Bridge Statistics for Valley Falls, South Carolina (SC)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- New bridges - historical statistics
- 11920-1929
- 11930-1939
- 51950-1959
- 21960-1969
- 31970-1979
- 11980-1989
- 261990-1999
- 112000-2009
- 12010-2019
- Bridge Condition - Deck
- 42.9%Very good
- 28.6%Good
- 14.3%Satisfactory
- 14.3%Fair
- Bridge Condition - Superstructure
- 64.3%Very good
- 17.9%Good
- 10.7%Fair
- 7.1%Poor
- Bridge Condition - Substructure
- 53.6%Very good
- 21.4%Good
- 10.7%Satisfactory
- 7.1%Fair
- 3.6%Poor
- 3.6%Serious
- Bridge Condition - Channel
- 18.8%Very good
- 31.3%Good
- 31.3%Satisfactory
- 12.5%Fair
- 6.3%Poor
- Bridge Condition - Culverts
- 33.3%Very good
- 16.7%Good
- 33.3%Satisfactory
- 16.7%Fair
Find on map >> Show street view
Structure Number: 8927, Location: 5.0 MI E SPARTANBURG (Lat: 35.008333, Lng: -81.914500), Route carried "under" structure: Interstate 85, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 55,300 (year 2020), Truck Traffic: 9%, Features Intersected: I-85
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 123.598, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 8927, Location: 5.0 MI E SPARTANBURG (Lat: 35.008333, Lng: -81.914500), Route carried "under" structure: Interstate 85, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 55,300 (year 2020), Truck Traffic: 9%, Features Intersected: I-85
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 123.598, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 9364, Location: 4.0 MI N OF SPARTANBURG (Lat: 35.011631, Lng: -81.928086), Route carried "under" structure: Interstate 85, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 55,300 (year 2020), Truck Traffic: 9%, Features Intersected: I-85, Facility Carried by Structure: S-42-191
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 123.421, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 9364, Location: 4.0 MI N OF SPARTANBURG (Lat: 35.011631, Lng: -81.928086), Route carried "under" structure: Interstate 85, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 55,300 (year 2020), Truck Traffic: 9%, Features Intersected: I-85, Facility Carried by Structure: S-42-191
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 123.421, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 9366, Location: 5.0 MI NW OF SPARTANBURG (Lat: 35.000092, Lng: -81.989572), Route carried "under" structure: Interstate 85, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 61,600 (year 2020), Truck Traffic: 9%, Features Intersected: I-85, Facility Carried by Structure: S-42-366
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 116.967, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.2m (122.0ft)
Structure Number: 9366, Location: 5.0 MI NW OF SPARTANBURG (Lat: 35.000092, Lng: -81.989572), Route carried "under" structure: Interstate 85, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 61,600 (year 2020), Truck Traffic: 9%, Features Intersected: I-85, Facility Carried by Structure: S-42-366
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 116.967, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.2m (122.0ft)
Find on map >> Show street view
Structure Number: 9951, Location: 3.7 N OF SPARTANBURG (Lat: 34.993000, Lng: -81.970611), Route carried "under" structure: State highway 1089, Year Built: 2006, Structure Length: 0. m, Average Daily Traffic: 62 (year 2021), Features Intersected: EAST CAMPUS BLVD, Facility Carried by Structure: US 176 EB
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.272, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 9951, Location: 3.7 N OF SPARTANBURG (Lat: 34.993000, Lng: -81.970611), Route carried "under" structure: State highway 1089, Year Built: 2006, Structure Length: 0. m, Average Daily Traffic: 62 (year 2021), Features Intersected: EAST CAMPUS BLVD, Facility Carried by Structure: US 176 EB
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.272, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 9952, Location: 3.7 MI N OF SPARTANBURG (Lat: 34.993033, Lng: -81.970447), Route carried "under" structure: State highway 1089, Year Built: 2006, Structure Length: 0. m, Average Daily Traffic: 62 (year 2021), Features Intersected: EAST CAMPUS BLVD, Facility Carried by Structure: US 176 WB
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.286, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 9952, Location: 3.7 MI N OF SPARTANBURG (Lat: 34.993033, Lng: -81.970447), Route carried "under" structure: State highway 1089, Year Built: 2006, Structure Length: 0. m, Average Daily Traffic: 62 (year 2021), Features Intersected: EAST CAMPUS BLVD, Facility Carried by Structure: US 176 WB
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.286, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 9954, Location: 3.6 MI N OR SPARTANBURG (Lat: 34.993069, Lng: -81.970200), Route carried "under" structure: State highway 1089, Year Built: 2006, Structure Length: 0. m, Average Daily Traffic: 125 (year 2021), Truck Traffic: 5%, Features Intersected: EAST CAMPUS BLVD(S-1089), Facility Carried by Structure: US 176 BRIDGE RAMP
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.304, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.4m (126.0ft)
Structure Number: 9954, Location: 3.6 MI N OR SPARTANBURG (Lat: 34.993069, Lng: -81.970200), Route carried "under" structure: State highway 1089, Year Built: 2006, Structure Length: 0. m, Average Daily Traffic: 125 (year 2021), Truck Traffic: 5%, Features Intersected: EAST CAMPUS BLVD(S-1089), Facility Carried by Structure: US 176 BRIDGE RAMP
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.304, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.4m (126.0ft)
Find on map >> Show street view
Structure Number: 10201, Location: 4.0 MI N OF SPARTANBURG (Lat: 34.989444, Lng: -81.965139), Route carried "under" structure: State highway 85, Year Built: 2005, Structure Length: 0. m, Average Daily Traffic: 15,600 (year 2020), Truck Traffic: 11%, Features Intersected: SC 85
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 7.306, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.3m (92.8ft)
Structure Number: 10201, Location: 4.0 MI N OF SPARTANBURG (Lat: 34.989444, Lng: -81.965139), Route carried "under" structure: State highway 85, Year Built: 2005, Structure Length: 0. m, Average Daily Traffic: 15,600 (year 2020), Truck Traffic: 11%, Features Intersected: SC 85
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 7.306, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.3m (92.8ft)