Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Schodack, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 90Number of bridges
  • 1,194ft / 364mTotal length
  • $448,144,000Total costs
  • 594,682Total average daily traffic
  • 65,779Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Schodack
  • No street view available for this location

New bridges in Schodack, NY - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 11900-1909
  • 31920-1929
  • 31930-1939
  • 11940-1949
  • 231950-1959
  • 371970-1979
  • 21980-1989
  • 51990-1999
  • 92000-2009
  • 42010-2019
Reconstructed bridges in Schodack, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 31990-1999
  • 42000-2009
  • 22010-2019
Average Bridge Daily Traffic in Schodack, NY
Average Bridge Truck Traffic in Schodack, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.8%Excellent
  • 26.4%Very good
  • 17.0%Good
  • 24.5%Satisfactory
  • 24.5%Fair
  • 3.8%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.1%Excellent
  • 9.4%Very good
  • 32.1%Good
  • 30.2%Satisfactory
  • 9.4%Fair
  • 1.9%Poor
  • 1.9%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.3%Excellent
  • 13.2%Very good
  • 18.9%Good
  • 32.1%Satisfactory
  • 22.6%Fair
  • 1.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.0%Excellent
  • 8.0%Very good
  • 20.0%Good
  • 32.0%Satisfactory
  • 32.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 100549,  Location: 0.1 MI N JCT RTS 150 & 9 (Lat: 42.555003,  Lng: -73.676733),  Route carried "on" structure: US 9,  Year Built: 2016,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 17,442 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,523 (year 2040),  Design Load: HL 93,  Features Intersected: MOORDENER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.590,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,469,000,  Roadway Improvement Cost: $860,000,  Total Project Cost: $2,329,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10055,  Location: 0.2 MI N JCT RTS 150 & 9 (Lat: 42.555439,  Lng: -73.677131),  Route carried "on" structure: US 9,  Year Built: 2016,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 17,442 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,523 (year 2040),  Design Load: HL 93,  Features Intersected: N BR MOORDENER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.751,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,138,000,  Roadway Improvement Cost: $666,000,  Total Project Cost: $1,804,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10066,  Location: JCT RT 9J & MUITZES KILL (Lat: 42.517542,  Lng: -73.760319),  Route carried "on" structure: State highway 9J,  Year Built: 1973,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 1,152 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,201 (year 2040),  Features Intersected: MUITZES KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.937,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $424,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 100661,  Location: JCT RT 9J & VLOCKIE KILL (Lat: 42.525750,  Lng: -73.757697),  Route carried "on" structure: State highway 9J,  Year Built: 1930,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,152 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,201 (year 2040),  Features Intersected: VLOCKIE KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.822,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $536,000,  Roadway Improvement Cost: $314,000,  Total Project Cost: $850,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100662,  Location: 0.9 MI N JCT RTS 150 & 9J (Lat: 42.543453,  Lng: -73.749097),  Route carried "on" structure: State highway 9J,  Year Built: 1970,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 2,859 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,537 (year 2040),  Design Load: HS 20,  Features Intersected: MOORDENER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.043,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,393,000,  Roadway Improvement Cost: $816,000,  Total Project Cost: $2,209,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 101599,  Location: 0.4 MI W JCT RTS 20 & 203 (Lat: 42.517175,  Lng: -73.615633),  Route carried "on" structure: US 20,  Year Built: 2000,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 7,276 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,152 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: VALATIEKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.906,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Excellent,  Channel: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,162,000,  Roadway Improvement Cost: $680,000,  Total Project Cost: $1,842,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103853,  Location: 3.8 MI W JCT RT I90 & 150 (Lat: 42.534406,  Lng: -73.734347),  Route carried "on" structure: State highway 150,  Year Built: 2000,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 2,130 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,635 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MOORDENER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.011,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $985,000,  Roadway Improvement Cost: $577,000,  Total Project Cost: $1,561,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103854,  Location: 2.9 MI W JCT I90 & SH 150 (Lat: 42.541169,  Lng: -73.719922),  Route carried "on" structure: State highway 150,  Year Built: 1899,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 2,130 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,635 (year 2040),  Design Load: HS 20,  Features Intersected: BROOKVIEW STA RD, AMTRAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.508,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,325,000,  Roadway Improvement Cost: $776,000,  Total Project Cost: $2,101,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 103855,  Location: 0.1 MI E JCT RT I90 & 150 (Lat: 42.551161,  Lng: -73.683203),  Route carried "on" structure: State highway 150,  Year Built: 1973,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 642 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 794 (year 2040),  Features Intersected: MOORDENER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.241,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,341,000,  Roadway Improvement Cost: $785,000,  Total Project Cost: $2,126,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103856,  Location: 1 MILE E JCT I90 & SH 150 (Lat: 42.557669,  Lng: -73.658050),  Route carried "on" structure: State highway 150,  Year Built: 2005,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 3,392 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,120 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MOORDENER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.509,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $551,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $874,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 109268,  Location: 1.8 MI N JCT I90 & US 9 (Lat: 42.584908,  Lng: -73.677322),  Route carried "on" structure: Interstate 90,  Year Built: 1971,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 33,203 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 52,616 (year 2040),  Design Load: H 20,  Features Intersected: N B MOORDENER KLL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.121,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.9m (130.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,606,000,  Roadway Improvement Cost: $940,000,  Total Project Cost: $2,546,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1092691,  Location: 1.4 MI N JCT RTS I90 & 9 (Lat: 42.579700,  Lng: -73.678900),  Route carried "on" structure: Interstate 90,  Year Built: 1972,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 27,810 (year 2006),  Truck Traffic: 9%,  Design Load: HS 20,  Features Intersected: RTE 912F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.078,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 79.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,980,000,  Roadway Improvement Cost: $1,159,000,  Total Project Cost: $3,139,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092692,  Location: 1.4 MI N JCT RTS I90 & 9 (Lat: 42.579642,  Lng: -73.679253),  Route carried "on" structure: Interstate 90,  Year Built: 1972,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 16,602 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 26,308 (year 2040),  Design Load: HS 20,  Features Intersected: Schodack Pedestrian Path
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.716,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 85.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 65.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,918,000,  Roadway Improvement Cost: $1,123,000,  Total Project Cost: $3,041,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10927,  Location: AT SCHODACK CENTER (Lat: 42.578650,  Lng: -73.685506),  Route carried "on" structure: State highway 912F,  Year Built: 1972,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 5,819 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,068 (year 2040),  Design Load: HS 20,  Features Intersected: N B MOORDENERKILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft),  Curb or Sidewalk Widths: Left: 5.2m (17.1ft),  Right: 0.0m

Condition: Channel: Fair,  Culverts: Good,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $508,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $805,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1092719,  Location: .9 MI N JCT I90 & US9 (Lat: 42.571228,  Lng: -73.679072),  Route carried "on" structure: Interstate 90,  Year Built: 1972,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 29,503 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 46,753 (year 2040),  Design Load: H 20,  Features Intersected: N BRANCH MOORDENER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.665,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.2m (108.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,211,000,  Roadway Improvement Cost: $709,000,  Total Project Cost: $1,920,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1092721,  Location: 0.7 MI N JCT RTS I90 & 9 (Lat: 42.568772,  Lng: -73.678650),  Route carried "on" structure: Interstate 90,  Year Built: 1972,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 16,406 (year 2005),  Truck Traffic: 9%,  Design Load: HS 20,  Features Intersected: KRAFT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.923,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,697,000,  Roadway Improvement Cost: $993,000,  Total Project Cost: $2,690,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1092722,  Location: 0.7 MI N JCT RTS I90 & 9 (Lat: 42.568692,  Lng: -73.679008),  Route carried "on" structure: Interstate 90,  Year Built: 1972,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 14,752 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 23,376 (year 2040),  Design Load: HS 20,  Features Intersected: KRAFT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.939,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,718,000,  Roadway Improvement Cost: $1,006,000,  Total Project Cost: $2,723,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 109273,  Location: JCT RTS 9 & I90 (Lat: 42.558819,  Lng: -73.679397),  Route carried "on" structure: US 9,  Year Built: 1973,  Status: Open,  Structure Length: 9.39m (30.81ft),  Average Daily Traffic: 17,442 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,523 (year 2040),  Design Load: HS 20,  Features Intersected: 90I 90I 1402 2074 WB, RT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.185,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 30.2m (99.1ft),  Out-to-Out Width: 31.1m (102.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.38m (30.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $8,026,000,  Roadway Improvement Cost: $4,700,000,  Total Project Cost: $12,726,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092751,  Location: JCT OF RTS I90 & 150 (Lat: 42.550658,  Lng: -73.684294),  Route carried "on" structure: Interstate 90,  Year Built: 1972,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 10,583 (year 2007),  Truck Traffic: 9%,  Design Load: HS 20,  Features Intersected: RTE 150
