Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Westborough, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 125ft / 38.3mTotal length
  • $31,489,000Total costs
  • 483,424Total average daily traffic
  • 31,289Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Westborough
  • No street view available for this location

New bridges in Westborough, MA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21930-1939
  • 121950-1959
  • 21970-1979
  • 11980-1989
  • 12000-2009
Reconstructed bridges in Westborough, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 61980-1989
  • 11990-1999
Average Bridge Daily Traffic in Westborough, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Good
  • 66.7%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Good
  • 16.7%Satisfactory
  • 66.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Good
  • 41.7%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Good
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: H230154NWDOTNBI,  Location: I-90 MILE MARKER 104.9 (Lat: 42.250442,  Lng: -71.585700),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.91m (12.83ft),  Average Daily Traffic: 49,073 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 140,935 (year 2031),  Design Load: HS 20,  Features Intersected: ST135 WOOD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 168.816,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 16.3m (53.5ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,703,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $4,055,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: H230154NXDOTNBI,  Location: 1-90 MM 104.9 (Lat: 42.250544,  Lng: -71.585967),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.91m (12.83ft),  Average Daily Traffic: 48,720 (year 2017),  Truck Traffic: 15%,  Average Future Daily Traffic: 140,935 (year 2031),  Design Load: HS 20,  Features Intersected: ST135 WOOD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 168.816,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 16.3m (53.5ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,703,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $4,055,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W2400722VDOT634,  Location: 1 MI S OF ST-9 (Lat: 42.274314,  Lng: -71.624914),  Route carried "on" structure: State highway 135,  Year Built: 1900,  Year Reconstructed: 1963,  Status: Open,  Structure Length: 3.37m (11.06ft),  Average Daily Traffic: 11,980 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 20,531 (year 2032),  Design Load: H 20,  Features Intersected: RR MBTA/CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.536,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 48.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,990,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $2,986,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W24009230DOT634,  Location: .7 MI S OF ST-9 (Lat: 42.270828,  Lng: -71.641619),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 9,762 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,583 (year 2032),  Design Load: H 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY OTIS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 70.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $983,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,475,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W240141M2DOTNBI,  Location: .8MI. W. OF LYMAN ST. (Lat: 42.283736,  Lng: -71.632692),  Route carried "on" structure: State highway 9,  Year Built: 1930,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 42,013 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 87,177 (year 2032),  Design Load: H 20,  Features Intersected: ST135 MILK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 170.270,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.8m (35.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 29.6m (97.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,396,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $2,095,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W240151M1DOTNBI,  Location: 1.5 MI. W. OF I-495 (Lat: 42.286522,  Lng: -71.596006),  Route carried "on" structure: State highway 9,  Year Built: 1930,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 54,963 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 90,020 (year 2032),  Design Load: H 20,  Features Intersected: ST 30 E MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 173.241,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 35 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $229,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $344,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W240171J6MUNNBI,  Location: .5 MI. WEST OF ROUTE 135 (Lat: 42.274083,  Lng: -71.632197),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 1,170 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,848 (year 2032),  Design Load: H 15,  Features Intersected: WATER ASSABET RIVER,  Facility Carried by Structure: HWY MAYNARD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $544,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W240181J7MUNNBI,  Location: @ THE CORNER OF BROOK WAY (Lat: 42.256208,  Lng: -71.633992),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 1,300 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,053 (year 2032),  Design Load: H 15,  Features Intersected: WATER ASSABET RIVER,  Facility Carried by Structure: HWY OLD NOURS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.5m (21.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Inventory Rating: 61.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $357,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $536,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W24028AXXMUNNBI,  Location: .3 MI S OF FISHER ST. (Lat: 42.269414,  Lng: -71.633394),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,000 (year 2012),  Average Future Daily Traffic: 4,738 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: WATER ASSABET RIVER,  Facility Carried by Structure: HWY MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $377,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $566,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W240294NKDOTNBI,  Location: .5 MI N OF UPTON TWN LN (Lat: 42.233356,  Lng: -71.609356),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 49,905 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 97,198 (year 2032),  Design Load: HS 20,  Features Intersected: HWY BOWMAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 166.080,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,014,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,522,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W240294NLDOTNBI,  Location: .5 MI N OF UPTON TWN LN (Lat: 42.233564,  Lng: -71.609358),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 50,236 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 97,198 (year 2032),  Design Load: HS 20,  Features Intersected: HWY BOWMAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 166.080,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,014,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,522,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W240304NJDOTNBI,  Location: 0.75 MI W OF REST AREA (Lat: 42.236011,  Lng: -71.604156),  Route carried "on" structure: City street ,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 10.76m (35.30ft),  Average Daily Traffic: 5,542 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,054 (year 2032),  Design Load: HS 20,  Features Intersected: I 90,  Facility Carried by Structure: HWY UPTON RD
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 166.723,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 42.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.80m (35.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $5,218,000,  Roadway Improvement Cost: $522,000,  Total Project Cost: $7,828,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W240314NHDOTNBI,  Location: AT I-90 MM 103.9 (Lat: 42.239092,  Lng: -71.598994),  Route carried "on" structure: City street ,  Year Built: 1957,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 6.36m (20.87ft),  Average Daily Traffic: 860 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 790 (year 2032),  Design Load: HS 20,  Features Intersected: I 90,  Facility Carried by Structure: HWY SPRING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 167.206,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.2m (72.8ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,640,000,  Roadway Improvement Cost: $265,000,  Total Project Cost: $3,961,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W240261M3DOTNBI,  Location: LYONS ST/ST 9 (Lat: 42.283333,  Lng: -71.583333),  Route carried "under" structure: State highway 9,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 0000),  Features Intersected: ST 9 WB,  Facility Carried by Structure: HWY LYONS ST
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: W240261M3DOTNBI,  Location: LYONS ST/ST 9 (Lat: 42.283333,  Lng: -71.583333),  Route carried "under" structure: State highway 9,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 0000),  Features Intersected: ST 9 EB,  Facility Carried by Structure: HWY LYONS ST
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: W240304NJDOTNBI,  Location: .5 MI NORTH UPTON TWN LN (Lat: 42.233333,  Lng: -71.600000),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 28,000 (year 0000),  Features Intersected: I 90 WB,  Facility Carried by Structure: HWY UPTON RD
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 166.723,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: W240304NJDOTNBI,  Location: .5 MI NORTH UPTON TWN LN (Lat: 42.233333,  Lng: -71.600000),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 27,900 (year 0000),  Features Intersected: I 90 EB,  Facility Carried by Structure: HWY UPTON RD
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 166.723,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: W240314NHDOTNBI,  Location: 1 MI NORTH UPTON TWN LINE (Lat: 42.233333,  Lng: -71.600000),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 28,000 (year 2000),  Features Intersected: I 90 WB,  Facility Carried by Structure: HWY SPRING RD
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 167.206,  Lanes on structure: 3,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: W240314NHDOTNBI,  Location: 1 MI NORTH UPTON TWN LINE (Lat: 42.233333,  Lng: -71.600000),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 28,000 (year 2000),  Features Intersected: I 90 EB,  Facility Carried by Structure: HWY SPRING RD
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 167.206,  Lanes on structure: 3,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Discuss Westborough, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.