Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Powder Springs, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 44Number of bridges
  • 502ft / 153mTotal length
  • $52,483,000Total costs
  • 451,269Total average daily traffic
  • 7,169Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Powder Springs
  • No street view available for this location

New bridges in Powder Springs, GA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 21950-1959
  • 21960-1969
  • 41970-1979
  • 71980-1989
  • 141990-1999
  • 72000-2009
  • 32010-2019
Reconstructed bridges in Powder Springs, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 41990-1999
Average Bridge Daily Traffic in Powder Springs, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 83.3%Good
  • 6.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Very good
  • 46.7%Good
  • 3.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.7%Very good
  • 90.0%Good
  • 3.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Excellent
  • 27.8%Very good
  • 38.9%Good
  • 19.4%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 670188,  Location: 1.6 MI E OF PAULDING CL (Lat: 33.865069,  Lng: -84.696969),  Route carried "under" structure: County highway 4516,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 6 (US 278),  Facility Carried by Structure: US 278 / SR 6
Minimum Vertical Clearance: 9.24m (30.31ft),  Kilometerpoint: 3.219,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 67525,  Location: 1 MILE WEST OF POWDER SPR (Lat: 33.868800,  Lng: -84.696839),  Route carried "under" structure: US 278,  Structure Length: 0. m,  Average Daily Traffic: 33,920 (year 2012),  Truck Traffic: 1%,  Features Intersected: US 278 / SR 6,  Facility Carried by Structure: SILVER COMET TRAIL
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 3.219,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 675293,  Location: 3.2 MILES WEST OF POWDER (Lat: 33.865586,  Lng: -84.685319),  Route carried "under" structure: County highway 924,  Structure Length: 0. m,  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Features Intersected: OLD LOST MOUNTAIN ROAD,  Facility Carried by Structure: SILVER COMET TRAIL
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 1.609,  Length of Maximum Span: 0.0m

Discuss Powder Springs, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.