Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Muncy, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 60Number of bridges
  • 640ft / 195mTotal length
  • $8,850,000Total costs
  • 341,375Total average daily traffic
  • 50,005Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Muncy
  • No street view available for this location

New bridges in Muncy, PA - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 11910-1919
  • 21920-1929
  • 21930-1939
  • 21950-1959
  • 21960-1969
  • 421970-1979
  • 11980-1989
  • 11990-1999
  • 22000-2009
  • 32010-2019
Reconstructed bridges in Muncy, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 101990-1999
  • 12000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Muncy, PA
Average Bridge Truck Traffic in Muncy, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 44.4%Good
  • 16.7%Satisfactory
  • 13.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 13.5%Very good
  • 37.8%Good
  • 35.1%Satisfactory
  • 10.8%Fair
  • 2.7%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 56.8%Good
  • 32.4%Satisfactory
  • 8.1%Fair
  • 2.7%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.3%Very good
  • 17.2%Good
  • 31.0%Satisfactory
  • 27.6%Fair
  • 13.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Very good
  • 60.0%Good
Find on map >>   Show street view

Structure Number: 46776,  Location: 1.9 MI. N. OF PENNSDALE (Lat: 41.269661,  Lng: -76.798228),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 154 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: CARPENTERS RUN,  Facility Carried by Structure: T-549 BUGBEE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 47209,  Location: 1 MI S OF PENNSDALE (Lat: 41.235139,  Lng: -76.793389),  Route carried "on" structure: State highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 621 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,127 (year 2032),  Design Load: HL 93,  Features Intersected: WOLF RUN,  Facility Carried by Structure: SR 2051
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.339,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54646,  Location: 2 MI SW OF MUNCY (Lat: 41.194661,  Lng: -76.824611),  Route carried "on" structure: State highway 405,  Year Built: 2017,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 3,968 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,429 (year 2037),  Design Load: HL 93,  Features Intersected: OVER TURKEY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.966,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019
Find on map >>   Show street view

Structure Number: 24659,  Location: HALLS STATION (Lat: 41.237781,  Lng: -76.809456),  Route carried "under" structure: State highway ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 4,769 (year 2022),  Truck Traffic: 5%,  Features Intersected: I 180 OVER SR 2036,  Facility Carried by Structure: SR-0180,
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.737,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 24659,  Location: HALLS STATION (Lat: 41.237781,  Lng: -76.809456),  Route carried "under" structure: State highway ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 4,769 (year 2022),  Truck Traffic: 5%,  Features Intersected: I 180 OVER SR 2036,  Facility Carried by Structure: SR-0180,
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.737,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 2466,  Location: HALLS STATION (Lat: 41.237917,  Lng: -76.809175),  Route carried "under" structure: US 220,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 4,081 (year 2022),  Truck Traffic: 7%,  Features Intersected: OVER SR 0220,  Facility Carried by Structure: SR-0180,WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.846,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 2466,  Location: HALLS STATION (Lat: 41.237917,  Lng: -76.809175),  Route carried "under" structure: US 220,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 4,081 (year 2022),  Truck Traffic: 7%,  Features Intersected: OVER SR 0220,  Facility Carried by Structure: SR-0180,WB
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 22.846,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 24668,  Location: 1 MI E OF MUNCY (Lat: 41.210756,  Lng: -76.770975),  Route carried "under" structure: State highway 405,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 14,203 (year 2021),  Truck Traffic: 11%,  Features Intersected: E.B. OVER S.R. 405,  Facility Carried by Structure: I 180 EB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 10.084,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 24669,  Location: 1 MI E OF MUNCY (Lat: 41.207278,  Lng: -76.769208),  Route carried "under" structure: State highway ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 3,179 (year 2021),  Truck Traffic: 1%,  Features Intersected: E.B. OVER S.R. 2044,  Facility Carried by Structure: I 180 EB
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 1.548,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 2467,  Location: 1 MI E OF MUNCY (Lat: 41.210861,  Lng: -76.770711),  Route carried "under" structure: State highway 405,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 14,203 (year 2021),  Truck Traffic: 11%,  Features Intersected: W.B. OVER S.R. 405,  Facility Carried by Structure: I 180 WB
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 10.084,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 24671,  Location: 1 MI E OF MUNCY (Lat: 41.207408,  Lng: -76.768931),  Route carried "under" structure: State highway ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 3,179 (year 2021),  Truck Traffic: 1%,  Features Intersected: W.B. OVER S.R. 2044,  Facility Carried by Structure: I 180 WB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 1.548,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 24672,  Location: 1 MI SE OF MUNCY (Lat: 41.201361,  Lng: -76.769075),  Route carried "under" structure: State highway ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 1,235 (year 2022),  Truck Traffic: 2%,  Features Intersected: E.B. OVER S.R. 2061,  Facility Carried by Structure: I 180 EB
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 1.230,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 24673,  Location: 1 MI SE OF MUNCY (Lat: 41.201353,  Lng: -76.768772),  Route carried "under" structure: State highway ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 1,235 (year 2022),  Truck Traffic: 2%,  Features Intersected: W.B. OVER S.R. 2061,  Facility Carried by Structure: I 180 WB
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 1.230,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 24675,  Location: .5 MI S OF MUNCY (Lat: 41.187631,  Lng: -76.785247),  Route carried "under" structure: State highway ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 1,763 (year 2021),  Truck Traffic: 7%,  Features Intersected: E.B. OVER S.R. 2014,  Facility Carried by Structure: SR 0180
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 30.825,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 24676,  Location: .5 MI S OF MUNCY (Lat: 41.187319,  Lng: -76.785294),  Route carried "under" structure: State highway ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 1,763 (year 2021),  Truck Traffic: 7%,  Features Intersected: W.B. OVER S.R. 2014,  Facility Carried by Structure: SR 0180
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 30.825,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 24927,  Location: LYCOMING MALL INTERCHANGE (Lat: 41.246294,  Lng: -76.832931),  Route carried "under" structure: Interstate 180,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 13,487 (year 2021),  Truck Traffic: 14%,  Features Intersected: OVER I-180 & RAMP B,  Facility Carried by Structure: SR2049
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 19.090,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 24927,  Location: LYCOMING MALL INTERCHANGE (Lat: 41.246294,  Lng: -76.832931),  Route carried "under" structure: Interstate 180,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 11,385 (year 2021),  Truck Traffic: 14%,  Features Intersected: OVER I-180 & RAMP B,  Facility Carried by Structure: SR2049
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 19.143,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 24931,  Location: 1 MI N OF MUNCY (Lat: 41.222053,  Lng: -76.787011),  Route carried "under" structure: Interstate 180,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 9,440 (year 2021),  Truck Traffic: 20%,  Features Intersected: OVER LR 1073 (I-180),  Facility Carried by Structure: S.R.2053
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 23.937,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 24931,  Location: 1 MI N OF MUNCY (Lat: 41.222053,  Lng: -76.787011),  Route carried "under" structure: Interstate 180,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 9,624 (year 2021),  Truck Traffic: 17%,  Features Intersected: OVER LR 1073 (I-180),  Facility Carried by Structure: S.R.2053
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 23.939,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 29064,  Location: 2.5 MI.SOUTH OF MUNCY (Lat: 41.162283,  Lng: -76.793519),  Route carried "under" structure: Interstate 180,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 8,967 (year 2021),  Truck Traffic: 24%,  Features Intersected: 1045 OVER I-180 EB & WB,  Facility Carried by Structure: T-666
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 1.365,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 29064,  Location: 2.5 MI.SOUTH OF MUNCY (Lat: 41.162283,  Lng: -76.793519),  Route carried "under" structure: Interstate 180,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 8,837 (year 2021),  Truck Traffic: 18%,  Features Intersected: 1045 OVER I-180 EB & WB,  Facility Carried by Structure: T-666
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 1.408,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Discuss Muncy, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.