Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Wheatland, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 220ft / 67.0mTotal length
  • $35,301,000Total costs
  • 121,096Total average daily traffic
  • 16,122Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wheatland
  • No street view available for this location

New bridges in Wheatland, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 31910-1919
  • 11920-1929
  • 11940-1949
  • 111950-1959
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 11990-1999
Reconstructed bridges in Wheatland, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 11980-1989
  • 11990-1999
  • 32000-2009
  • 12010-2019
Average Bridge Daily Traffic in Wheatland, NY
Average Bridge Truck Traffic in Wheatland, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Excellent
  • 7.1%Very good
  • 28.6%Good
  • 21.4%Satisfactory
  • 21.4%Fair
  • 7.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Excellent
  • 14.3%Very good
  • 35.7%Good
  • 42.9%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 35.7%Good
  • 21.4%Satisfactory
  • 28.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.0%Good
  • 60.0%Satisfactory
  • 10.0%Fair
Find on map >>   Show street view

Structure Number: 102375,  Location: 1.2MI S INTERS.RTS 36&383 (Lat: 42.995631,  Lng: -77.862300),  Route carried "on" structure: State highway 36,  Year Built: 1989,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 4,505 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,532 (year 2040),  Design Load: HS 20,  Features Intersected: Oatka Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,929,000,  Roadway Improvement Cost: $1,129,000,  Total Project Cost: $3,058,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102376,  Location: JCT RTS36+NYS THRUWAY I90 (Lat: 43.030050,  Lng: -77.877172),  Route carried "on" structure: State highway 36,  Year Built: 1954,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 1,206 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,258 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX, RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.358,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.16m (23.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,703,000,  Roadway Improvement Cost: $997,000,  Total Project Cost: $2,701,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104339,  Location: 3.2 MI W JCT RTS 251 & 15 (Lat: 43.004933,  Lng: -77.730733),  Route carried "on" structure: State highway 251,  Year Built: 1995,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 3,046 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,064 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: GENESEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.848,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.32m (27.30ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $2,323,000,  Roadway Improvement Cost: $1,360,000,  Total Project Cost: $3,683,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104344,  Location: RT 253 OVER GENESEE RIVER (Lat: 43.029636,  Lng: -77.723242),  Route carried "on" structure: State highway 253,  Year Built: 1976,  Status: Open,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 4,705 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,715 (year 2040),  Design Load: HS 20,  Features Intersected: GENESEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.593,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.5m (119.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.74m (25.39ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $3,509,000,  Roadway Improvement Cost: $2,055,000,  Total Project Cost: $5,564,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 331736,  Location: 0.5 MI W OF MUMFORD (Lat: 42.992383,  Lng: -77.862331),  Route carried "on" structure: County highway ,  Year Built: 1912,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,662 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,327 (year 2036),  Features Intersected: Spring Creek Branch 2,  Facility Carried by Structure: GEORGE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 11.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 8.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $388,000,  Roadway Improvement Cost: $227,000,  Total Project Cost: $615,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 331737,  Location: .15 MI S INT RTS 383 & 36 (Lat: 42.998094,  Lng: -77.852547),  Route carried "on" structure: County highway ,  Year Built: 1923,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 195 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 273 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: OATKA CREEK TRIB.,  Facility Carried by Structure: TWIN BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $503,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331738,  Location: .15 MI S INT RTS 383 & 36 (Lat: 42.998697,  Lng: -77.852517),  Route carried "on" structure: County highway ,  Year Built: 1890,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 195 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 273 (year 2036),  Features Intersected: OATKA CREEK,  Facility Carried by Structure: TWIN BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $614,000,  Roadway Improvement Cost: $359,000,  Total Project Cost: $973,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 331791,  Location: 0.5 MI NE OF WEST CHILI (Lat: 43.010131,  Lng: -77.791689),  Route carried "on" structure: Other road ,  Year Built: 1915,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 586 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 820 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: OATKA CREEK,  Facility Carried by Structure: UNION STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.430,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,111,000,  Roadway Improvement Cost: $650,000,  Total Project Cost: $1,761,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 331792,  Location: 2 MI SW OF GARBUTT (Lat: 43.005681,  Lng: -77.821486),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 1,191 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,667 (year 2037),  Design Load: HS 20,  Features Intersected: OATKA CREEK,  Facility Carried by Structure: Wheatland Center R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.011,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 84.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $756,000,  Roadway Improvement Cost: $443,000,  Total Project Cost: $1,199,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335909,  Location: 1 MI SW OF SCOTTSVILLE (Lat: 43.009350,  Lng: -77.765533),  Route carried "on" structure: County highway ,  Year Built: 1948,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 501 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 701 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: OATKA CREEK,  Facility Carried by Structure: BOWERMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.172,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,236,000,  Roadway Improvement Cost: $724,000,  Total Project Cost: $1,960,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 551052,  Location: 5.4 MI E OF EXIT 47 90I (Lat: 43.029958,  Lng: -77.860147),  Route carried "on" structure: Interstate 90,  Year Built: 1952,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 21,392 (year 2020),  Truck Traffic: 35%,  Average Future Daily Traffic: 26,239 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MUMFORD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.620,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 40.3m (132.2ft),  Out-to-Out Width: 44.8m (147.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,669,000,  Roadway Improvement Cost: $1,563,000,  Total Project Cost: $4,232,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 551053,  Location: 7.5 MI E OF EXIT 47 90I (Lat: 43.033269,  Lng: -77.820606),  Route carried "on" structure: Interstate 90,  Year Built: 1952,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 21,392 (year 2020),  Truck Traffic: 35%,  Average Future Daily Traffic: 26,239 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.919,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $308,000,  Total Project Cost: $833,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 551083,  Location: 3.6 MI E OF EXIT 47 90I (Lat: 43.029928,  Lng: -77.894878),  Route carried "on" structure: County highway ,  Year Built: 1952,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 261 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 365 (year 2037),  Design Load: HS 20,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: CR 166 BEULAH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.623,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.97m (22.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,647,000,  Roadway Improvement Cost: $965,000,  Total Project Cost: $2,612,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 551084,  Location: 8.8 MI E OF EXIT 47 90I (Lat: 43.029611,  Lng: -77.843525),  Route carried "on" structure: County highway ,  Year Built: 1952,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 323 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 452 (year 2036),  Features Intersected: 90IX, RTE I90,  Facility Carried by Structure: WINSLOW RD CR 188
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,852,000,  Roadway Improvement Cost: $1,085,000,  Total Project Cost: $2,937,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 551085,  Location: 7.9 MI E OF EXIT 47 90I (Lat: 43.035942,  Lng: -77.812731),  Route carried "on" structure: County highway ,  Year Built: 1954,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 261 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 365 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: 90IX, RTE I90,  Facility Carried by Structure: CR 174 WHEATLAND C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.551,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.07m (23.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,684,000,  Roadway Improvement Cost: $986,000,  Total Project Cost: $2,670,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102376,  Location: JCT RTS36+NYS THRUWAY I90 (Lat: 43.030050,  Lng: -77.877172),  Route carried "under" structure: Interstate 90,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 14,200 (year 1973),  Features Intersected: 90IX, RTE I90,  Facility Carried by Structure: RTE 36
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 601.975,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 551052,  Location: 5.4 MI E OF EXIT 47 90I (Lat: 43.029958,  Lng: -77.860147),  Route carried "under" structure: County highway ,  Year Built: 1952,  Structure Length: 0. m,  Features Intersected: MUMFORD RD,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 9.4m (30.8ft)

