022,  Location: 00.13N (Lat: 36.029236,  Lng: -96.088558),  Route carried "under" structure: Business State highway 66,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 16,700 (year 2020),  Truck Traffic: 5%,  Features Intersected: S.H. 66 UNDER,  Facility Carried by Structure: CREEK TP E-S RAMP
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 5.649,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 26023,  Location: 00.13S (Lat: 36.029086,  Lng: -96.089500),  Route carried "under" structure: Business State highway 66,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 16,700 (year 2020),  Truck Traffic: 16%,  Features Intersected: S.H. 66 UNDER,  Facility Carried by Structure: CREEK TP S-E RAMP
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 5.633,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.8m (107.6ft)

Find on map >>   Show street view

Structure Number: 26028,  Location: 00.97 (Lat: 36.024769,  Lng: -96.075367),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 20,300 (year 2020),  Truck Traffic: 25%,  Features Intersected: CREEK TP UNDER,  Facility Carried by Structure: 96TH ST. S.
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 26031,  Location: 01.67 (Lat: 36.018186,  Lng: -96.066383),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 20,300 (year 2020),  Truck Traffic: 10%,  Features Intersected: CREEK TP UNDER,  Facility Carried by Structure: HICKORY HILL RD.
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 2.688,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 26033,  Location: 02.29 (Lat: 36.013764,  Lng: -96.056478),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 20,300 (year 2020),  Truck Traffic: 10%,  Features Intersected: CREEK TP UNDER,  Facility Carried by Structure: HILTON RD.
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 4.328,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 26034,  Location: 02.81 (Lat: 36.012200,  Lng: -96.047364),  Route carried "under" structure: Other road ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 20,300 (year 2020),  Truck Traffic: 10%,  Features Intersected: CREEK TP UNDER,  Facility Carried by Structure: S 49TH ST. W
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 5.164,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 26035,  Location: 03.38 (Lat: 36.009181,  Lng: -96.038286),  Route carried "under" structure: ServiceCity street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 24 (year 2020),  Truck Traffic: 5%,  Features Intersected: EQUIPMENT PASS UNDER,  Facility Carried by Structure: CREEK TP
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 6.082,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 8.5m (27.9ft)

Find on map >>   Show street view

Structure Number: 27635,  Location: 84.4 MI E OF I-35 (Lat: 36.046653,  Lng: -96.078761),  Route carried "under" structure: Other road 44,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 26,300 (year 2020),  Truck Traffic: 5%,  Features Intersected: TURNER TP (I-44) UNDER,  Facility Carried by Structure: E0670 (81ST ST.)
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 59.275,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 27865,  Location: 1.0 MI N OF SH 66 (Lat: 36.011169,  Lng: -96.111758),  Route carried "under" structure: Interstate 44,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 26,300 (year 2020),  Truck Traffic: 12%,  Features Intersected: TURNER TP (I-44) UNDER,  Facility Carried by Structure: S.H. 97
Minimum Vertical Clearance: 7.44m (24.41ft),  Kilometerpoint: 54.095,  Lanes on structure: 4,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 65.5m (214.9ft)

Find on map >>   Show street view

Structure Number: 28573,  Location: 81.4MI.NE JCT. I-35 (Lat: 36.014917,  Lng: -96.100828),  Route carried "under" structure: State highway 166,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2020),  Truck Traffic: 15%,  Features Intersected: S.H. 166 / R.R. UNDER,  Facility Carried by Structure: TURNER TP (I-44)
Minimum Vertical Clearance: 6.48m (21.26ft),  Kilometerpoint: 1.110,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 31789,  Location: 24.3 E PAYNE C/L (Lat: 35.987222,  Lng: -96.194167),  Route carried "under" structure: State highway 33,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 16%,  Features Intersected: S.H. 33 UNDER,  Facility Carried by Structure: TURNER TP (I-44)
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 46.146,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 31858,  Location: 78.8 NE JCT I-35 (Lat: 36.002303,  Lng: -96.143636),  Route carried "under" structure: Other road 44,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 25%,  Features Intersected: TURNER TP,  Facility Carried by Structure: CO RD N3845
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 82.136,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: Toll bridge,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 31859,  Location: 79.2 NE JCT I-35 (Lat: 36.004758,  Lng: -96.136328),  Route carried "under" structure: Other road 44,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 36%,  Features Intersected: TURNER TP (I-44) UNDER,  Facility Carried by Structure: S. 145TH W. AVE
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 83.329,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 3186,  Location: 79.4 NE JCT I-35 (Lat: 36.010278,  Lng: -96.114722),  Route carried "under" structure: Other road 44,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 12%,  Features Intersected: TURNER TP (I-44) UNDER,  Facility Carried by Structure: SAPULPA INTERCHANG
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 86.565,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>   Show street view

Structure Number: 31861,  Location: 77.6 NE JCT I-35 (Lat: 35.997222,  Lng: -96.163333),  Route carried "under" structure: Other road 44,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 36%,  Features Intersected: TURNER TP (I-44) UNDER,  Facility Carried by Structure: CO. RD. 1954C
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 79.133,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Discuss Sapulpa, Oklahoma (OK) on our hugely popular Oklahoma forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.