  • National Bridge Inventory (NBI) Statistics
  • 214Number of bridges
  • 2,297ft / 700mTotal length
  • $92,010,000Total costs
  • 1,219,812Total average daily traffic
  • 149,700Total average daily truck traffic
  • 1,402,844Total future (year 2013) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Jenkintown
  • No street view available for this location

New bridges in Jenkintown, PA - historical statistics
  • New bridges - historical statistics
  • 7Before 1900
  • 51900-1909
  • 51910-1919
  • 91920-1929
  • 181930-1939
  • 151940-1949
  • 331950-1959
  • 391960-1969
  • 371970-1979
  • 121980-1989
  • 321990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Jenkintown, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21920-1929
  • 01930-1939
  • 11940-1949
  • 21950-1959
  • 51960-1969
  • 51970-1979
  • 61980-1989
  • 131990-1999
  • 262000-2009
  • 212010-2019
  • 22020-2022
Average Bridge Daily Traffic in Jenkintown, PA
Average Bridge Truck Traffic in Jenkintown, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.3%Excellent
  • 35.3%Very good
  • 25.0%Good
  • 22.8%Satisfactory
  • 5.4%Fair
  • 1.1%Poor
  • 0.5%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 13.5%Very good
  • 26.0%Good
  • 25.0%Satisfactory
  • 28.6%Fair
  • 4.7%Poor
  • 2.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 0.5%Excellent
  • 2.1%Very good
  • 30.2%Good
  • 30.2%Satisfactory
  • 29.2%Fair
  • 7.8%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.6%Very good
  • 17.0%Good
  • 29.1%Satisfactory
  • 32.7%Fair
  • 17.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 45.5%Good
  • 27.3%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Find on map >>   Show street view

