Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Seymour, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 93Number of bridges
  • 1,152ft / 351mTotal length
  • $1,000,000Total costs
  • 655,676Total average daily traffic
  • 117,993Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Seymour
  • No street view available for this location

New bridges in Seymour, IN - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 41940-1949
  • 181950-1959
  • 141960-1969
  • 51970-1979
  • 261980-1989
  • 91990-1999
  • 62000-2009
  • 62010-2019
  • 22020-2022
Reconstructed bridges in Seymour, IN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 61980-1989
  • 51990-1999
  • 82000-2009
  • 32010-2019
  • 52020-2022
Average Bridge Daily Traffic in Seymour, IN
Average Bridge Truck Traffic in Seymour, IN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.5%Excellent
  • 9.0%Very good
  • 47.8%Good
  • 38.8%Satisfactory
  • 3.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.5%Excellent
  • 11.9%Very good
  • 47.8%Good
  • 26.9%Satisfactory
  • 11.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.9%Very good
  • 49.3%Good
  • 20.9%Satisfactory
  • 9.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.3%Very good
  • 40.0%Good
  • 38.5%Satisfactory
  • 6.2%Fair
  • 3.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 11.1%Very good
  • 22.2%Good
  • 44.4%Satisfactory
  • 22.2%Fair
Find on map >>   Show street view

Structure Number: 3522,  Location: 04.18 N US 31 (Lat: 38.958189,  Lng: -85.843642),  Route carried "under" structure: US 50,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 14,303 (year 2004),  Truck Traffic: 5%,  Features Intersected: US 50 EB,  Facility Carried by Structure: I-65 SB
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 41.907,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.7m (64.6ft)

Find on map >>   Show street view

Structure Number: 3525,  Location: 01.76 N US 50 (Lat: 38.983811,  Lng: -85.843536),  Route carried "under" structure: Interstate 65,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 16,108 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-65 NB,  Facility Carried by Structure: ENOS ROAD
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 82.575,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.9m (65.3ft)

Find on map >>   Show street view

Structure Number: 3525,  Location: 01.76 N US 50 (Lat: 38.983811,  Lng: -85.843536),  Route carried "under" structure: Interstate 65,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 16,108 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-65 SB,  Facility Carried by Structure: ENOS ROAD
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 82.575,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.9m (65.3ft)

Find on map >>   Show street view

Structure Number: 3528,  Location: 02.79 S SR 11 (Lat: 38.998300,  Lng: -85.853303),  Route carried "under" structure: Interstate 65,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 16,108 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-65 SB,  Facility Carried by Structure: CR 800 N
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 84.539,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 3528,  Location: 02.79 S SR 11 (Lat: 38.998300,  Lng: -85.853303),  Route carried "under" structure: Interstate 65,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 16,108 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-65 NB,  Facility Carried by Structure: CR 800 N
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 84.539,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 3529,  Location: 02.20 S SR 11 (Lat: 39.003831,  Lng: -85.862075),  Route carried "under" structure: Interstate 65,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 16,108 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-65 NB,  Facility Carried by Structure: REDDING ROAD
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 85.488,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 3529,  Location: 02.20 S SR 11 (Lat: 39.003831,  Lng: -85.862075),  Route carried "under" structure: Interstate 65,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 16,108 (year 2004),  Truck Traffic: 10%,  Features Intersected: I-65 SB,  Facility Carried by Structure: REDDING ROAD
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 85.488,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 79024,  Location: 08.54 N SR 46 (Lat: 38.983811,  Lng: -85.843531),  Route carried "under" structure: Interstate 69,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 22,827 (year 2016),  Truck Traffic: 22%,  Features Intersected: I-69 SB,  Facility Carried by Structure: CHAMBERS PIKE
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 206.962,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 79024,  Location: 08.54 N SR 46 (Lat: 38.983811,  Lng: -85.843531),  Route carried "under" structure: Interstate 69,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 24,621 (year 2016),  Truck Traffic: 20%,  Features Intersected: I-69 NB,  Facility Carried by Structure: CHAMBERS PIKE
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 206.962,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 79024,  Location: 08.54 N SR 46 (Lat: 38.983811,  Lng: -85.843531),  Route carried "under" structure: County highway ,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 168 (year 2016),  Truck Traffic: 2%,  Features Intersected: BURMA ROAD,  Facility Carried by Structure: CHAMBERS PIKE
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Discuss Seymour, Indiana (IN) on our hugely popular Indiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.