Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Marietta, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 44Number of bridges
  • 522ft / 159mTotal length
  • $412,243,000Total costs
  • 22,570Total average daily traffic
  • 2,169Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Marietta
  • No street view available for this location

New bridges in Marietta, MS - historical statistics
  • New bridges - historical statistics
  • 71950-1959
  • 21960-1969
  • 61970-1979
  • 151980-1989
  • 41990-1999
  • 52000-2009
  • 42010-2019
  • 12020-2022
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.1%Excellent
  • 23.1%Very good
  • 48.7%Good
  • 20.5%Satisfactory
  • 2.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.1%Excellent
  • 33.3%Very good
  • 33.3%Good
  • 15.4%Satisfactory
  • 10.3%Fair
  • 2.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.1%Excellent
  • 28.2%Very good
  • 33.3%Good
  • 15.4%Satisfactory
  • 12.8%Fair
  • 2.6%Poor
  • 2.6%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.9%Very good
  • 30.8%Good
  • 41.0%Satisfactory
  • 7.7%Fair
  • 2.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 50.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 31000040591489,  Location: 0.8 MI E SR 371 (Lat: 34.559817,  Lng: -88.452658),  Route carried "on" structure: State highway 4,  Year Built: 1956,  Status: Posted for load,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: H 15,  Features Intersected: YOUNGS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.290,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $24,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $179,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000040591491,  Location: 1.0 MI E SR 371 (Lat: 34.559814,  Lng: -88.450100),  Route carried "on" structure: State highway 4,  Year Built: 1956,  Status: Posted for load,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: H 15,  Features Intersected: BIG BROWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.525,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 33.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $67,000,000,  Roadway Improvement Cost: $130,000,000,  Total Project Cost: $229,000,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000040591493,  Location: 1.2 MI E SR 371 (Lat: 34.559803,  Lng: -88.447139),  Route carried "on" structure: State highway 4,  Year Built: 1956,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.795,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020
Find on map >>   Show street view

Structure Number: 31003660590047,  Location: 4.7 MI E SR 370 (Lat: 34.507194,  Lng: -88.522650),  Route carried "on" structure: State highway 366,  Year Built: 1994,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 670 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 670 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: PLUM ORCHARD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.614,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 79.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020
Find on map >>   Show street view

Structure Number: 31003660590066,  Location: 6.6 MI E SR 370 (Lat: 34.496003,  Lng: -88.502011),  Route carried "on" structure: State highway 366,  Year Built: 1993,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 610 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 610 (year 2040),  Design Load: HS 20,  Features Intersected: CASEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.667,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31003710290369,  Location: 0.7 MI N NATCHEZ TRACE (Lat: 34.462331,  Lng: -88.485386),  Route carried "on" structure: State highway 371,  Year Built: 1984,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,200 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.333,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 37,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 78.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 3100371029037,  Location: 0.8 MI N NATCHEZ TRACE (Lat: 34.462944,  Lng: -88.484742),  Route carried "on" structure: State highway 371,  Year Built: 1984,  Status: Open,  Structure Length: 5.56m (18.24ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,200 (year 2040),  Design Load: HS 20,  Features Intersected: DONOVAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.423,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 37,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31003710590419,  Location: 2.2 MI S SR 4 (Lat: 34.529689,  Lng: -88.463103),  Route carried "on" structure: State highway 371,  Year Built: 1984,  Status: Open,  Structure Length: 4.64m (15.22ft),  Average Daily Traffic: 1,400 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.506,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 37,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5570231P,  Location: 11.5 MILES NORTH OF MS RO (Lat: 34.456194,  Lng: -88.493989),  Route carried "on" structure: Federal lands road 1,  Year Built: 1979,  Status: Open,  Structure Length: 6.32m (20.73ft),  Average Daily Traffic: 810 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 891 (year 2027),  Design Load: H 15,  Features Intersected: MS ROUTE 371,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 454.157,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $30,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570232P,  Location: 0.83 MILES NORTH OF MS RO (Lat: 34.459972,  Lng: -88.480194),  Route carried "on" structure: Federal lands road 1,  Year Built: 1981,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 800 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 960 (year 2031),  Design Load: H 15,  Features Intersected: DONIVAN CREEK,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 455.493,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $188,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570233P,  Location: 3.17 MILES NORTH OF MS RO (Lat: 34.468611,  Lng: -88.445444),  Route carried "on" structure: Federal lands road 1,  Year Built: 1981,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 810 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 891 (year 2031),  Design Load: H 15,  Features Intersected: COUNTY ROAD,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 459.258,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.5m (44.3ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $8,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570234P,  Location: 3.65 MILES NORTH OF MS RO (Lat: 34.469083,  Lng: -88.437000),  Route carried "on" structure: Federal lands road 1,  Year Built: 1981,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 810 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 891 (year 2031),  Design Load: H 15,  Features Intersected: BIG BROWN CREEK,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 460.031,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $60,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $90,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570235P,  Location: 3.74 MILES NORTH OF MS RO (Lat: 34.469194,  Lng: -88.433528),  Route carried "on" structure: Federal lands road 1,  Year Built: 1981,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 810 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 891 (year 2031),  Design Load: H 15,  Features Intersected: RELIEF,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 460.176,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $15,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570236P,  Location: 4.06 MILES NORTH OF MS RO (Lat: 34.469472,  Lng: -88.430167),  Route carried "on" structure: Federal lands road 1,  Year Built: 1981,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 810 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 891 (year 2031),  Design Load: H 15,  Features Intersected: BIG BROWN SLOUGH,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 460.691,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $15,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570237P,  Location: 4.18 MILES NORTH OF MS RO (Lat: 34.469972,  Lng: -88.427861),  Route carried "on" structure: Federal lands road 1,  Year Built: 1981,  Status: Open,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 810 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 891 (year 2031),  Design Load: H 15,  Features Intersected: RELIEF,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 460.884,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.6m (77.4ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $30,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570238P,  Location: 4.37 MILES NORTH OF MS RO (Lat: 34.470611,  Lng: -88.424806),  Route carried "on" structure: Federal lands road 1,  Year Built: 1981,  Status: Open,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 810 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 891 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE BROWN CREEK,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 461.190,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.6m (77.4ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $105,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570239P,  Location: 4.47 MILES NORTH OF MS RO (Lat: 34.470861,  Lng: -88.422778),  Route carried "on" structure: Federal lands road 1,  Year Built: 1981,  Status: Open,  Structure Length: 3.70m (12.14ft),  Average Daily Traffic: 810 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 891 (year 2031),  Design Load: H 15,  Features Intersected: COUNTY ROAD,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 461.351,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.8m (48.6ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $30,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570240P,  Location: 4.7 MILES NORTH OF MS ROU (Lat: 34.472556,  Lng: -88.415556),  Route carried "on" structure: Federal lands road 1,  Year Built: 1981,  Status: Open,  Structure Length: 3.43m (11.25ft),  Average Daily Traffic: 810 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 891 (year 2031),  Design Load: H 15,  Features Intersected: COUNTY ROAD,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 461.721,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.6m (44.6ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $23,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA2900000000004,  Location: SEC 28 T 7S R 8E B (Lat: 34.443611,  Lng: -88.470278),  Route carried "on" structure: County highway 1013,  Year Built: 2004,  Status: Open,  Structure Length: 6.81m (22.34ft),  Average Daily Traffic: 440 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 660 (year 2035),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: DONIVAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.126,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 65.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000093,  Location: SEC 24 T 6S R 7E (Lat: 34.541694,  Lng: -88.520500),  Route carried "on" structure: County highway 138,  Year Built: 1983,  Status: Posted for load,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 30 (year 2015),  Average Future Daily Traffic: 45 (year 2035),  Design Load: H 15,  Features Intersected: CASEY CREEK,  Facility Carried by Structure: CR 5251
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.0m (13.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 6.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Critical Feature Inspection Date: January 2022,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $127,000 ( Estimate for 2016),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: SA5900000000095,  Location: SEC 25 T 6S R 7E (Lat: 34.527361,  Lng: -88.511639),  Route carried "on" structure: County highway 137,  Year Built: 2011,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 70 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 105 (year 2035),  Design Load: HL 93,  Features Intersected: CASEY CREEK,  Facility Carried by Structure: CR 5300
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000098,  Location: SEC 35 T 6S R 7E (Lat: 34.516431,  Lng: -88.529367),  Route carried "on" structure: County highway 157,  Year Built: 2006,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 140 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 210 (year 2036),  Design Load: HS 20,  Features Intersected: PLUMORCHARD CREEK,  Facility Carried by Structure: COUNTY ROAD 5334
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: SA5900000000104,  Location: SEC 16 T 6S R 8E (Lat: 34.564533,  Lng: -88.457500),  Route carried "on" structure: County highway 131,  Year Built: 2010,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 40 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 60 (year 2035),  Design Load: HS 20,  Features Intersected: YOUNGS CREEK,  Facility Carried by Structure: CR 3255
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.482,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000105,  Location: SEC 20 T 6S R 8E (Lat: 34.539861,  Lng: -88.484556),  Route carried "on" structure: County highway 137,  Year Built: 2004,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 60 (year 2016),  Average Future Daily Traffic: 90 (year 2036),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: COUNTY ROAD 5310
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 84.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000106,  Location: SEC 21 T 6S R 8E B (Lat: 34.545281,  Lng: -88.468764),  Route carried "on" structure: County highway 5260,  Year Built: 1989,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 160 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 240 (year 2035),  Design Load: HS 20,  Features Intersected: LITTLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.482,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 63.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $230,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000109,  Location: SEC 29 T 6S R 8E (Lat: 34.529383,  Lng: -88.475700),  Route carried "on" structure: County highway 140,  Year Built: 1997,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 115 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 173 (year 2036),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: CR 5320
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA590000000011,  Location: SEC 34 T 6S R 8E B (Lat: 34.508700,  Lng: -88.439167),  Route carried "on" structure: County highway 960,  Year Built: 1960,  Status: Posted for load,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 210 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 315 (year 2035),  Design Load: H 15,  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: CR 4050
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.896,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 15.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 9.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $359,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA5900000000111,  Location: SEC 34 T 6S R 8E B (Lat: 34.519417,  Lng: -88.445350),  Route carried "on" structure: County highway 133,  Year Built: 2000,  Status: Open,  Structure Length: 4.87m (15.98ft),  Average Daily Traffic: 50 (year 2016),  Average Future Daily Traffic: 75 (year 2021),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: COUNTY ROAD 4001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 84.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000112,  Location: SEC 35 T 6S R 8E B (Lat: 34.508633,  Lng: -88.436483),  Route carried "on" structure: County highway 960,  Year Built: 1993,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 360 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 315 (year 2036),  Design Load: HS 20,  Features Intersected: BROWN CREEK,  Facility Carried by Structure: COUNTY ROAD 4050
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.218,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000113,  Location: SEC 35 T 6S R 8E B (Lat: 34.508983,  Lng: -88.434650),  Route carried "on" structure: County highway 960,  Year Built: 1965,  Status: Posted for load,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 210 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 315 (year 2035),  Design Load: H 15,  Features Intersected: BROWN CREEK,  Facility Carried by Structure: CR 4050
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.379,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $359,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA5900000000114,  Location: SEC 35 T 6S R 8E B (Lat: 34.508900,  Lng: -88.432233),  Route carried "on" structure: County highway 960,  Year Built: 1955,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 310 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 465 (year 2035),  Design Load: H 10,  Features Intersected: BROWN CREEK,  Facility Carried by Structure: CR 4050
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.540,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 16.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $314,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA5900000000115,  Location: SEC 35 T 6S R 8E B (Lat: 34.508983,  Lng: -88.430317),  Route carried "on" structure: County highway 960,  Year Built: 1957,  Status: Closed,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 310 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 465 (year 2035),  Design Load: H 15,  Features Intersected: BROWN CREEK,  Facility Carried by Structure: CR 4050
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Good,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $359,000 ( Estimate for 2016),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA5900000000116,  Location: SEC 36 T 6S R 8E (Lat: 34.516258,  Lng: -88.412847),  Route carried "on" structure: County highway 11,  Year Built: 2004,  Status: Posted for load,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 20 (year 2015),  Average Future Daily Traffic: 30 (year 2035),  Design Load: H 10,  Features Intersected: LITTLE BROWN CREEK,  Facility Carried by Structure: CR 4140
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.482,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.9m (12.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $175,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: SA5900000000117,  Location: SEC 36 T 6S R 8E (Lat: 34.516150,  Lng: -88.407367),  Route carried "on" structure: County highway 11,  Year Built: 1955,  Status: Posted for load,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 20 (year 2015),  Average Future Daily Traffic: 30 (year 2035),  Design Load: H 10,  Features Intersected: WESSON CREEK,  Facility Carried by Structure: CR 4140
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.8m (22.3ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 26.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $156,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: SA5900000000125,  Location: SEC 12 T 7S R 7E B (Lat: 34.491950,  Lng: -88.520117),  Route carried "on" structure: County highway 347,  Year Built: 1984,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 130 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 195 (year 2036),  Design Load: HS 15,  Features Intersected: DONIVAN CREEK,  Facility Carried by Structure: COUNTY ROAD 5450
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.48m (17.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $328,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $406,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000126,  Location: SEC 1 T 7S R 8E B (Lat: 34.506150,  Lng: -88.418350),  Route carried "on" structure: County highway 960,  Year Built: 1972,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 360 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 540 (year 2036),  Design Load: HS 15,  Features Intersected: LITTLE BROWN CREEK,  Facility Carried by Structure: COUNTY ROAD 4101
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.988,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $359,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000128,  Location: SEC 1 T 7S R 8E B (Lat: 34.501367,  Lng: -88.417133),  Route carried "on" structure: County highway 960,  Year Built: 1972,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 360 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 540 (year 2036),  Design Load: HS 15,  Features Intersected: LITTLE BROWN CREEK,  Facility Carried by Structure: COUNTY ROAD 4101
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.276,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $314,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA5900000000129,  Location: SEC 3 T 7S R 8E (Lat: 34.501000,  Lng: -88.445250),  Route carried "on" structure: County highway 133,  Year Built: 1970,  Status: Posted for load,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 140 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 210 (year 2035),  Design Load: H 10,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: CR 4001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.023,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.9m (12.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.2m (20.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 23.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $103,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $126,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA5900000000135,  Location: SEC 15 T 7S R 8E (Lat: 34.475333,  Lng: -88.445250),  Route carried "on" structure: County highway 133,  Year Built: 1972,  Status: Posted for load,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 80 (year 2015),  Average Future Daily Traffic: 120 (year 2035),  Design Load: H 10,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: CR 4001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.126,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.3m (27.2ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 8.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $156,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: SA5900000000147,  Location: SEC 19 T 6S R 8E (Lat: 34.550861,  Lng: -88.489258),  Route carried "on" structure: County highway 5250,  Year Built: 1950,  Status: Posted for load,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 40 (year 2015),  Average Future Daily Traffic: 60 (year 2035),  Design Load: H 10,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.6m (11.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 15.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $269,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Discuss Marietta, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.