Find on map >>   Show street view

Structure Number: 551083,  Location: 3.6 MI E OF EXIT 47 90I (Lat: 43.029928,  Lng: -77.894878),  Route carried "under" structure: Interstate 90,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 12,397 (year 1977),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: CR 166 BEULAH RD
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 603.423,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.2m (72.8ft)

Find on map >>   Show street view

Structure Number: 551084,  Location: 8.8 MI E OF EXIT 47 90I (Lat: 43.029611,  Lng: -77.843525),  Route carried "under" structure: Interstate 90,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 15,060 (year 2014),  Features Intersected: 90IX, RTE I90,  Facility Carried by Structure: WINSLOW RD CR 188
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 599.208,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 551085,  Location: 7.9 MI E OF EXIT 47 90I (Lat: 43.035942,  Lng: -77.812731),  Route carried "under" structure: Interstate 90,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 15,060 (year 2014),  Features Intersected: 90IX, RTE I90,  Facility Carried by Structure: CR 174 WHEATLAND C
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 596.601,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 704718,  Location: 1.0MI W JCT RTS 383 + 251 (Lat: 43.013678,  Lng: -77.773978),  Route carried "under" structure: State highway 383,  Year Built: 1911,  Structure Length: 0. m,  Average Daily Traffic: 2,958 (year 2002),  Features Intersected: RTE 383,  Facility Carried by Structure: ROCH & SOUTHERN
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 7.788,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 30.7m (100.7ft)

Discuss Wheatland, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.