Bridge Statistics for Byram, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 44Number of bridges
  • 663ft / 202mTotal length
  • $1,648,974,000Total costs
  • 277,530Total average daily traffic
  • 28,004Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Byram
  • No street view available for this location

New bridges in Byram, MS - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 81950-1959
  • 31960-1969
  • 21970-1979
  • 81980-1989
  • 141990-1999
  • 12000-2009
  • 32010-2019
  • 42020-2022
Reconstructed bridges in Byram, MS - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Byram, MS
Average Bridge Truck Traffic in Byram, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.8%Very good
  • 50.0%Good
  • 26.5%Satisfactory
  • 14.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 26.5%Very good
  • 38.2%Good
  • 26.5%Satisfactory
  • 8.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 26.5%Very good
  • 35.3%Good
  • 8.8%Satisfactory
  • 11.8%Fair
  • 11.8%Poor
  • 2.9%Critical
  • 2.9%Imminent failure
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.8%Very good
  • 23.1%Good
  • 25.6%Satisfactory
  • 15.4%Fair
  • 5.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 33.3%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: SA6100000000052,  Location: SEC 20 T 4N R 1E B (Lat: 32.169278,  Lng: -90.227494),  Route carried "on" structure: County highway 425,  Year Built: 1988,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 7,300 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,950 (year 2040),  Design Load: HS 20,  Features Intersected: PEARL RIVER RELIEF,  Facility Carried by Structure: FLORENCE-BYRAM RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.19m (39.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $728,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $897,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 41000550250841,  Location: BYRAM INTERCHANGE (Lat: 32.183989,  Lng: -90.257181),  Route carried "under" structure: Interstate 55,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 24,500 (year 2017),  Truck Traffic: 8%,  Features Intersected: I 55,  Facility Carried by Structure: SIWELL ROAD
Minimum Vertical Clearance: 5.42m (17.78ft),  Kilometerpoint: 27.415,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 41000550250841,  Location: BYRAM INTERCHANGE (Lat: 32.183911,  Lng: -90.257061),  Route carried "under" structure: Interstate 55,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 24,500 (year 2017),  Truck Traffic: 8%,  Features Intersected: I 55,  Facility Carried by Structure: SIWELL ROAD
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 16.847,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 41000550250864,  Location: 4.9 MI S JCT I55S I20W (Lat: 32.209989,  Lng: -90.235800),  Route carried "under" structure: Interstate 55,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 24,500 (year 2017),  Truck Traffic: 8%,  Features Intersected: I 55,  Facility Carried by Structure: OLD BYRAM ROAD
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 23.859,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 41000550250864,  Location: 4.9 MI S JCT I55S I20W (Lat: 32.209881,  Lng: -90.235731),  Route carried "under" structure: Interstate 55,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 24,500 (year 2017),  Truck Traffic: 8%,  Features Intersected: I 55,  Facility Carried by Structure: OLD BYRAM ROAD
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 20.398,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.4m (66.9ft)