Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Grenada, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 94Number of bridges
  • 1,332ft / 406mTotal length
  • $8,251,855,000Total costs
  • 401,371Total average daily traffic
  • 74,548Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Grenada
  • No street view available for this location

New bridges in Grenada, MS - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 41950-1959
  • 351960-1969
  • 131970-1979
  • 61980-1989
  • 161990-1999
  • 52000-2009
  • 132010-2019
Average Bridge Daily Traffic in Grenada, MS
Average Bridge Truck Traffic in Grenada, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.4%Very good
  • 34.3%Good
  • 40.3%Satisfactory
  • 1.5%Fair
  • 1.5%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 31.3%Very good
  • 47.8%Good
  • 13.4%Satisfactory
  • 7.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 28.4%Very good
  • 52.2%Good
  • 16.4%Satisfactory
  • 1.5%Fair
  • 1.5%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.5%Excellent
  • 25.8%Very good
  • 40.9%Good
  • 21.2%Satisfactory
  • 7.6%Fair
  • 3.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 84.6%Good
  • 15.4%Satisfactory
Find on map >>   Show street view

Structure Number: SA2200000000103,  Location: SEC 33 T22N R 5E (Lat: 33.732194,  Lng: -89.784944),  Route carried "on" structure: City street 320,  Year Built: 1982,  Status: Open,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 50 (year 2015),  Average Future Daily Traffic: 75 (year 2035),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: BAILEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $169,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $208,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 11000550222084A,  Location: I 55 OVER US 51 (Lat: 33.823531,  Lng: -89.839189),  Route carried "under" structure: US 51,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,400 (year 2017),  Truck Traffic: 20%,  Features Intersected: US 51,  Facility Carried by Structure: I 55
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 19.137,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 11000550222084B,  Location: I 55 OVER US 51 (Lat: 33.823289,  Lng: -89.838911),  Route carried "under" structure: US 51,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 4,700 (year 2017),  Truck Traffic: 20%,  Features Intersected: US 51,  Facility Carried by Structure: I 55
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 19.101,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 11000550222112A,  Location: I 55 OVER SR 7 NORTH (Lat: 33.862561,  Lng: -89.842250),  Route carried "under" structure: State highway 7,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2017),  Truck Traffic: 12%,  Features Intersected: SR 7,  Facility Carried by Structure: I 55
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 13.620,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 11000550222112B,  Location: I 55 OVER SR 7 NORTH (Lat: 33.862711,  Lng: -89.842011),  Route carried "under" structure: State highway 7,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 2017),  Truck Traffic: 12%,  Features Intersected: SR 7,  Facility Carried by Structure: I 55
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 13.647,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 31000070220670A,  Location: SR 7/SR 8 OVER I 55 (Lat: 33.786069,  Lng: -89.840719),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2017),  Truck Traffic: 30%,  Features Intersected: I 55,  Facility Carried by Structure: SR 7
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 12.608,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 31000070220670A,  Location: SR 7/SR 8 OVER I 55 (Lat: 33.786050,  Lng: -89.840431),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2017),  Truck Traffic: 30%,  Features Intersected: I 55,  Facility Carried by Structure: SR 7
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 12.592,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 31000070220670B,  Location: SR 7/SR 8 OVER I 55 (Lat: 33.785889,  Lng: -89.840731),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2017),  Truck Traffic: 30%,  Features Intersected: I 55,  Facility Carried by Structure: SR 7
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 12.627,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 31000070220670B,  Location: SR 7/SR 8 OVER I 55 (Lat: 33.785869,  Lng: -89.840439),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2017),  Truck Traffic: 30%,  Features Intersected: I 55,  Facility Carried by Structure: SR 7
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 12.572,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 41000550222003A,  Location: 5.5 MI S SR 7 SOUTH (Lat: 33.707650,  Lng: -89.826131),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 20%,  Features Intersected: I 55,  Facility Carried by Structure: HALLS ROAD
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 21.573,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 41000550222003B,  Location: 5.5 MI S SR 7 SOUTH (Lat: 33.710519,  Lng: -89.824489),  Route carried "under" structure: Interstate 55,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 20%,  Features Intersected: I 55,  Facility Carried by Structure: HALLS ROAD
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 3.956,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 41000550222042A,  Location: 1.9 MI S SR 7 SOUTH (Lat: 33.761481,  Lng: -89.844000),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 20%,  Features Intersected: I 55,  Facility Carried by Structure: SWEETHOME ROAD
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 15.372,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 41000550222042B,  Location: 1.9 MI S SR 7 SOUTH (Lat: 33.763031,  Lng: -89.841339),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 20%,  Features Intersected: I 55,  Facility Carried by Structure: SWEETHOME ROAD
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 10.037,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 41000550222077,  Location: 1.9 MI N SR 7/SR 8 (Lat: 33.813650,  Lng: -89.839319),  Route carried "under" structure: Interstate 55,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2017),  Truck Traffic: 30%,  Features Intersected: I 55,  Facility Carried by Structure: PAPER MILL ROAD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 15.659,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 41000550222077,  Location: 1.9 MI N SR 7/SR 8 (Lat: 33.813661,  Lng: -89.839689),  Route carried "under" structure: Interstate 55,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2017),  Truck Traffic: 30%,  Features Intersected: I 55,  Facility Carried by Structure: PAPER MILL ROAD
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 9.543,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Discuss Grenada, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.