Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Zionsville, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 102Number of bridges
  • 846ft / 258mTotal length
  • $6,413,000Total costs
  • 873,191Total average daily traffic
  • 100,208Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Zionsville
  • No street view available for this location

New bridges in Zionsville, IN - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11900-1909
  • 21920-1929
  • 61930-1939
  • 21940-1949
  • 101950-1959
  • 221960-1969
  • 241970-1979
  • 91980-1989
  • 121990-1999
  • 62000-2009
  • 72010-2019
Reconstructed bridges in Zionsville, IN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 91970-1979
  • 91980-1989
  • 81990-1999
  • 02000-2009
  • 92010-2019
  • 12020-2022
Average Bridge Daily Traffic in Zionsville, IN
Average Bridge Truck Traffic in Zionsville, IN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.4%Excellent
  • 8.6%Very good
  • 32.9%Good
  • 38.6%Satisfactory
  • 12.9%Fair
  • 5.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.6%Very good
  • 24.3%Good
  • 42.9%Satisfactory
  • 15.7%Fair
  • 7.1%Poor
  • 1.4%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.7%Very good
  • 48.6%Good
  • 28.6%Satisfactory
  • 12.9%Fair
  • 4.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.2%Very good
  • 29.4%Good
  • 30.9%Satisfactory
  • 17.6%Fair
  • 8.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 8.3%Very good
  • 58.3%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 3200027,  Location: 00.10 E OF CR 950 E (Lat: 39.902289,  Lng: -86.351897),  Route carried "on" structure: County highway 244,  Year Built: 1935,  Year Reconstructed: 1983,  Status: Posted for load,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 850 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,400 (year 2040),  Features Intersected: BATZ DRAIN,  Facility Carried by Structure: CR 950N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.5m (21.3ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3200224,  Location: 00.60 W OF CR 950 E (Lat: 39.909389,  Lng: -86.367011),  Route carried "on" structure: County highway 1000,  Year Built: 1991,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 6,225 (year 2040),  Design Load: HS 20,  Features Intersected: DUGAN DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $180,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3715,  Location: 00.48 S I-865 (Lat: 39.925189,  Lng: -86.334200),  Route carried "under" structure: City street ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 2,775 (year 2004),  Truck Traffic: 5%,  Features Intersected: LAFAYETTE ROAD NBL,  Facility Carried by Structure: I-65 NB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 3715,  Location: 00.48 S I-865 (Lat: 39.925189,  Lng: -86.334200),  Route carried "under" structure: City street ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 2,775 (year 2004),  Truck Traffic: 5%,  Features Intersected: LAFAYETTE ROAD SBL,  Facility Carried by Structure: I-65 NB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 3716,  Location: 00.48 S I-865 (Lat: 39.925389,  Lng: -86.334719),  Route carried "under" structure: City street ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 2,775 (year 2004),  Truck Traffic: 5%,  Features Intersected: LAFAYETTE ROAD NBL,  Facility Carried by Structure: I-65 SB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 3716,  Location: 00.48 S I-865 (Lat: 39.925389,  Lng: -86.334719),  Route carried "under" structure: City street ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 2,775 (year 2004),  Truck Traffic: 5%,  Features Intersected: LAFAYETTE ROAD SBL,  Facility Carried by Structure: I-65 SB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 506,  Location: 01.71 W US 421 (Lat: 39.927750,  Lng: -86.259869),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 710 (year 2004),  Truck Traffic: 15%,  Features Intersected: ZIONSVILLE ROAD,  Facility Carried by Structure: I-465 EB
Minimum Vertical Clearance: 4.33m (14.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 5061,  Location: 01.71 W US 421 (Lat: 39.927989,  Lng: -86.259861),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 710 (year 2004),  Truck Traffic: 15%,  Features Intersected: ZIONSVILLE ROAD,  Facility Carried by Structure: I-465 WB
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 5062,  Location: 01.97 W US 421 (Lat: 39.928989,  Lng: -86.264339),  Route carried "under" structure: Interstate 865,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 11,495 (year 2010),  Truck Traffic: 25%,  Features Intersected: I-865 WB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 7.339,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.3m (53.5ft)

Find on map >>   Show street view

Structure Number: 5062,  Location: 01.97 W US 421 (Lat: 39.928989,  Lng: -86.264339),  Route carried "under" structure: Interstate 865,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 11,495 (year 2010),  Truck Traffic: 25%,  Features Intersected: I-865 EB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 7.339,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.3m (53.5ft)

