Bridge Statistics for Amherst, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 139Number of bridges
  • 1,385ft / 422mTotal length
  • $423,836,000Total costs
  • 2,821,263Total average daily traffic
  • 109,105Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Amherst
  • No street view available for this location

New bridges in Amherst, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 201950-1959
  • 201960-1969
  • 81970-1979
  • 671980-1989
  • 131990-1999
  • 52000-2009
  • 32010-2019
Reconstructed bridges in Amherst, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 11970-1979
  • 31980-1989
  • 41990-1999
  • 62000-2009
  • 52010-2019
  • 22020-2022
Average Bridge Daily Traffic in Amherst, NY
Average Bridge Truck Traffic in Amherst, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.6%Excellent
  • 14.5%Very good
  • 43.4%Good
  • 27.6%Satisfactory
  • 6.6%Fair
  • 5.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.9%Excellent
  • 28.9%Very good
  • 44.7%Good
  • 9.2%Satisfactory
  • 7.9%Fair
  • 5.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.9%Excellent
  • 15.8%Very good
  • 40.8%Good
  • 19.7%Satisfactory
  • 15.8%Fair
  • 3.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Excellent
  • 41.7%Very good
  • 35.4%Good
  • 12.5%Satisfactory
  • 2.1%Fair
  • 2.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.1%Very good
  • 36.4%Good
  • 27.3%Satisfactory
  • 27.3%Fair
Find on map >>   Show street view

