Bridge Statistics for Amherst, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 139Number of bridges
  • 1,385ft / 422mTotal length
  • $423,836,000Total costs
  • 2,821,263Total average daily traffic
  • 109,105Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Amherst
  • No street view available for this location

New bridges in Amherst, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 201950-1959
  • 201960-1969
  • 81970-1979
  • 671980-1989
  • 131990-1999
  • 52000-2009
  • 32010-2019
Reconstructed bridges in Amherst, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 11970-1979
  • 31980-1989
  • 41990-1999
  • 62000-2009
  • 52010-2019
  • 22020-2022
Average Bridge Daily Traffic in Amherst, NY
Average Bridge Truck Traffic in Amherst, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.6%Excellent
  • 14.5%Very good
  • 43.4%Good
  • 27.6%Satisfactory
  • 6.6%Fair
  • 5.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.9%Excellent
  • 28.9%Very good
  • 44.7%Good
  • 9.2%Satisfactory
  • 7.9%Fair
  • 5.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.9%Excellent
  • 15.8%Very good
  • 40.8%Good
  • 19.7%Satisfactory
  • 15.8%Fair
  • 3.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Excellent
  • 41.7%Very good
  • 35.4%Good
  • 12.5%Satisfactory
  • 2.1%Fair
  • 2.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.1%Very good
  • 36.4%Good
  • 27.3%Satisfactory
  • 27.3%Fair
Find on map >>   Show street view

Structure Number: 10728,  Location: .1 MI EAST JCT SH356&US62 (Lat: 43.024619,  Lng: -78.819153),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Posted for load,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 900 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 950 (year 2040),  Design Load: HS 20,  Features Intersected: N DIVERSION CHNEL,  Facility Carried by Structure: N ELLICOTT CRK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $1,320,000,  Roadway Improvement Cost: $773,000,  Total Project Cost: $2,092,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1072811,  Location: JCT.990I + AUDUBON PARKWY (Lat: 43.025842,  Lng: -78.767828),  Route carried "on" structure: Interstate 990,  Year Built: 1984,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 19,759 (year 2014),  Truck Traffic: 13%,  Design Load: HS 20,  Features Intersected: RTE 270
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.841,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,223,000,  Roadway Improvement Cost: $1,302,000,  Total Project Cost: $3,525,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1072812,  Location: JCT.990I + AUDUBON PARKWY (Lat: 43.025500,  Lng: -78.767828),  Route carried "on" structure: Interstate 990,  Year Built: 1984,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 15,025 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 16,838 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 270
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.211,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,223,000,  Roadway Improvement Cost: $1,302,000,  Total Project Cost: $3,525,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107348,  Location: 0.6MI NE JCT.290I & 263 (Lat: 42.991303,  Lng: -78.788608),  Route carried "on" structure: State highway 263,  Year Built: 1987,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 15,238 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,309 (year 2040),  Design Load: HS 20,  Features Intersected: CR192 - MAPLE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.749,  Lanes on structure: 5,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.3m (115.8ft),  Curb-To-Curb Width: 27.2m (89.2ft),  Out-to-Out Width: 28.9m (94.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.68m (12.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $4,089,000,  Roadway Improvement Cost: $2,395,000,  Total Project Cost: $6,484,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1074391,  Location: 0.6MI W RT263 & COUNTY299 (Lat: 43.034806,  Lng: -78.760142),  Route carried "on" structure: Interstate 990,  Year Built: 1990,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 19,759 (year 2015),  Truck Traffic: 13%,  Design Load: HS 20,  Features Intersected: CR299-N FRENCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.176,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,843,000,  Roadway Improvement Cost: $1,665,000,  Total Project Cost: $4,508,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1074392,  Location: 0.6MI W RT263 & COUNTY299 (Lat: 43.034806,  Lng: -78.759675),  Route carried "on" structure: Interstate 990,  Year Built: 1990,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 15,025 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,838 (year 2040),  Design Load: HS 20,  Features Intersected: CR299-N FRENCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.562,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,843,000,  Roadway Improvement Cost: $1,665,000,  Total Project Cost: $4,508,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10744,  Location: .3 MI NW JCT SH263 & CR87 (Lat: 43.047489,  Lng: -78.741536),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 874 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,224 (year 2039),  Design Load: HS 20,  Features Intersected: 990I990I53011053, RTE I9,  Facility Carried by Structure: CR87 HOPKINS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.900,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.98m (26.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,347,000,  Roadway Improvement Cost: $1,960,000,  Total Project Cost: $5,307,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221284,  Location: 1.5 MI SW OF GETZVILLE (Lat: 43.006447,  Lng: -78.779961),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,352 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,293 (year 2039),  Features Intersected: S BR ELLICOTT CRK,  Facility Carried by Structure: FRONTIER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 60.