Find on map >>   Show street view

Structure Number: 5063,  Location: 02.19 W US 421 (Lat: 39.929969,  Lng: -86.268081),  Route carried "under" structure: Interstate 865,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 13,939 (year 2014),  Truck Traffic: 5%,  Features Intersected: I-865 WBL & WB RAMP,  Facility Carried by Structure: I-465 WB TO I-465
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 6.985,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.7m (74.5ft)

Find on map >>   Show street view

Structure Number: 5063,  Location: 02.19 W US 421 (Lat: 39.929969,  Lng: -86.268081),  Route carried "under" structure: Interstate 865,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 13,939 (year 2014),  Truck Traffic: 5%,  Features Intersected: I-865 EBL,  Facility Carried by Structure: I-465 WB TO I-465
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 6.985,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.7m (74.5ft)

Find on map >>   Show street view

Structure Number: 5064,  Location: 04.40 N I-65 (Lat: 39.924950,  Lng: -86.267900),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 928 (year 2004),  Truck Traffic: 5%,  Features Intersected: 96TH ST EB & WB,  Facility Carried by Structure: I-465 NB
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 5065,  Location: 04.40 N I-65 (Lat: 39.924939,  Lng: -86.268269),  Route carried "under" structure: City street ,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 928 (year 2004),  Truck Traffic: 5%,  Features Intersected: 96TH ST EB & WB,  Facility Carried by Structure: I-465 SB
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 11.8m (38.7ft)

Find on map >>   Show street view

Structure Number: 5123,  Location: 00.54 E I-65 (Lat: 39.931089,  Lng: -86.339289),  Route carried "under" structure: Interstate 65,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 26,336 (year 2004),  Truck Traffic: 5%,  Features Intersected: I65 SB
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 206.785,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 5123,  Location: 00.54 E I-65 (Lat: 39.931089,  Lng: -86.339289),  Route carried "under" structure: Interstate 65,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 26,336 (year 2004),  Truck Traffic: 5%,  Features Intersected: I65 NB
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 206.785,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 5126,  Location: 01.50 E I-65 (Lat: 39.931700,  Lng: -86.321400),  Route carried "under" structure: Interstate 865,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 13,744 (year 2010),  Truck Traffic: 15%,  Features Intersected: I-865 EB,  Facility Carried by Structure: KISSEL ROAD
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.0m (65.6ft)

Find on map >>   Show street view

Structure Number: 5126,  Location: 01.50 E I-65 (Lat: 39.931700,  Lng: -86.321400),  Route carried "under" structure: Interstate 865,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 13,744 (year 2010),  Truck Traffic: 15%,  Features Intersected: I-865 WB,  Facility Carried by Structure: KISSEL ROAD
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.0m (65.6ft)

Find on map >>   Show street view

Structure Number: 5127,  Location: 02.25 E I-65 (Lat: 39.931450,  Lng: -86.307250),  Route carried "under" structure: Interstate 865,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 13,744 (year 2010),  Truck Traffic: 15%,  Features Intersected: I-865 EB,  Facility Carried by Structure: COOPER ROAD
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 3.621,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.0m (65.6ft)

Find on map >>   Show street view

Structure Number: 5127,  Location: 02.25 E I-65 (Lat: 39.931450,  Lng: -86.307250),  Route carried "under" structure: Interstate 865,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 13,744 (year 2010),  Truck Traffic: 15%,  Features Intersected: I-865 WB,  Facility Carried by Structure: COOPER ROAD
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 3.621,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.0m (65.6ft)

Find on map >>   Show street view

Structure Number: 513,  Location: 03.77 E I-65 (Lat: 39.930761,  Lng: -86.278831),  Route carried "under" structure: Interstate 865,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 13,205 (year 2010),  Truck Traffic: 23%,  Features Intersected: I-865 EB,  Facility Carried by Structure: FORD ROAD
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 6.067,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.0m (65.6ft)

Find on map >>   Show street view

Structure Number: 513,  Location: 03.77 E I-65 (Lat: 39.930761,  Lng: -86.278831),  Route carried "under" structure: Interstate 865,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 13,205 (year 2010),  Truck Traffic: 23%,  Features Intersected: I-865 WB,  Facility Carried by Structure: FORD ROAD
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 6.067,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.0m (65.6ft)

Discuss Zionsville, Indiana (IN) on our hugely popular Indiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.