Structure Number: 445301,  Location: 1.5 MI W JCT 270+ BARGE C (Lat: 43.065994,  Lng: -78.797525),  Route carried "on" structure: County highway ,  Year Built: 1952,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 10.98m (36.02ft),  Average Daily Traffic: 4,521 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,329 (year 2039),  Design Load: HS 20,  Features Intersected: TONAWANDA CK ROAD, ERIE,  Facility Carried by Structure: BEAR RIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 50.6m (166.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 10.98m (36.02ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $3,791,000,  Roadway Improvement Cost: $2,220,000,  Total Project Cost: $6,012,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 551177,  Location: 3.1 MI W JCTOF RTS270<263 (Lat: 43.011725,  Lng: -78.790992),  Route carried "on" structure: State lands road ,  Year Built: 1976,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 3,445 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,823 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: BIZER CREEK,  Facility Carried by Structure: SKINNERSVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.2m (36.7ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,650,000,  Roadway Improvement Cost: $966,000,  Total Project Cost: $2,616,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5511791,  Location: 2.7 MI SW JCT SH270&SH263 (Lat: 43.006358,  Lng: -78.783294),  Route carried "on" structure: State lands road ,  Year Built: 1976,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 2,880 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,041 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LAKE LASALLE, PEDESTRIAN,  Facility Carried by Structure: J.J.AUDUBON PKWY.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.381,  Lanes on structure: 2,  Owner: State Agenciy,  Maintenance Responsibility: Private,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.2m (82.7ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,620,000,  Roadway Improvement Cost: $949,000,  Total Project Cost: $2,569,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 5511829,  Location: 2.8 MI N JCT I290(Lat: 43.000056,  Lng: -78.798042),  Route carried "on" structure: State lands road ,  Year Built: 1976,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 3,810 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,023 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BIZER CREEK,  Facility Carried by Structure: RENSCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 5,  Owner: State Agenciy,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 26.1m (85.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,613,000,  Roadway Improvement Cost: $1,530,000,  Total Project Cost: $4,143,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 551183,  Location: 2.1 MI N JCT I290(Lat: 42.996242,  Lng: -78.796842),  Route carried "on" structure: State lands road ,  Year Built: 1975,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 817 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,144 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: BIZER CREEK,  Facility Carried by Structure: SERVICE CENTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,093,000,  Roadway Improvement Cost: $640,000,  Total Project Cost: $1,733,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 551184,  Location: 1.8 MI N JCT I290(Lat: 42.992603,  Lng: -78.793683),  Route carried "on" structure: State lands road ,  Year Built: 1976,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 1,156 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,618 (year 2036),  Features Intersected: BIZER CREEK,  Facility Carried by Structure: SERVICE CENTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,948,000,  Roadway Improvement Cost: $1,141,000,  Total Project Cost: $3,089,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 5511929,  Location: 5.3 MI W JCT I90 < RTE 78 (Lat: 42.951064,  Lng: -78.737156),  Route carried "on" structure: Interstate 90,  Year Built: 1952,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 32,893 (year 2017),  Truck Traffic: 23%,  Average Future Daily Traffic: 36,863 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CR 290 WEHRLE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.103,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 33.4m (109.6ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $5,408,000,  Roadway Improvement Cost: $3,167,000,  Total Project Cost: $8,575,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5511949,  Location: 6.4 MI W JCT I90 < RTE 78 (Lat: 42.951936,  Lng: -78.744581),  Route carried "on" structure: Interstate 90,  Year Built: 1953,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 32,893 (year 2017),  Truck Traffic: 23%,  Average Future Daily Traffic: 36,863 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: S CAYUGA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.492,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 33.3m (109.3ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $5,303,000,  Roadway Improvement Cost: $3,105,000,  Total Project Cost: $8,408,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 551195,  Location: EXIT 50 OF I90 (Lat: 42.951350,  Lng: -78.759292),  Route carried "on" structure: Other road ,  Year Built: 1989,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 5,299 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,556 (year 2040),  Design Load: HS 20,  Features Intersected: 90IX WB, RTE I90,  Facility Carried by Structure: FOREST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.07m (26.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,606,000,  Roadway Improvement Cost: $2,112,000,  Total Project Cost: $5,718,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 551196,  Location: 1.5 MI SW JCT I90 & SH277 (Lat: 42.949886,  Lng: -78.762969),  Route carried "on" structure: Ramp Interstate 90IX,  Year Built: 1953,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 10.30m (33.79ft),  Average Daily Traffic: 26,603 (year 2015),  Truck Traffic: 15%,  Average Future Daily Traffic: 29,813 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX WB, RTE I90, 290IX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.949,  Lanes on structure: 2,  Lanes under structure: 10,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,938,000,  Roadway Improvement Cost: $2,306,000,  Total Project Cost: $6,244,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 551197,  Location: 1.4 MI SW JCT I90 & SH277 (Lat: 42.949792,  Lng: -78.762661),  Route carried "on" structure: Ramp Interstate 290,  Year Built: 1953,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 11,141 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 12,485 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE I90, 90IX EB RAMP TO
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 16.718,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.50m (27.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,413,000,  Roadway Improvement Cost: $1,999,000,  Total Project Cost: $5,411,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 551198,  Location: 1.5 MI SW JCT I90(Lat: 42.949581,  Lng: -78.762764),  Route carried "on" structure: County highway ,  Year Built: 1953,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 7,178 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,579 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE I90, 90IX EB TO 290I,  Facility Carried by Structure: WEHRLE DR CR 290
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 1.673,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.62m (28.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $6,059,000,  Roadway Improvement Cost: $3,548,000,  Total Project Cost: $9,608,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 551199,  Location: JCT I90 & I290 - EXIT 50 (Lat: 42.949617,  Lng: -78.766172),  Route carried "on" structure: Ramp Interstate 290,  Year Built: 1953,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 26,418 (year 2015),  Truck Traffic: 15%,  Average Future Daily Traffic: 29,606 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: WEHRLE DR CR 290
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,859,000,  Roadway Improvement Cost: $1,089,000,  Total Project Cost: $2,948,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1001639,  Location: JCT RTS 5 + I-290 (Lat: 42.959247,  Lng: -78.766681),  Route carried "under" structure: Interstate 290,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 123,659 (year 2002),  Features Intersected: 290I290I53011093, RTE I2,  Facility Carried by Structure: RTE 5
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 15.028,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 103029,  Location: JCT STATE HWYS 324 & 78 (Lat: 42.978194,  Lng: -78.696947),  Route carried "under" structure: State highway 78,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 29,922 (year 1999),  Features Intersected: RTE 78, TRANSIT ROAD,  Facility Carried by Structure: RTE 324
Minimum Vertical Clearance: 5.35m (17.55ft),  Kilometerpoint: 41.786,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 103029,  Location: JCT STATE HWYS 324 & 78 (Lat: 42.978194,  Lng: -78.696947),  Route carried "under" structure: Other road ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 29,922 (year 2021),  Features Intersected: RTE 78, TRANSIT ROAD,  Facility Carried by Structure: RTE 324
Minimum Vertical Clearance: 5.35m (17.55ft),  Kilometerpoint: 41.786,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 1043751,  Location: JCT RT 263 + I-290 (Lat: 42.984786,  Lng: -78.793942),  Route carried "under" structure: State highway 263,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 23,509 (year 2002),  Features Intersected: 263 263 53011018, RTE 2,  Facility Carried by Structure: RTE I290
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 2.896,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 1043752,  Location: JCT RT 263 + I-290 (Lat: 42.984614,  Lng: -78.794089),  Route carried "under" structure: State highway 263,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 23,509 (year 2002),  Features Intersected: 263 263 53011018, RTE 2,  Facility Carried by Structure: RTE I290
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 2.896,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 104434,  Location: JCT RT 277 + I-98 (Lat: 42.951958,  Lng: -78.754808),  Route carried "under" structure: Interstate 90,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 50,729 (year 2015),  Features Intersected: 90IX WB, RTE I90,  Facility Carried by Structure: RTE 277
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 675.603,  Lanes on structure: 4,  Lanes under structure: 3,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 104504,  Location: 0.5 MI W JCT RT 263 +I290 (Lat: 42.990869,  Lng: -78.799608),  Route carried "under" structure: Interstate 290,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 85,119 (year 1990),  Features Intersected: 290 290 53011064, RTE 2,  Facility Carried by Structure: MAPLE ROAD
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 10.426,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.5m (73.8ft)