Structure Number: 29151,  Location: 3 MI N OF TURBOTVILLE (Lat: 41.129250,  Lng: -76.762539),  Route carried "on" structure: State highway ,  Year Built: 1957,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 138 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 371 (year 2032),  Features Intersected: WARIOR RUN CREEK,  Facility Carried by Structure: SR 1010
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.444,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 29155,  Location: 1 MI N OF TURBOTVILLE (Lat: 41.116275,  Lng: -76.770739),  Route carried "on" structure: State highway ,  Year Built: 1921,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 374 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 592 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WARRIOR RUN,  Facility Carried by Structure: SR 1011
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.202,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 81.6 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $198,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29156,  Location: 2.0 MI N OF TURBOTVILLE (Lat: 41.122942,  Lng: -76.772456),  Route carried "on" structure: State highway ,  Year Built: 1949,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 374 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 592 (year 2032),  Design Load: HS 20,  Features Intersected: OVER WARRIOR RUN,  Facility Carried by Structure: SR 1011
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.811,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 29164,  Location: 1.5 MI SE OF MILTON (Lat: 40.983581,  Lng: -76.838481),  Route carried "on" structure: State highway ,  Year Built: 1971,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 4,370 (year 2021),  Truck Traffic: 39%,  Average Future Daily Traffic: 4,431 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 147,  Facility Carried by Structure: SR 1022
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.542,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29247,  Location: 0.5 MI N OF MANDATA (Lat: 40.686203,  Lng: -76.828147),  Route carried "on" structure: State highway ,  Year Built: 1995,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 4,757 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,811 (year 2032),  Features Intersected: OVER FIDDLERS RUN,  Facility Carried by Structure: S.R. 3012
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $30,000,  Total Project Cost: $407,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29655,  Location: 1 MI SOUTH OF BLAIN (Lat: 40.331717,  Lng: -77.503431),  Route carried "on" structure: State highway ,  Year Built: 1959,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 331 (year 2022),  Truck Traffic: 21%,  Average Future Daily Traffic: 418 (year 2032),  Design Load: HS 20,  Features Intersected: SHERMANS CREEK,  Facility Carried by Structure: SR 3006
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.148,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $206,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 29825,  Location: PALMYRA TWP .6 M W TR 390 (Lat: 41.359986,  Lng: -75.215289),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 9,322 (year 2021),  Truck Traffic: 29%,  Average Future Daily Traffic: 12,559 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: TWP ROAD 390 (SHINY MT)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.493,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $26,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $351,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 29826,  Location: PALMYRA TWP OVER TR 390 (Lat: 41.360533,  Lng: -75.202764),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 10,732 (year 2021),  Truck Traffic: 24%,  Average Future Daily Traffic: 11,872 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 0390 TR 390
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.376,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $39,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $528,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 30754,  Location: 1 MI.NORTH OF DELANO (Lat: 40.845992,  Lng: -76.056594),  Route carried "on" structure: State highway ,  Year Built: 1966,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 403 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 526 (year 2032),  Design Load: HL 93,  Features Intersected: I-81 (LR1005),  Facility Carried by Structure: SR 1012 (LR 53041)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.406,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.50m (34.45ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $675,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 30894,  Location: NE OF HEGINS (Lat: 40.668914,  Lng: -76.488242),  Route carried "on" structure: Spur City street ,  Year Built: 1940,  Year Reconstructed: 1996,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 150 (year 2003),  Truck Traffic: 10%,  Average Future Daily Traffic: 165 (year 2023),  Features Intersected: DEEP CREEK,  Facility Carried by Structure: WOOD LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Serious,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $43,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $520,000,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 31082,  Location: 2 MI W OF SELINSGROVE (Lat: 40.775689,  Lng: -76.903367),  Route carried "on" structure: State highway 35,  Year Built: 1956,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 4,880 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,896 (year 2032),  Design Load: HL 93,  Features Intersected: TRIB TO MIDDLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.234,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2019,  Bridge Improvement Cost: $104,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31385,  Location: 1.5 MI.N.OF BERLIN (Lat: 39.934408,  Lng: -78.978892),  Route carried "on" structure: State highway ,  Year Built: 1951,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 4,051 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,977 (year 2032),  Design Load: H 20,  Features Intersected: MILLER RUN,  Facility Carried by Structure: SR 2047
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.511,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $49,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $660,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31388,  Location: SOMERSET-BERLIN INTERCHAN (Lat: 39.982839,  Lng: -79.040908),  Route carried "on" structure: State highway ,  Year Built: 1973,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,052 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,374 (year 2032),  Design Load: HS 20,  Features Intersected: KIMBERLY RUN,  Facility Carried by Structure: SR 2047
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.907,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft)

Condition: Channel: Good,  Culverts: Good,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $476,000
Find on map >>   Show street view

Structure Number: 31389,  Location: BERLIN-SOMERSET INTERCHNG (Lat: 39.983083,  Lng: -79.041461),  Route carried "on" structure: State highway ,  Year Built: 1973,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 12.07m (39.60ft),  Average Daily Traffic: 4,052 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,374 (year 2032),  Design Load: HS 20,  Features Intersected: US 219 (0520 & 0521),  Facility Carried by Structure: SR 2047(0510&0511)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.271,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 24 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 40.2m (131.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.5m (60.7ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.80m (48.56ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Bridge Improvement Cost: $708,000,  Roadway Improvement Cost: $2,086,000,  Total Project Cost: $8,885,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3139,  Location: BERLIN-SOMERSET INTERCHNG (Lat: 39.983253,  Lng: -79.041756),  Route carried "on" structure: US 219,  Year Built: 1973,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 5,096 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,633 (year 2032),  Design Load: HS 20,  Features Intersected: KIMBERLY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.592,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Bridge Improvement Cost: $37,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $497,000
Find on map >>   Show street view