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $859,000,  Roadway Improvement Cost: $503,000,  Total Project Cost: $1,362,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221285,  Location: .5 MI NE OF BUF INT AIRPT (Lat: 42.945822,  Lng: -78.724697),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 13,225 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,965 (year 2040),  Design Load: HS 20,  Features Intersected: ELLICOTT CREEK,  Facility Carried by Structure: YOUNGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,722,000,  Roadway Improvement Cost: $1,009,000,  Total Project Cost: $2,731,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221299,  Location: .6 MI NE OF BUF INT AIRPT (Lat: 42.947281,  Lng: -78.724731),  Route carried "on" structure: County highway ,  Year Built: 1946,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 13,225 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,965 (year 2040),  Features Intersected: BR ELLICOTT CREEK,  Facility Carried by Structure: YOUNGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $235,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $373,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2266621,  Location: 1.7 MI N JCT I290 & SH263 (Lat: 43.008506,  Lng: -78.780528),  Route carried "on" structure: Other road ,  Year Built: 1983,  Year Reconstructed: 2020,  Status: Posted for load-capacity,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 2,782 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,937 (year 2040),  Design Load: HS 20,  Features Intersected: Amherst Bike/ Ped Trail,,  Facility Carried by Structure: JJ AUDUBON PARKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.687,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.0m (78.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.15m (20.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,762,000,  Roadway Improvement Cost: $1,617,000,  Total Project Cost: $4,379,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226721,  Location: 0.7 W RT78 1.0 SE RT 263 (Lat: 43.043925,  Lng: -78.711581),  Route carried "on" structure: Other road ,  Year Built: 1973,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 680 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 952 (year 2039),  Design Load: H 20,  Features Intersected: RANSOM CREEK,  Facility Carried by Structure: GLEN OAKS DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $516,000,  Roadway Improvement Cost: $302,000,  Total Project Cost: $818,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 226806,  Location: SOUTH END OF AMHERST (Lat: 43.018289,  Lng: -78.724925),  Route carried "on" structure: Other road ,  Year Built: 1986,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 5,511 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,818 (year 2040),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH26B,  Facility Carried by Structure: YOUNGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.808,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $334,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226807,  Location: 2.6 MI NW OF RTE 78 &324 (Lat: 43.017956,  Lng: -78.724633),  Route carried "on" structure: Other road ,  Year Built: 1986,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 530 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 742 (year 2037),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH26B,  Facility Carried by Structure: BUTTONWOOD LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $158,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $251,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226808,  Location: 2.2 MI NW MAPLE & 78 (Lat: 43.013106,  Lng: -78.724778),  Route carried "on" structure: Other road ,  Year Built: 1986,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 1,181 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,653 (year 2037),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH26B,  Facility Carried by Structure: STONEWOOD DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 73.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $228,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226809,  Location: NE 0F KLEIN & YOUNGS (Lat: 43.003522,  Lng: -78.722389),  Route carried "on" structure: Other road ,  Year Built: 2010,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 937 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,312 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: DRAINAGE DITCH26B,  Facility Carried by Structure: CHAPEL WOODS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Channel: Good,  Culverts: Good,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $465,000,  Roadway Improvement Cost: $272,000,  Total Project Cost: $737,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 226815,  Location: 0.4 MI. NORTH OF KLEIN RD (Lat: 43.002547,  Lng: -78.718775),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 650 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 910 (year 2037),  Features Intersected: DRAINAGE DITCH26B,  Facility Carried by Structure: KNOLLWOOD LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $257,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $407,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227055,  Location: 0.1 mile west of New Road (Lat: 43.040811,  Lng: -78.727678),  Route carried "on" structure: Other road ,  Year Built: 2009,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 599 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 839 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Ditch 26B,  Facility Carried by Structure: Rambling Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $275,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 232675,  Location: 2.3 MI NE JCT 356&62 (Lat: 43.034422,  Lng: -78.814214),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,148 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,607 (year 2037),  Design Load: HS 20,  Features Intersected: BR ELLICOTT CREEK,  Facility Carried by Structure: NORTH FRENCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $521,000,  Roadway Improvement Cost: $305,000,  Total Project Cost: $826,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 332623,  Location: 2.8 MI W JCT RT 78 +236 (Lat: 43.068975,  Lng: -78.753389),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 916 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,282 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: TONAWANDA CR TRIB,  Facility Carried by Structure: TONAWANDA CRK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.466,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $531,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $842,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332624,  Location: 2.8 MI SW JCT SH78 &SH263 (Lat: 43.068964,  Lng: -78.749706),  Route carried "on" structure: County highway ,  Year Built: 1985,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 916 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,282 (year 2040),  Design Load: HS 20,  Features Intersected: RANSOM CREEK,  Facility Carried by Structure: TONAWANDA CK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.723,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $1,794,000,  Roadway Improvement Cost: $1,051,000,  Total Project Cost: $2,845,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33263,  Location: 3 MI SW JCT SH78 & SH263 (Lat: 43.052183,  Lng: -78.739794),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 430 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 602 (year 2040),  Design Load: HS 20,  Features Intersected: RANSOM CREEK,  Facility Carried by Structure: HOPKINS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.592,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $765,000,  Roadway Improvement Cost: $448,000,  Total Project Cost: $1,212,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332633,  Location: 4.3 MI NW OF CLARENCE CEN (Lat: 43.038989,  Lng: -78.711225),  Route carried "on" structure: County highway ,  Year Built: 1983,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 1,061 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,485 (year 2037),  Design Load: HS 20,  Features Intersected: RANSOM CREEK,  Facility Carried by Structure: DODGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.109,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $695,000,  Roadway Improvement Cost: $407,000,  Total Project Cost: $1,102,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 332636,  Location: JCT CO RD 186 & CO RD 297 (Lat: 43.053000,  Lng: -78.724556),  Route carried "on" structure: County highway ,  Year Built: 1929,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 3,208 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,969 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RANSOM CREEK,  Facility Carried by Structure: NEW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.818,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $709,000,  Roadway Improvement Cost: $415,000,  Total Project Cost: $1,124,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332637,  Location: 1.5 MI W JCT SH78&TWDA CK (Lat: 43.086219,  Lng: -78.727644),  Route carried "on" structure: County highway ,  Year Built: 1936,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 3,212 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,974 (year 2040),  Design Load: HS 20,  Features Intersected: TONAWANDA CREEK,  Facility Carried by Structure: NEW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.551,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Good,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,188,000,  Roadway Improvement Cost: $1,281,000,  Total Project Cost: $3,469,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332638,  Location: .3 MI W JCT SH263&MAPL RD (Lat: 42.991131,  Lng: -78.793656),  Route carried "on" structure: County highway ,  Year Built: 1962,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 17,437 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,518 (year 2040),  Features Intersected: BIZER CREEK,  Facility Carried by Structure: MAPLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.365,  Lanes on structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 66.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $690,000,  Roadway Improvement Cost: $404,000,  Total Project Cost: $1,094,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332639,  Location: 1.3 MI SE JCT SH263&EL CK (Lat: 42.991081,  Lng: -78.761886),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 17,688 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,771 (year 2040),  Features Intersected: ELLICOTT CREEK,  Facility Carried by Structure: COUNTY ROAD 192