Find on map >>   Show street view

Structure Number: 1045061,  Location: JCT RT 324 + I-290 (Lat: 42.978636,  Lng: -78.783197),  Route carried "under" structure: State highway 324,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 35,256 (year 2002),  Features Intersected: 324 324 53021151 EB, RT,  Facility Carried by Structure: RTE I290
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 24.280,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.6m (80.7ft)

Find on map >>   Show street view

Structure Number: 1045062,  Location: JCT RT 324 + I-290 (Lat: 42.978664,  Lng: -78.783681),  Route carried "under" structure: State highway 324,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 35,256 (year 2002),  Features Intersected: 324 324 53021151 EB, RT,  Facility Carried by Structure: RTE I290
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 24.280,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 104507,  Location: JCT I-290 + I-90 (Lat: 42.956833,  Lng: -78.766133),  Route carried "under" structure: Interstate 290,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 123,659 (year 2002),  Features Intersected: 290I290I53011095 WB, RTE
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 15.302,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 10717,  Location: 1 MI NE JCT SH 263 & I290 (Lat: 42.994744,  Lng: -78.787056),  Route carried "under" structure: State highway 263,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 20,231 (year 2002),  Features Intersected: 263 263 53011026, RTE 26
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 4.071,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.8m (120.7ft)

Find on map >>   Show street view

Structure Number: 107171,  Location: 1.2 MI NE JCT RT 263+I290 (Lat: 42.996175,  Lng: -78.785456),  Route carried "under" structure: State highway 263,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 20,231 (year 2002),  Features Intersected: 263 263 53011027, RTE 26
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 4.344,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 1071851,  Location: 1.0 MI NW JCT RT 263+290I (Lat: 42.997264,  Lng: -78.807553),  Route carried "under" structure: Ramp Interstate 990,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 15,150 (year 1986),  Features Intersected: RTE I990, RAMPYELN TO 99,  Facility Carried by Structure: RTE I290
Minimum Vertical Clearance: 5.53m (18.14ft),  Kilometerpoint: 0.628,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.2m (177.8ft)

Find on map >>   Show street view

Structure Number: 1071852,  Location: 1.0 MI NW JCT RT 263+290I (Lat: 42.996989,  Lng: -78.807564),  Route carried "under" structure: Ramp Interstate 990,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 15,150 (year 1986),  Features Intersected: RTE I990,  Facility Carried by Structure: RTE I290
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 0.628,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.2m (177.8ft)

Find on map >>   Show street view

Structure Number: 107186,  Location: 1 MI NW JCT SH 263 & I290 (Lat: 42.997464,  Lng: -78.808175),  Route carried "under" structure: Interstate 290,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 18,006 (year 2001),  Truck Traffic: 17%,  Features Intersected: 290I 290I53011058 WB, RT,  Facility Carried by Structure: RTE 990
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 9.397,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 72.8m (238.8ft)