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.457,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,674,000,  Roadway Improvement Cost: $980,000,  Total Project Cost: $2,655,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092752,  Location: JCT OF RTS I90 & 150 (Lat: 42.550464,  Lng: -73.684792),  Route carried "on" structure: Interstate 90,  Year Built: 1972,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 8,625 (year 2007),  Truck Traffic: 18%,  Average Future Daily Traffic: 13,668 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 150
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.079,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 56.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,209,000,  Roadway Improvement Cost: $1,293,000,  Total Project Cost: $3,502,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092761,  Location: .1 MI S JCT I90 & SH 150 (Lat: 42.549022,  Lng: -73.684639),  Route carried "on" structure: Interstate 90,  Year Built: 2014,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 10,583 (year 2007),  Truck Traffic: 9%,  Design Load: HL 93,  Features Intersected: MOORDENER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.207,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 55.2m (181.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,652,000,  Roadway Improvement Cost: $967,000,  Total Project Cost: $2,619,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1092762,  Location: .1 MI S JCT I90 & SH 150 (Lat: 42.549106,  Lng: -73.685061),  Route carried "on" structure: Interstate 90,  Year Built: 2013,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 8,625 (year 2007),  Truck Traffic: 18%,  Average Future Daily Traffic: 13,668 (year 2040),  Design Load: HL 93,  Features Intersected: MOORDENER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.240,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 55.2m (181.1ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Channel: Excellent,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,971,000,  Roadway Improvement Cost: $1,154,000,  Total Project Cost: $3,125,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 109277,  Location: 1.7 MI S JCT RT I90 & 150 (Lat: 42.525747,  Lng: -73.687789),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 1,658 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,411 (year 2040),  Design Load: HS 20,  Features Intersected: 90I 90I 14022098 WB, RT,  Facility Carried by Structure: MAPLE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.570,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.09m (19.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,365,000,  Roadway Improvement Cost: $1,385,000,  Total Project Cost: $3,751,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 109278,  Location: .3 MI S JCT CR 6 & I90 (Lat: 42.523969,  Lng: -73.688206),  Route carried "on" structure: Interstate 90,  Year Built: 1974,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 17,250 (year 2007),  Truck Traffic: 18%,  Average Future Daily Traffic: 27,336 (year 2040),  Design Load: HS 20,  Features Intersected: VLOCKIE KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.055,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 84.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,785,000,  Roadway Improvement Cost: $1,045,000,  Total Project Cost: $2,830,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1092791,  Location: 2.1 MI S JCT RT I90 & 150 (Lat: 42.519708,  Lng: -73.688436),  Route carried "on" structure: Interstate 90,  Year Built: 1974,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 10,583 (year 2007),  Truck Traffic: 9%,  Design Load: HS 20,  Features Intersected: VAN HOESEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.506,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,138,000,  Roadway Improvement Cost: $666,000,  Total Project Cost: $1,804,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092792,  Location: 2.1 MI S JCT RT I90 & 150 (Lat: 42.519694,  Lng: -73.688872),  Route carried "on" structure: Interstate 90,  Year Built: 1974,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 8,625 (year 2007),  Truck Traffic: 18%,  Average Future Daily Traffic: 13,668 (year 2040),  Design Load: HS 20,  Features Intersected: VAN HOESEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.522,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,140,000,  Roadway Improvement Cost: $668,000,  Total Project Cost: $1,808,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092801,  Location: 2.6 MI S JCT RT I90 & 150 (Lat: 42.512392,  Lng: -73.688822),  Route carried "on" structure: Interstate 90,  Year Built: 1974,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 10,583 (year 2007),  Truck Traffic: 9%,  Design Load: HS 20,  Features Intersected: SAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.294,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 61.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,279,000,  Roadway Improvement Cost: $749,000,  Total Project Cost: $2,027,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092802,  Location: 2.6 MI S JCT RT I90 & 150 (Lat: 42.512567,  Lng: -73.689353),  Route carried "on" structure: Interstate 90,  Year Built: 1974,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 8,625 (year 2007),  Truck Traffic: 18%,  Average Future Daily Traffic: 13,668 (year 2040),  Design Load: HS 20,  Features Intersected: SAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.310,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,283,000,  Roadway Improvement Cost: $751,000,  Total Project Cost: $2,034,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092811,  Location: 0.8 MI N JCT RTS I90 & 9 (Lat: 42.499139,  Lng: -73.685106),  Route carried "on" structure: Interstate 90,  Year Built: 1974,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 10,583 (year 2007),  Truck Traffic: 9%,  Design Load: HS 20,  Features Intersected: BAME ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.855,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,126,000,  Roadway Improvement Cost: $659,000,  Total Project Cost: $1,785,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092812,  Location: 0.8 MI N JCT RTS I90 & 9 (Lat: 42.498933,  Lng: -73.685586),  Route carried "on" structure: Interstate 90,  Year Built: 1974,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 8,625 (year 2007),  Truck Traffic: 18%,  Average Future Daily Traffic: 10,272 (year 2040),  Design Load: HS 20,  Features Intersected: BAME ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.871,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,142,000,  Roadway Improvement Cost: $669,000,  Total Project Cost: $1,810,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092829,  Location: JCT RTS I90 & 9 (Lat: 42.489403,  Lng: -73.677978),  Route carried "on" structure: Interstate 90,  Year Built: 1974,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 17,250 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 20,544 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.142,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.3m (92.8ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.1m (144.7ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,979,000,  Roadway Improvement Cost: $2,330,000,  Total Project Cost: $6,309,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 220201,  Location: 1.3MI.NE.CASTLETON (Lat: 42.540808,  Lng: -73.718811),  Route carried "on" structure: Other road ,  Year Built: 1940,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 303 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 424 (year 2037),  Features Intersected: MOORDENER KILL,  Facility Carried by Structure: BROOKVIEW STA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.767,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: November 2014,  Bridge Improvement Cost: $257,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $408,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220202,  Location: 3 MILES NW OF NASSAU (Lat: 42.563247,  Lng: -73.627681),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Posted for load,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 432 (year 2017),  Truck Traffic: 14%,  Average Future Daily Traffic: 605 (year 2037),  Design Load: HS 20,  Features Intersected: MOORDENER KILL,  Facility Carried by Structure: BURDEN LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $561,000,  Roadway Improvement Cost: $328,000,  Total Project Cost: $889,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220207,  Location: 2.9 MI NW CASTLETON (Lat: 42.549683,  Lng: -73.689453),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 803 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,124 (year 2037),  Features Intersected: MOORDENER KILL,  Facility Carried by Structure: OLD POST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $548,000,  Roadway Improvement Cost: $321,000,  Total Project Cost: $869,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226717,  Location: 0.5 MI N MAPLE HILL ROAD (Lat: 42.531728,  Lng: -73.713722),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 589 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 825 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: AMTRAK,  Facility Carried by Structure: SIMONS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $798,000,  Roadway Improvement Cost: $467,000,  Total Project Cost: $1,265,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 226736,  Location: 1.5 MI N SCHODACK LANDING (Lat: 42.496600,  Lng: -73.758139),  Route carried "on" structure: Other road ,  Year Built: 1924,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 98 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 137 (year 2038),  Features Intersected: CSX TRANS/C P RWY,  Facility Carried by Structure: KNICKERBOCKER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.9m (81.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.16m (23.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,381,000,  Roadway Improvement Cost: $809,000,  Total Project Cost: $2,189,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330392,  Location: 0.2M S CR7&RT150 E SCHODK (Lat: 42.559408,  Lng: -73.631806),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 2,053 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,986 (year 2040),  Design Load: HS 20,  Features Intersected: MOORDENER KILL,  Facility Carried by Structure: CR7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.438,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $630,000,  Roadway Improvement Cost: $369,000,  Total Project Cost: $999,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330398,  Location: 4MI.S. CASTLETOWN (Lat: 42.477761,  Lng: -73.720492),  Route carried "on" structure: County highway ,  Year Built: 1930,  Year Reconstructed: 1992,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 464 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 650 (year 2039),  Features Intersected: MUITZES KILL,  Facility Carried by Structure: SCHODACK LANDING R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.151,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 16.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $343,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Schodack, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.