Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Arlington Heights, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 54Number of bridges
  • 335ft / 102mTotal length
  • $3,739,000Total costs
  • 579,941Total average daily traffic
  • 101,252Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Arlington Heights
  • No street view available for this location

New bridges in Arlington Heights, PA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 81950-1959
  • 331960-1969
  • 11970-1979
  • 22000-2009
  • 62010-2019
Reconstructed bridges in Arlington Heights, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 81980-1989
  • 11990-1999
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in Arlington Heights, PA
Average Bridge Truck Traffic in Arlington Heights, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.2%Excellent
  • 19.4%Very good
  • 29.0%Good
  • 22.6%Satisfactory
  • 19.4%Fair
  • 6.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.0%Excellent
  • 15.2%Very good
  • 18.2%Good
  • 24.2%Satisfactory
  • 30.3%Fair
  • 6.1%Poor
  • 3.0%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.0%Excellent
  • 6.1%Very good
  • 15.2%Good
  • 24.2%Satisfactory
  • 42.4%Fair
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.5%Excellent
  • 9.1%Very good
  • 27.3%Good
  • 13.6%Satisfactory
  • 40.9%Fair
  • 4.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 26721,  Location: OVER SHAFERS SCHOOLHOUSE (Lat: 40.993461,  Lng: -75.255808),  Route carried "under" structure: State highway ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 1,791 (year 2021),  Truck Traffic: 4%,  Features Intersected: SR 2005(LR 45019),  Facility Carried by Structure: I-80 WB (LR1002)
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 2.393,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 11.9m (39.0ft)

Find on map >>   Show street view

Structure Number: 26722,  Location: 1.5 MI.E.OF PA.33 (Lat: 40.989222,  Lng: -75.243372),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1992),  Truck Traffic: 1%,  Features Intersected: TWP. RD 498*,  Facility Carried by Structure: I-80 EB (LR 1002)
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 10.4m (34.1ft)

Find on map >>   Show street view

Structure Number: 26724,  Location: 1.5 MI.E.OF PA.33 (Lat: 40.989514,  Lng: -75.243453),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1992),  Truck Traffic: 1%,  Features Intersected: TWP.RD 498,  Facility Carried by Structure: I-80 WB (LR 1002)
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 10.4m (34.1ft)

Find on map >>   Show street view

Structure Number: 26725,  Location: OVER SR 2009(BRIDGE ST) (Lat: 40.985386,  Lng: -75.225789),  Route carried "under" structure: State highway ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 12,556 (year 2021),  Truck Traffic: 2%,  Features Intersected: SR 2009,POCONO CR.,  Facility Carried by Structure: I-80 (LR1002)
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 26798,  Location: US209 OVER HICKORY VALLEY (Lat: 40.970011,  Lng: -75.258186),  Route carried "under" structure: State highway ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 546 (year 2022),  Truck Traffic: 7%,  Features Intersected: SR 2010(LR 45009),  Facility Carried by Structure: US 209(LR 164 ALT)
Minimum Vertical Clearance: 4.30m (14.11ft),  Kilometerpoint: 3.978,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.3m (37.1ft)

Find on map >>   Show street view

Structure Number: 26801,  Location: US209 OVER 209 BUS. (Lat: 40.982708,  Lng: -75.222128),  Route carried "under" structure: Business US 209B,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,872 (year 2020),  Truck Traffic: 4%,  Features Intersected: SR2012(US 209 BUSINESS),  Facility Carried by Structure: US 209(LR164 ALT.)
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 14.864,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 26867,  Location: OVER I-80 WB ON RAMP (Lat: 40.986675,  Lng: -75.231717),  Route carried "under" structure: Ramp State highway ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 1,404 (year 2021),  Truck Traffic: 7%,  Features Intersected: SR 8012 (LR 1002 RAMP B),  Facility Carried by Structure: PA 611 (LR 168)
Minimum Vertical Clearance: 4.33m (14.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 11.9m (39.0ft)

Find on map >>   Show street view

Structure Number: 26974,  Location: PA33 INTERCHANGE (Lat: 40.961372,  Lng: -75.284119),  Route carried "under" structure: State highway 33,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 10,116 (year 2020),  Truck Traffic: 18%,  Features Intersected: PA 33,  Facility Carried by Structure: US 209 BUS.(LR164)
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 9.040,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 26974,  Location: PA33 INTERCHANGE (Lat: 40.961372,  Lng: -75.284119),  Route carried "under" structure: State highway 33,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 9,505 (year 2020),  Truck Traffic: 17%,  Features Intersected: PA 33,  Facility Carried by Structure: US 209 BUS.(LR164)
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 8.964,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 27132,  Location: NINTH ST.EXIT 303(47) (Lat: 40.996667,  Lng: -75.271667),  Route carried "under" structure: Interstate 80,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 26,093 (year 2022),  Truck Traffic: 22%,  Features Intersected: I-80 (LR 1002)
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 35.056,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 27132,  Location: NINTH ST.EXIT 303(47) (Lat: 40.996667,  Lng: -75.271667),  Route carried "under" structure: Interstate 80,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 25,844 (year 2022),  Truck Traffic: 22%,  Features Intersected: I-80 (LR 1002)
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 34.846,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 27133,  Location: I80WB EX.302A(46A)TO209SB (Lat: 40.958333,  Lng: -75.283333),  Route carried "under" structure: Interstate 80,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 25,844 (year 2022),  Truck Traffic: 22%,  Features Intersected: I-80(LR 1002)
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 35.647,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 27133,  Location: I80WB EX.302A(46A)TO209SB (Lat: 40.958333,  Lng: -75.283333),  Route carried "under" structure: Interstate 80,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 26,093 (year 2022),  Truck Traffic: 22%,  Features Intersected: I-80(LR 1002)
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 35.863,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Discuss Arlington Heights, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.