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.956,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.9m (58.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 24.6m (80.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.62m (11.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,968,000,  Roadway Improvement Cost: $1,738,000,  Total Project Cost: $4,707,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332671,  Location: .3 MI N JCT SH324 & EL CK (Lat: 42.982461,  Lng: -78.765022),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 9,652 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,192 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ELLICOTT CREEK,  Facility Carried by Structure: NORTH FOREST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.3m (122.4ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,342,000,  Roadway Improvement Cost: $1,372,000,  Total Project Cost: $3,714,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332672,  Location: .2 MILE W OF EAST AMHERST (Lat: 43.023192,  Lng: -78.701022),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 5,921 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,326 (year 2040),  Design Load: HS 20,  Features Intersected: GOTT CREEK,  Facility Carried by Structure: CASEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.041,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $916,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 332673,  Location: 1.3 MILES N OF SWORMVILLE (Lat: 43.057914,  Lng: -78.700897),  Route carried "on" structure: Other road ,  Year Built: 1960,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 566 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 792 (year 2040),  Features Intersected: BLACK CREEK,  Facility Carried by Structure: DANN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $816,000,  Roadway Improvement Cost: $478,000,  Total Project Cost: $1,294,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332674,  Location: 1.1 MI NW OF SWORMVILLE (Lat: 43.050244,  Lng: -78.711611),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 2,614 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,234 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: SMITH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.397,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $664,000,  Roadway Improvement Cost: $389,000,  Total Project Cost: $1,053,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332676,  Location: .6 MILE SW OF SWORMVILLE (Lat: 43.034328,  Lng: -78.707586),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Posted for load-capacity,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 13,764 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,828 (year 2040),  Design Load: HS 20,  Features Intersected: GOTT CREEK,  Facility Carried by Structure: N FRENCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.702,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 84.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $956,000,  Roadway Improvement Cost: $560,000,  Total Project Cost: $1,516,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332677,  Location: 0.2 MI N RTE 990 OVERPASS (Lat: 43.021647,  Lng: -78.799031),  Route carried "on" structure: State highway 952T,  Year Built: 1985,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 15,111 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,957 (year 2040),  Design Load: HS 20,  Features Intersected: ELLICOTT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.540,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $4,112,000,  Roadway Improvement Cost: $2,408,000,  Total Project Cost: $6,521,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336709,  Location: 1.6 MI WEST OF GETZVILLE (Lat: 43.024583,  Lng: -78.799069),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 12,346 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,037 (year 2040),  Design Load: HS 20,  Features Intersected: DIVERSION CHANNEL,  Facility Carried by Structure: SWEET HOME ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,804,000,  Roadway Improvement Cost: $2,228,000,  Total Project Cost: $6,032,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336797,  Location: 1 MI NE JCT SH356 & US62 (Lat: 43.035842,  Lng: -78.813103),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 12,798 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,858 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TRIB ELLICOTT CRK,  Facility Carried by Structure: EAST ROBINSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.078,  Lanes on structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 3.3m (10.8ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 29.3m (96.1ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 78.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $665,000,  Roadway Improvement Cost: $390,000,  Total Project Cost: $1,055,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 402851,  Location: JCT US 62 & BARGE CANAL (Lat: 43.051633,  Lng: -78.826783),  Route carried "on" structure: US 62,  Year Built: 1988,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 24,913 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 25,030 (year 2040),  Design Load: HS 20,  Features Intersected: LOCKPRT AVE-CR 67, ERIE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.263,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 20.5m (67.3ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.90m (32.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $7,575,000,  Roadway Improvement Cost: $4,436,000,  Total Project Cost: $12,011,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 404405,  Location: JCT RTE 270 + BARGE CANAL (Lat: 43.069394,  Lng: -78.770781),  Route carried "on" structure: State highway 270,  Year Built: 2009,  Status: Open,  Structure Length: 9.51m (31.20ft),  Average Daily Traffic: 6,246 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,595 (year 2040),  Design Load: HL 93,  Features Intersected: ERIE CANAL, CANAL BIKE P
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Navigation Control: Yes ( Vertical Clearance: 5.7m (18.7ft), Horizontal Clearance: 31.1m (102.0ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 93.0m (305.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.50m (31.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $7,489,000,  Roadway Improvement Cost: $4,386,000,  Total Project Cost: $11,874,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing