Bridge Statistics for Crystal Springs, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 44Number of bridges
  • 404ft / 123mTotal length
  • $3,224,796,000Total costs
  • 224,025Total average daily traffic
  • 39,931Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Crystal Springs
  • No street view available for this location

New bridges in Crystal Springs, MS - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 221960-1969
  • 11970-1979
  • 41980-1989
  • 21990-1999
  • 102000-2009
  • 22010-2019
Average Bridge Daily Traffic in Crystal Springs, MS
Average Bridge Truck Traffic in Crystal Springs, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 32.1%Good
  • 35.7%Satisfactory
  • 21.4%Fair
  • 10.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.7%Very good
  • 35.7%Good
  • 32.1%Satisfactory
  • 14.3%Fair
  • 7.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.7%Very good
  • 35.7%Good
  • 28.6%Satisfactory
  • 21.4%Fair
  • 3.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Very good
  • 29.2%Good
  • 41.7%Satisfactory
  • 20.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 11000550150650A,  Location: 5.9 MI S SR 27 (Lat: 31.934725,  Lng: -90.398178),  Route carried "on" structure: Interstate 55,  Year Built: 1963,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 13,000 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 15,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CLEAR CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.006,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 75.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $123,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $323,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550150650B,  Location: 5.9 MI S SR 27 (Lat: 31.933897,  Lng: -90.397719),  Route carried "on" structure: Interstate 55,  Year Built: 1963,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 13,000 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 15,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CLEAR CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.582,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 75.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $123,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $323,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550150703A,  Location: 0.6 MI S SR 27 (Lat: 32.006878,  Lng: -90.366333),  Route carried "on" structure: Interstate 55,  Year Built: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 14,000 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 15,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SPRING BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.444,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550150703B,  Location: 0.6 MI S SR 27 (Lat: 32.006553,  Lng: -90.365683),  Route carried "on" structure: Interstate 55,  Year Built: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 14,000 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 15,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SPRING BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.193,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550150709A,  Location: I 55 OVER SR 27 (Lat: 32.015250,  Lng: -90.361853),  Route carried "on" structure: Interstate 55,  Year Built: 1960,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 14,000 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 15,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SR 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.424,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $201,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $401,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550150709B,  Location: I 55 OVER SR 27 (Lat: 32.014519,  Lng: -90.361939),  Route carried "on" structure: Interstate 55,  Year Built: 1960,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 14,000 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 15,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SR 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.146,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $201,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $401,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550150732A,  Location: 0.5 MI S HINDS CL (Lat: 32.044433,  Lng: -90.343347),  Route carried "on" structure: Interstate 55,  Year Built: 1960,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 16,000 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 18,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: HENRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.745,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 75.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $123,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $323,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11000550150732B,  Location: 0.5 MI S HINDS CL (Lat: 32.043756,  Lng: -90.342883),  Route carried "on" structure: Interstate 55,  Year Built: 1960,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 16,000 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 18,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: HENRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.854,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 75.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $123,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $323,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000270150794,  Location: 3.5 MI S SR 51 (Lat: 31.989614,  Lng: -90.302192),  Route carried "on" structure: State highway 27,  Year Built: 1959,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 4,000 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,000 (year 2040),  Design Load: HS 15,  Features Intersected: UNNAMED STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.982,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 52.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020
Find on map >>   Show street view

Structure Number: 31000270150824,  Location: 0.5 MI E SR 51 (Lat: 32.007653,  Lng: -90.346933),  Route carried "on" structure: State highway 27,  Year Built: 1959,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 13,000 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 14,000 (year 2040),  Design Load: HS 20,  Features Intersected: CNIC RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.651,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $95,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $343,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000270150849,  Location: 1.6 MI N I 55 (Lat: 32.028231,  Lng: -90.383617),  Route carried "on" structure: State highway 27,  Year Built: 1959,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 3,300 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,300 (year 2040),  Design Load: HS 20,  Features Intersected: WHITE OAK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.819,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 69.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $82,000,000,  Roadway Improvement Cost: $200,000,000,  Total Project Cost: $327,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 41000550150676,  Location: CRYSTAL SPRINGS (Lat: 31.969583,  Lng: -90.381058),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 4,400 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,400 (year 2040),  Design Load: HS 20,  Features Intersected: I 55,  Facility Carried by Structure: PAT HARRISON DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.158,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Inventory Rating: 62.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 41000550150694,  Location: 1.5 MI S SR 27 (Lat: 31.994036,  Lng: -90.371153),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 1,900 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,900 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: I 55,  Facility Carried by Structure: OLD SR 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.490,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 96.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA1500000000004,  Location: SEC 8 T 1N R 1W (Lat: 31.942639,  Lng: -90.327833),  Route carried "on" structure: County highway 70,  Year Built: 2005,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 100 (year 2015),  Average Future Daily Traffic: 170 (year 2041),  Design Load: H 15,  Features Intersected: LITTLE COPIAH CREEK,  Facility Carried by Structure: EARL KNIGHT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $228,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000005,  Location: SEC 9 T 1N R 1W B (Lat: 31.934278,  Lng: -90.311167),  Route carried "on" structure: County highway 71,  Year Built: 2009,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 80 (year 2015),  Average Future Daily Traffic: 130 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB TO LITTLE COPIAH CK,  Facility Carried by Structure: ALFORD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.218,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Inventory Rating: 71.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $171,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: SA1500000000013,  Location: SEC 1 T 1N R 2W B (Lat: 31.958917,  Lng: -90.348056),  Route carried "on" structure: County highway 69,  Year Built: 1998,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 150 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 250 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE COPIAH CREEK,  Facility Carried by Structure: MATHIS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.896,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $480,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000014,  Location: SEC 4 T 1N R 2W B (Lat: 31.954556,  Lng: -90.410528),  Route carried "on" structure: County highway 168,  Year Built: 1960,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 120 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 200 (year 2041),  Design Load: H 15,  Features Intersected: LAKE COPIAH SPILLWAY,  Facility Carried by Structure: COPIAH LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.804,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 40.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $76,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $114,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000043,  Location: SEC 7 T 2N R 1W B (Lat: 32.032167,  Lng: -90.334028),  Route carried "on" structure: County highway 53,  Year Built: 1986,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 600 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 900 (year 2035),  Design Load: HS 20,  Features Intersected: ICGRR,  Facility Carried by Structure: CO LINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000046,  Location: SEC 15 T 2N R 1W B (Lat: 32.020572,  Lng: -90.296019),  Route carried "on" structure: County highway 311,  Year Built: 2001,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 350 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 550 (year 2040),  Design Load: H 15,  Features Intersected: HALEY CREEK,  Facility Carried by Structure: BARNES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.199,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $285,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000049,  Location: SEC 20 T 2N R 1W B (Lat: 32.002222,  Lng: -90.313611),  Route carried "on" structure: County highway 311,  Year Built: 1980,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 350 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 585 (year 2041),  Features Intersected: BRUSHY CREEK,  Facility Carried by Structure: BARNES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.141,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $228,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000054,  Location: SEC 34 T 2N R 1W B (Lat: 31.969306,  Lng: -90.290361),  Route carried "on" structure: County highway 524,  Year Built: 1962,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 240 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 403 (year 2040),  Design Load: H 15,  Features Intersected: BRUSHY CREEK,  Facility Carried by Structure: SIX MILE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $360,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000055,  Location: SEC 1 T 2N R 2W B (Lat: 32.037611,  Lng: -90.362194),  Route carried "on" structure: County highway 179,  Year Built: 2007,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 60 (year 2015),  Average Future Daily Traffic: 100 (year 2040),  Design Load: HS 20,  Features Intersected: WHITE OAK CREEK,  Facility Carried by Structure: TAYLOR GROVE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.057,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $186,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $279,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000056,  Location: SEC 3 T 2N R 2W B (Lat: 32.042389,  Lng: -90.389889),  Route carried "on" structure: County highway 179,  Year Built: 2001,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 60 (year 2015),  Average Future Daily Traffic: 100 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB OF WHITE OAK CREEK,  Facility Carried by Structure: TAYLOR GROVE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $285,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000059,  Location: SEC 10 T 2N R 2W B (Lat: 32.024750,  Lng: -90.382444),  Route carried "on" structure: County highway 176,  Year Built: 1991,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 320 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 480 (year 2035),  Design Load: HS 20,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: UTICA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $171,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: SA150000000006,  Location: SEC 12 T 2N R 2W B (Lat: 32.032361,  Lng: -90.359667),  Route carried "on" structure: County highway 178,  Year Built: 1963,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 80 (year 2015),  Average Future Daily Traffic: 135 (year 2041),  Design Load: HS 20,  Features Intersected: WHITE OAK CREEK,  Facility Carried by Structure: RHYMES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 45.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $171,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: SA1500000000061,  Location: SEC 12 T 2N R 2W B (Lat: 32.026389,  Lng: -90.351194),  Route carried "on" structure: County highway 284,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 40 (year 2015),  Average Future Daily Traffic: 65 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB TO WHITE OAK CREEK,  Facility Carried by Structure: EAST MADDOX LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.482,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $171,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: SA1500000000062,  Location: SEC 14 T 2N R 2W B (Lat: 32.015889,  Lng: -90.373278),  Route carried "on" structure: County highway 177,  Year Built: 2009,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 220 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 330 (year 2035),  Design Load: H 15,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: RHYMES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $304,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $456,000,000 ( Estimate for 2018),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000063,  Location: SEC 27 T 2N R 2W B (Lat: 31.987500,  Lng: -90.386944),  Route carried "on" structure: County highway 162,  Year Built: 1979,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 320 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 510 (year 2041),  Design Load: HS 20,  Features Intersected: TURKEY CREEK,  Facility Carried by Structure: DEES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $285,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000064,  Location: SEC 32 T 2N R 2W B (Lat: 31.971583,  Lng: -90.419306),  Route carried "on" structure: County highway 169,  Year Built: 1985,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 80 (year 2015),  Average Future Daily Traffic: 130 (year 2040),  Design Load: HS 20,  Features Intersected: TURKEY CREEK,  Facility Carried by Structure: TANYARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.218,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $480,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000065,  Location: SEC 32 T 2N R 2W B (Lat: 31.967889,  Lng: -90.418056),  Route carried "on" structure: County highway 260,  Year Built: 1982,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 60 (year 2014),  Average Future Daily Traffic: 100 (year 2040),  Design Load: HS 20,  Features Intersected: TRIB TO TURKEY CREEK,  Facility Carried by Structure: RAYMOND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 55.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $285,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000066,  Location: SEC 36 T 2N R 2W B (Lat: 31.962167,  Lng: -90.350083),  Route carried "on" structure: County highway 159,  Year Built: 2011,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 15 (year 2015),  Average Future Daily Traffic: 170 (year 2041),  Design Load: H 15,  Features Intersected: LITTLE COPIAH CREEK,  Facility Carried by Structure: HENNINGTON LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $228,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000067,  Location: SEC 36 T 2N R 2W (Lat: 31.973139,  Lng: -90.355167),  Route carried "on" structure: County highway 768,  Year Built: 2007,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 600 (year 2015),  Truck Traffic: 40%,  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: H 15,  Features Intersected: LITTLE COPIAH CREEK,  Facility Carried by Structure: BRADLEY LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $207,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000197,  Location: SEC 18 T 2N R 1W (Lat: 31.998603,  Lng: -90.352106),  Route carried "on" structure: City street 5611,  Year Built: 2005,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 3,900 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,850 (year 2034),  Design Load: HS 20,  Features Intersected: ICGRR,  Facility Carried by Structure: N PAT HARRISON DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.152,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.5m (60.7ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000198,  Location: SEC 35 T 2N R 2W (Lat: 31.969472,  Lng: -90.368167),  Route carried "on" structure: City street 5612,  Year Built: 2005,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 4,100 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,150 (year 2034),  Design Load: HS 20,  Features Intersected: ICGRR,  Facility Carried by Structure: S PAT HARRISON DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.091,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $100,000,  Total Project Cost: $100,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA1500000000209,  Location: SEC 24 T 2N R 2W (Lat: 31.996472,  Lng: -90.361333),  Route carried "on" structure: City street 535,  Year Built: 2006,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 500 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 650 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: CAMP STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.800,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $171,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA150000000A044,  Location: SEC 9 T 2N R 1W (Lat: 32.022528,  Lng: -90.304722),  Route carried "on" structure: County highway 50,  Year Built: 2014,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 80 (year 2015),  Average Future Daily Traffic: 130 (year 2040),  Design Load: HS 20,  Features Intersected: HALEY CREEK,  Facility Carried by Structure: DEAR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.126,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 97.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $65,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $97,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 11000550150709A,  Location: I 55 OVER SR 27 (Lat: 32.015050,  Lng: -90.361969),  Route carried "under" structure: State highway 27,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2017),  Truck Traffic: 8%,  Features Intersected: SR 27,  Facility Carried by Structure: I 55
Minimum Vertical Clearance: 5.45m (17.88ft),  Kilometerpoint: 39.291,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 11000550150709A,  Location: I 55 OVER SR 27 (Lat: 32.014831,  Lng: -90.362089),  Route carried "under" structure: State highway 27,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2017),  Truck Traffic: 8%,  Features Intersected: SR 27,  Facility Carried by Structure: I 55
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.385,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 11000550150709B,  Location: I 55 OVER SR 27 (Lat: 32.014931,  Lng: -90.361719),  Route carried "under" structure: State highway 27,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2017),  Truck Traffic: 8%,  Features Intersected: SR 27,  Facility Carried by Structure: I 55
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 39.265,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 11000550150709B,  Location: I 55 OVER SR 27 (Lat: 32.014711,  Lng: -90.361839),  Route carried "under" structure: State highway 27,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2017),  Truck Traffic: 8%,  Features Intersected: SR 27,  Facility Carried by Structure: I 55
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 0.410,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 41000550150676,  Location: CRYSTAL SPRINGS (Lat: 31.969561,  Lng: -90.380781),  Route carried "under" structure: Interstate 55,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 12,500 (year 2017),  Truck Traffic: 8%,  Features Intersected: I 55,  Facility Carried by Structure: PAT HARRISON DRIVE
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 9.807,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 41000550150676,  Location: CRYSTAL SPRINGS (Lat: 31.969539,  Lng: -90.380489),  Route carried "under" structure: Interstate 55,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 12,500 (year 2017),  Truck Traffic: 8%,  Features Intersected: I 55,  Facility Carried by Structure: PAT HARRISON DRIVE
Minimum Vertical Clearance: 4.96m (16.27ft),  Kilometerpoint: 30.856,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 41000550150694,  Location: 1.5 MI S SR 27 (Lat: 31.993961,  Lng: -90.370911),  Route carried "under" structure: Interstate 55,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2017),  Truck Traffic: 8%,  Features Intersected: I 55,  Facility Carried by Structure: OLD SR 27
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 6.944,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 41000550150694,  Location: 1.5 MI S SR 27 (Lat: 31.993881,  Lng: -90.370650),  Route carried "under" structure: Interstate 55,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2017),  Truck Traffic: 8%,  Features Intersected: I 55,  Facility Carried by Structure: OLD SR 27
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 33.711,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)