Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Valparaiso, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 57Number of bridges
  • 427ft / 130mTotal length
  • $2,894,000Total costs
  • 392,235Total average daily traffic
  • 42,849Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Valparaiso
  • No street view available for this location

New bridges in Valparaiso, IN - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 101930-1939
  • 11940-1949
  • 11960-1969
  • 41970-1979
  • 301980-1989
  • 31990-1999
  • 12000-2009
  • 52010-2019
Reconstructed bridges in Valparaiso, IN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 41970-1979
  • 21980-1989
  • 51990-1999
  • 92000-2009
  • 22010-2019
  • 12020-2022
Average Bridge Daily Traffic in Valparaiso, IN
Average Bridge Truck Traffic in Valparaiso, IN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.5%Very good
  • 38.7%Good
  • 22.6%Satisfactory
  • 19.4%Fair
  • 9.7%Poor
  • 3.2%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.2%Excellent
  • 9.7%Very good
  • 41.9%Good
  • 22.6%Satisfactory
  • 22.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.9%Very good
  • 32.3%Good
  • 38.7%Satisfactory
  • 12.9%Fair
  • 3.2%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.0%Excellent
  • 30.0%Good
  • 45.0%Satisfactory
  • 15.0%Fair
  • 5.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 16.7%Satisfactory
  • 16.7%Fair
  • 16.7%Serious
Find on map >>   Show street view

Structure Number: 17979,  Location: 00.21 S US-30 (Lat: 41.450869,  Lng: -87.027092),  Route carried "under" structure: County highway ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 208 (year 2004),  Truck Traffic: 5%,  Features Intersected: COMFORD ROAD,  Facility Carried by Structure: SR 49 SB
Minimum Vertical Clearance: 7.37m (24.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 1798,  Location: 01.13 S SR-2 (Lat: 41.453731,  Lng: -87.026672),  Route carried "under" structure: US 30,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 8,635 (year 2010),  Truck Traffic: 10%,  Features Intersected: US 30/SR 2 EBL,  Facility Carried by Structure: SR 49 NB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 16.689,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 1798,  Location: 01.13 S SR-2 (Lat: 41.453731,  Lng: -87.026672),  Route carried "under" structure: US 30,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 8,635 (year 2010),  Truck Traffic: 10%,  Features Intersected: US 30 WBL,  Facility Carried by Structure: SR 49 NB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 16.689,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 17981,  Location: 01.13 S SR-2 (Lat: 41.453961,  Lng: -87.027017),  Route carried "under" structure: US 30,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 8,635 (year 2010),  Truck Traffic: 10%,  Features Intersected: US 30/SR 2 EBL,  Facility Carried by Structure: SR 49 SB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 16.657,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 17981,  Location: 01.13 S SR-2 (Lat: 41.453961,  Lng: -87.027017),  Route carried "under" structure: US 30,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 8,635 (year 2010),  Truck Traffic: 10%,  Features Intersected: US 30 WBL,  Facility Carried by Structure: SR 49 SB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 16.657,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 17982,  Location: 01.13 N US-30 (Lat: 41.469550,  Lng: -87.021575),  Route carried "under" structure: State highway 2,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 11,082 (year 2004),  Truck Traffic: 10%,  Features Intersected: SR-2 EBL,  Facility Carried by Structure: SR 49 NB
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 32.010,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 17982,  Location: 01.13 N US-30 (Lat: 41.469550,  Lng: -87.021575),  Route carried "under" structure: State highway 2,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 11,082 (year 2004),  Truck Traffic: 10%,  Features Intersected: SR-2 WBL,  Facility Carried by Structure: SR 49 NB
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 32.010,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 17983,  Location: 01.13 N US-30 (Lat: 41.469550,  Lng: -87.021889),  Route carried "under" structure: State highway 2,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 8,928 (year 2020),  Truck Traffic: 10%,  Features Intersected: SR-2 WBL,  Facility Carried by Structure: SR 49 SB
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 31.994,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 17983,  Location: 01.13 N US-30 (Lat: 41.469550,  Lng: -87.021889),  Route carried "under" structure: State highway 2,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 9,075 (year 2020),  Truck Traffic: 10%,  Features Intersected: SR-2 EBL,  Facility Carried by Structure: SR 49 SB
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 31.994,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 17988,  Location: 00.56 N SR-2 (Lat: 41.478161,  Lng: -87.020225),  Route carried "under" structure: County highway ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 3,513 (year 2004),  Truck Traffic: 5%,  Features Intersected: CO RD 300 N (EVANS RD),  Facility Carried by Structure: SR 49 NB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 17989,  Location: 00.56 N SR-2 (Lat: 41.478150,  Lng: -87.020547),  Route carried "under" structure: County highway ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 3,513 (year 2004),  Truck Traffic: 5%,  Features Intersected: CO RD 300 N (EVANS RD),  Facility Carried by Structure: SR 49 SB
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 17992,  Location: 01.02 S US 6 (Lat: 41.538019,  Lng: -87.036942),  Route carried "under" structure: State highway 49,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 15,012 (year 2020),  Truck Traffic: 15%,  Features Intersected: SR 49 SB,  Facility Carried by Structure: CALUMET AVE
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 32.010,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.1m (98.8ft)

Find on map >>   Show street view

Structure Number: 17992,  Location: 01.02 S US 6 (Lat: 41.538019,  Lng: -87.036942),  Route carried "under" structure: State highway 49,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 14,155 (year 2020),  Truck Traffic: 15%,  Features Intersected: SR 49 NB,  Facility Carried by Structure: CALUMET AVE
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 32.010,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.1m (98.8ft)

Find on map >>   Show street view

Structure Number: 79664,  Location: 01.57 N SR-2 (Lat: 41.492761,  Lng: -87.021431),  Route carried "under" structure: State highway 49,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 13,870 (year 2011),  Truck Traffic: 34%,  Features Intersected: SR-49 SBL,  Facility Carried by Structure: CR 400N/VALE RD
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 26.747,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 79664,  Location: 01.57 N SR-2 (Lat: 41.492761,  Lng: -87.021431),  Route carried "under" structure: State highway 49,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 13,870 (year 2011),  Truck Traffic: 34%,  Features Intersected: SR-49 NBL,  Facility Carried by Structure: CR 400N/VALE RD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 26.747,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 27.4m (89.9ft)

Discuss Valparaiso, Indiana (IN) on our hugely popular Indiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.