Find on map >>   Show street view

Structure Number: 107186,  Location: 1 MI NW JCT SH 263 & I290 (Lat: 42.997464,  Lng: -78.808175),  Route carried "under" structure: Interstate ,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 15,150 (year 1986),  Features Intersected: 290I 290I53011058 WB, RT,  Facility Carried by Structure: RTE 990
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 72.8m (238.8ft)

Find on map >>   Show street view

Structure Number: 1071871,  Location: 1.5 MI N JCT RTS 290I+263 (Lat: 43.004433,  Lng: -78.803767),  Route carried "under" structure: Other road ,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 2,308 (year 2019),  Truck Traffic: 2%,  Features Intersected: CHESTNUT RIDGE RD,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 1.561,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.7m (100.7ft)

Find on map >>   Show street view

Structure Number: 1071872,  Location: 1.5 MI W JCT RTS 290I+263 (Lat: 43.004300,  Lng: -78.802803),  Route carried "under" structure: Other road ,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 2,308 (year 2019),  Truck Traffic: 2%,  Features Intersected: CHESTNUT RIDGE RD,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 1.689,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 107188,  Location: 1.7 MI N JCT I290 & SH263 (Lat: 43.007683,  Lng: -78.803742),  Route carried "under" structure: Interstate 990,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 40,641 (year 2002),  Features Intersected: RTE I990, 990I 990I53011
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 1.947,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 107188,  Location: 1.7 MI N JCT I290 & SH263 (Lat: 43.007683,  Lng: -78.803742),  Route carried "under" structure: Interstate ,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 30,300 (year 1986),  Features Intersected: RTE I990, 990I 990I53011,  Facility Carried by Structure: RTE 990
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 8.560,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 1072561,  Location: 1.2 MI E JCT 62 & I-290 (Lat: 43.006531,  Lng: -78.798833),  Route carried "under" structure: State highway 952T,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 15,198 (year 2002),  Features Intersected: 952T 952T53011011 NB, RT,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 3.121,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.5m (178.8ft)

Find on map >>   Show street view

Structure Number: 1072562,  Location: 1.2 MI E JCT 62 & I-290 (Lat: 43.006300,  Lng: -78.798828),  Route carried "under" structure: State highway 952T,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 15,198 (year 2002),  Features Intersected: 952T 952T53011011, RTE 9,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 3.121,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.8m (156.8ft)

Find on map >>   Show street view

Structure Number: 1072601,  Location: 1.7 MI NW INT RTS263+I290 (Lat: 42.993431,  Lng: -78.802553),  Route carried "under" structure: State highway 952T,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 15,198 (year 2002),  Features Intersected: RTE 952T,  Facility Carried by Structure: RTE I290
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 3.121,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.6m (139.8ft)

Find on map >>   Show street view

Structure Number: 1072602,  Location: 1.7 MI NW INT RTS263+I290 (Lat: 42.993242,  Lng: -78.802669),  Route carried "under" structure: State highway 952T,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 15,198 (year 2002),  Features Intersected: RTE 952T,  Facility Carried by Structure: RTE I290
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 3.121,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.6m (139.8ft)

Find on map >>   Show street view

Structure Number: 107261,  Location: 0.7 MI.S.JCT.RT.952T &356 (Lat: 43.012244,  Lng: -78.802944),  Route carried "under" structure: Interstate 990,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 41,518 (year 2002),  Features Intersected: 990I990I53011009 NB, RTE,  Facility Carried by Structure: WILLOWRIDGE PEDBR
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 2.671,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.2m (164.7ft)

Find on map >>   Show street view

Structure Number: 107261,  Location: 0.7 MI.S.JCT.RT.952T &356 (Lat: 43.012244,  Lng: -78.802944),  Route carried "under" structure: Interstate ,  Year Built: 1983,  Structure Length: 0. m,  Features Intersected: 990I990I53011009 NB, RTE,  Facility Carried by Structure: WILLOWRIDGE PEDBR
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 2.671,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.2m (164.7ft)

Find on map >>   Show street view

Structure Number: 1072631,  Location: 1.5 MI N INT I990 & I290 (Lat: 43.018306,  Lng: -78.799061),  Route carried "under" structure: State highway 952T,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 22,015 (year 1999),  Features Intersected: RTE 952T,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 3.121,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 56.3m (184.7ft)

Find on map >>   Show street view

Structure Number: 1072632,  Location: 1.5 MI N INT I990 & I290 (Lat: 43.017600,  Lng: -78.799056),  Route carried "under" structure: State highway 952T,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 22,015 (year 1999),  Features Intersected: RTE 952T,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 3.121,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.4m (194.9ft)

Find on map >>   Show street view

Structure Number: 1072651,  Location: 1.2 MI W JCT RTS 990I&270 (Lat: 43.023828,  Lng: -78.790431),  Route carried "under" structure: County highway ,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 2,020 (year 2020),  Truck Traffic: 4%,  Features Intersected: CR45-DODGE ROAD,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.0m (137.8ft)

Find on map >>   Show street view

Structure Number: 1072652,  Location: 1.1 MI W JCT RTS 990I&270 (Lat: 43.023783,  Lng: -78.789556),  Route carried "under" structure: County highway ,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 2,020 (year 2020),  Truck Traffic: 4%,  Features Intersected: CR45-DODGE ROAD,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.853,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.0m (137.8ft)

Find on map >>   Show street view

Structure Number: 1072661,  Location: 0.8 MI W JCT RTS 990I&270 (Lat: 43.025728,  Lng: -78.782386),  Route carried "under" structure: Other road ,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 1,919 (year 2020),  Truck Traffic: 1%,  Features Intersected: AUDUBON PARKWAY,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 1.609,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.2m (168.0ft)

Find on map >>   Show street view

Structure Number: 1072662,  Location: 0.8 MI W JCT RTS 990I&270 (Lat: 43.025425,  Lng: -78.782267),  Route carried "under" structure: Other road ,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 1,919 (year 2020),  Truck Traffic: 1%,  Features Intersected: AUDUBON PARKWAY,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 1.689,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.2m (168.0ft)

Find on map >>   Show street view

Structure Number: 1072811,  Location: JCT.990I + AUDUBON PARKWY (Lat: 43.025842,  Lng: -78.767828),  Route carried "under" structure: State highway 270,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 5,775 (year 2002),  Features Intersected: RTE 270,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 1.271,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 1072812,  Location: JCT.990I + AUDUBON PARKWY (Lat: 43.025500,  Lng: -78.767828),  Route carried "under" structure: State highway 270,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 5,775 (year 2002),  Features Intersected: RTE 270,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 1.271,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 107348,  Location: 0.6MI NE JCT.290I & 263 (Lat: 42.991303,  Lng: -78.788608),  Route carried "under" structure: County highway ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 17,437 (year 2018),  Truck Traffic: 2%,  Features Intersected: CR192 - MAPLE RD.,  Facility Carried by Structure: RTE 263
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 2.767,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.3m (115.8ft)

Find on map >>   Show street view

Structure Number: 1074391,  Location: 0.6MI W RT263 & COUNTY299 (Lat: 43.034806,  Lng: -78.760142),  Route carried "under" structure: County highway ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 9,234 (year 2019),  Truck Traffic: 3%,  Features Intersected: CR299-N FRENCH RD,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 5.535,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 1074392,  Location: 0.6MI W RT263 & COUNTY299 (Lat: 43.034806,  Lng: -78.759675),  Route carried "under" structure: County highway ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 9,234 (year 2019),  Truck Traffic: 3%,  Features Intersected: CR299-N FRENCH RD,  Facility Carried by Structure: RTE I990
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 6.227,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 10744,  Location: .3 MI NW JCT SH263 & CR87 (Lat: 43.047489,  Lng: -78.741536),  Route carried "under" structure: State highway 990,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 17,588 (year 2002),  Features Intersected: 990I990I53011053, RTE I9,  Facility Carried by Structure: CR87 HOPKINS RD
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 9.670,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 402851,  Location: JCT US 62 & BARGE CANAL (Lat: 43.051633,  Lng: -78.826783),  Route carried "under" structure: County highway ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 2,003 (year 2020),  Truck Traffic: 2%,  Features Intersected: LOCKPRT AVE-CR 67, ERIE,  Facility Carried by Structure: RTE 62
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.177,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 445301,  Location: 1.5 MI W JCT 270+ BARGE C (Lat: 43.065994,  Lng: -78.797525),  Route carried "under" structure: County highway ,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 1,390 (year 1977),  Features Intersected: TONAWANDA CK ROAD, ERIE,  Facility Carried by Structure: BEAR RIDGE ROAD
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.6m (166.0ft)

Find on map >>   Show street view

Structure Number: 55118,  Location: 3.1 MI SW JCT RTS 270<263 (Lat: 43.000342,  Lng: -78.785389),  Route carried "under" structure: State lands road ,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2021),  Features Intersected: PUTNAM WAY,  Facility Carried by Structure: PED OVERPASS
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 551181,  Location: 3.2 MI SW JCT RTS 270<263 (Lat: 43.001564,  Lng: -78.785678),  Route carried "under" structure: State lands road ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2021),  Features Intersected: PUTNAM WAY,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 5511929,  Location: 5.3 MI W JCT I90 < RTE 78 (Lat: 42.951064,  Lng: -78.737156),  Route carried "under" structure: County highway ,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 19,619 (year 2020),  Truck Traffic: 2%,  Features Intersected: CR 290 WEHRLE DR,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 3.781,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 5511949,  Location: 6.4 MI W JCT I90 < RTE 78 (Lat: 42.951936,  Lng: -78.744581),  Route carried "under" structure: County highway ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 4,138 (year 2020),  Truck Traffic: 1%,  Features Intersected: S CAYUGA RD,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.080,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 551195,  Location: EXIT 50 OF I90 (Lat: 42.951350,  Lng: -78.759292),  Route carried "under" structure: Interstate 90,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 21,000 (year 1977),  Features Intersected: 90IX WB, RTE I90,  Facility Carried by Structure: FOREST RD
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 675.973,  Lanes on structure: 2,  Lanes under structure: 3,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 551196,  Location: 1.5 MI SW JCT I90 & SH277 (Lat: 42.949886,  Lng: -78.762969),  Route carried "under" structure: Interstate 90,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 50,686 (year 2014),  Features Intersected: 90IX WB, RTE I90, 290IX
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 676.327,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 551196,  Location: 1.5 MI SW JCT I90 & SH277 (Lat: 42.949886,  Lng: -78.762969),  Route carried "under" structure: Interstate ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 4,630 (year 2013),  Truck Traffic: 1%,  Features Intersected: 90IX WB, RTE I90, 290IX,  Facility Carried by Structure: RTE 90IX
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 1.673,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 551197,  Location: 1.4 MI SW JCT I90 & SH277 (Lat: 42.949792,  Lng: -78.762661),  Route carried "under" structure: Interstate 90,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 124,506 (year 2010),  Features Intersected: RTE I90, 90IX EB RAMP TO
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 676.311,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 551197,  Location: 1.4 MI SW JCT I90 & SH277 (Lat: 42.949792,  Lng: -78.762661),  Route carried "under" structure: Other road ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 52,040 (year 2006),  Features Intersected: RTE I90, 90IX EB RAMP TO,  Facility Carried by Structure: RTE 290
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 551198,  Location: 1.5 MI SW JCT I90(Lat: 42.949581,  Lng: -78.762764),  Route carried "under" structure: Interstate 90,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 124,506 (year 2010),  Features Intersected: RTE I90, 90IX EB TO 290I
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 676.343,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 551198,  Location: 1.5 MI SW JCT I90(Lat: 42.949581,  Lng: -78.762764),  Route carried "under" structure: Ramp Interstate ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 52,040 (year 2006),  Features Intersected: RTE I90, 90IX EB TO 290I,  Facility Carried by Structure: WEHRLE DR CR 290
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 676.327,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 551199,  Location: JCT I90 & I290 - EXIT 50 (Lat: 42.949617,  Lng: -78.766172),  Route carried "under" structure: County highway ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 7,178 (year 2017),  Truck Traffic: 1%,  Features Intersected: WEHRLE DR CR 290,  Facility Carried by Structure: RTE I290
Minimum Vertical Clearance: 4.22m (13.85ft),  Kilometerpoint: 1.335,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Discuss Amherst, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.