Structure Number: 31391,  Location: OVER PA TURNPIKE (Lat: 39.997592,  Lng: -79.038317),  Route carried "on" structure: US 219,  Year Built: 1973,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 2,306 (year 2022),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,731 (year 2032),  Design Load: HS 20,  Features Intersected: PENNSYLVANIA TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.831,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.9m (121.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $115,000,  Roadway Improvement Cost: $339,000,  Total Project Cost: $1,554,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31392,  Location: OVER PA TURNPIKE (Lat: 39.997703,  Lng: -79.038669),  Route carried "on" structure: US 219,  Year Built: 1973,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 2,759 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,856 (year 2032),  Design Load: HS 20,  Features Intersected: PENNSYLVANIA TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.863,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.9m (121.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $770,000,  Total Project Cost: $3,286,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31393,  Location: 2 MI. NE OF SOMERSET (Lat: 40.027961,  Lng: -79.047867),  Route carried "on" structure: US 219,  Year Built: 1973,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 4,445 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,826 (year 2032),  Design Load: HL 93,  Features Intersected: PA 281
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.676,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.00m (22.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $295,000,  Roadway Improvement Cost: $870,000,  Total Project Cost: $3,711,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31394,  Location: 0.2 MILE NORTH OF TR 281 (Lat: 40.030467,  Lng: -79.050244),  Route carried "on" structure: US 219,  Year Built: 1973,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 4,445 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,826 (year 2032),  Design Load: HS 20,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.676,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.61m (18.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $400,000,  Total Project Cost: $1,835,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31512,  Location: FRIEDENS (Lat: 40.050519,  Lng: -78.990606),  Route carried "on" structure: State highway ,  Year Built: 1949,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 246 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 424 (year 2032),  Design Load: HL 93,  Features Intersected: WELLS CREEK,  Facility Carried by Structure: SR 1002
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $78,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $1,047,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31513,  Location: 3 MI.S.OF FRIEDENS (Lat: 40.030422,  Lng: -78.945025),  Route carried "on" structure: State highway ,  Year Built: 1961,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 246 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 424 (year 2032),  Design Load: H 20,  Features Intersected: BUCK RUN,  Facility Carried by Structure: SR 1002
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.045,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 32495,  Location: BRIDGEWATR TP .1M E TR167 (Lat: 41.819797,  Lng: -75.804150),  Route carried "on" structure: State highway ,  Year Built: 1959,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 107 (year 2022),  Truck Traffic: 23%,  Average Future Daily Traffic: 107 (year 2032),  Design Load: HS 20,  Features Intersected: HOP BOTTOM CREEK,  Facility Carried by Structure: SR 2015
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.373,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $198,000
Find on map >>   Show street view

Structure Number: 32753,  Location: 8 MI W OF WELLSBORO (Lat: 41.771167,  Lng: -77.384061),  Route carried "on" structure: US 6,  Year Built: 1959,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 2,222 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,732 (year 2032),  Design Load: HS 20,  Features Intersected: OVER DANTZ RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.952,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 32756,  Location: 3.3 MI W OF WELSBORO JUCT (Lat: 41.769578,  Lng: -77.353483),  Route carried "on" structure: US 6,  Year Built: 1956,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,222 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,732 (year 2032),  Design Load: HS 20,  Features Intersected: HEISE RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.418,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 32894,  Location: 0.75 MI W OF MILLERTON (Lat: 41.973819,  Lng: -76.948947),  Route carried "on" structure: State highway 328,  Year Built: 1994,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,945 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,005 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER HAMMOND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.545,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3332,  Location: 2.7 MI W OF ROSEVILLE (Lat: 41.867097,  Lng: -77.009319),  Route carried "on" structure: City street ,  Year Built: 1935,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 15 (year 2021),  Average Future Daily Traffic: 22 (year 2043),  Design Load: HS 20,  Features Intersected: BAILEY CREEK,  Facility Carried by Structure: T-894 RUTLAND TWP.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Poor,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $144,000,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 33647,  Location: IRWIN TOWNSHIP (Lat: 41.266694,  Lng: -79.924783),  Route carried "on" structure: State highway 8,  Year Built: 1975,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 4,677 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,207 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER PA 308
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.149,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.60m (21.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $27,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $367,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3377,  Location: CORNPLANTER TOWNSHIP (Lat: 41.516806,  Lng: -79.682750),  Route carried "on" structure: State highway ,  Year Built: 1884,  Year Reconstructed: 1984,  Status: Posted for load,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 69 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 181 (year 2032),  Design Load: H 15,  Features Intersected: OVER OIL CREEK,  Facility Carried by Structure: SR 1004,PTRLM.CNTR
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Fair,  Channel: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.30m (23.95ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $112,000,  Roadway Improvement Cost: $331,000,  Total Project Cost: $1,517,000,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 33855,  Location: JACKSON TOWNSHIP (Lat: 41.476417,  Lng: -79.892906),  Route carried "on" structure: State highway ,  Year Built: 1992,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 112 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 131 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER BEATTY RUN,  Facility Carried by Structure: SR 4016,BEATTY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.673,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 82.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3386,  Location: PLUM TOWNSHIP (Lat: 41.562339,  Lng: -79.801969),  Route carried "on" structure: State highway ,  Year Built: 1950,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 175 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 225 (year 2032),  Design Load: H 20,  Features Intersected: OVER SUGAR CREEK TRIB,  Facility Carried by Structure: SR 4022,BUXTON RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.934,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $22,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33891,  Location: JACKSON TOWNSHIP (Lat: 41.513044,  Lng: -79.854325),  Route carried "on" structure: City street 7209,  Year Built: 1950,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 100 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 140 (year 2035),  Design Load: H 20,  Features Intersected: EAST BR. SUGAR CREEK,  Facility Carried by Structure: T-593, BOALS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $216,000,  Deck Structure Type: Closed Grating
Find on map >>   Show street view

Structure Number: 33892,  Location: JACKSON TOWNSHIP (Lat: 41.513747,  Lng: -79.864378),  Route carried "on" structure: City street 7209,  Year Built: 1982,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 150 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 210 (year 2034),  Design Load: HS 20,  Features Intersected: OVER MIDDLE BR.SUGAR CK.,  Facility Carried by Structure: T-595,CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 23 months,  Inspection Date: April 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33893,  Location: JACKSON TOWNSHIP (Lat: 41.537092,  Lng: -79.889339),  Route carried "on" structure: City street 7209,  Year Built: 1930,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 50 (year 2014),  Average Future Daily Traffic: 70 (year 2034),  Design Load: HS 25 or greater,  Features Intersected: OVER LAKE CREEK,  Facility Carried by Structure: SMALLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 2.7m (8.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 23 months,  Inspection Date: April 2020,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 33895,  Location: JACKSON TOWNSHIP (Lat: 41.547792,  Lng: -79.898703),  Route carried "on" structure: City street 7209,  Year Built: 1993,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 100 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 140 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: LAKE CREEK,  Facility Carried by Structure: JACKSON PLUM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 23 months,  Inspection Date: April 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 339,  Location: SCRUBGRASS TOWNSHIP (Lat: 41.184644,  Lng: -79.815669),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 100 (year 2015),  Average Future Daily Traffic: 140 (year 2035),  Design Load: H 20,  Features Intersected: LITTLE SCRUBGRASS CREEK,  Facility Carried by Structure: T-400,WILLIAMS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 34107,  Location: GLADE TOWNSHIP (Lat: 41.894069,  Lng: -79.131389),  Route carried "on" structure: State highway ,  Year Built: 1972,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 776 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 987 (year 2032),  Design Load: HS 20,  Features Intersected: OVER HATCH RUN,  Facility Carried by Structure: SR 1008,HATCH RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.875,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $64,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 34115,  Location: GLADE TOWNSHIP (Lat: 41.892967,  Lng: -79.138225),  Route carried "on" structure: State highway ,  Year Built: 1953,  Status: Posted for load,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 3,424 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,619 (year 2032),  Design Load: H 20,  Features Intersected: OVER HATCH RUN,  Facility Carried by Structure: SR 1011,CONEWANGO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.784,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $14,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $192,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric