Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Auburn, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 51Number of bridges
  • 915ft / 279mTotal length
  • $253,058,000Total costs
  • 1,818,391Total average daily traffic
  • 172,028Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Auburn
  • No street view available for this location

New bridges in Auburn, WA - historical statistics
  • New bridges - historical statistics
  • 71950-1959
  • 21960-1969
  • 221970-1979
  • 31980-1989
  • 41990-1999
  • 82000-2009
  • 52010-2019
Reconstructed bridges in Auburn, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Auburn, WA
Average Bridge Truck Traffic in Auburn, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.6%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 19.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.8%Very good
  • 66.7%Good
  • 19.4%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.6%Very good
  • 72.2%Good
  • 19.4%Satisfactory
  • 2.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 50.0%Good
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: OT,  Location: 1.1 E JCT SR 18 (Lat: 47.291944,  Lng: -122.208389),  Route carried "on" structure: State highway 164,  Year Built: 1970,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 32,879 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 46,425 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: R ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.398,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.91m (16.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,868,000,  Roadway Improvement Cost: $374,000,  Total Project Cost: $3,735,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4896A,  Location: 0.6 E JCT SR 167 (Lat: 47.303028,  Lng: -122.239750),  Route carried "on" structure: State highway 18,  Year Built: 1955,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 51,692 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 72,989 (year 2039),  Design Load: HS 20,  Features Intersected: CMSTPP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.617,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.53m (27.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,576,000,  Roadway Improvement Cost: $515,000,  Total Project Cost: $5,152,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5082A,  Location: 1.0 E JCT SR 167 (Lat: 47.303583,  Lng: -122.232944),  Route carried "on" structure: State highway 18,  Year Built: 1956,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 35.08m (115.09ft),  Average Daily Traffic: 84,324 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 119,065 (year 2039),  Design Load: HS 20,  Features Intersected: NPRY & CITY STREETS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.148,  Lanes on structure: 5,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 21.1m (69.2ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 35.08m (115.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $17,265,000,  Roadway Improvement Cost: $3,453,000,  Total Project Cost: $34,530,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5433B,  Location: 2.3 E JCT I-5 (Lat: 47.302947,  Lng: -122.256758),  Route carried "on" structure: State highway 18,  Year Built: 1957,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 106,469 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 150,334 (year 2039),  Design Load: HS 20,  Features Intersected: W VALLEY HWY(OLD SR 181)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.313,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,915,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $3,830,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5972A,  Location: 0.2 E JCT SR 164 (Lat: 47.303389,  Lng: -122.221583),  Route carried "on" structure: State highway 18,  Year Built: 1958,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 52,041 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 73,481 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: F ST SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.017,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.9m (85.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 24.9m (81.7ft),  Out-to-Out Width: 25.4m (83.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,148,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $2,297,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 6066A,  Location: 1.3 E JCT SR 167 (Lat: 47.302972,  Lng: -122.225833),  Route carried "on" structure: State highway 18,  Year Built: 1959,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 52,041 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 73,481 (year 2039),  Design Load: HS 20,  Features Intersected: SR 164
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.679,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 27.4m (89.9ft),  Out-to-Out Width: 28.7m (94.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,492,000,  Roadway Improvement Cost: $298,000,  Total Project Cost: $2,985,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8853A,  Location: 0.1 N JCT SR 18 (Lat: 47.308364,  Lng: -122.249500),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 11.67m (38.29ft),  Average Daily Traffic: 4,818 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,680 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: SR 167,  Facility Carried by Structure: W MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.203,  Lanes on structure: 4,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 44.5m (146.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.67m (38.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,749,000,  Roadway Improvement Cost: $950,000,  Total Project Cost: $9,498,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8853B,  Location: 1.1 N JCT SR 18 (Lat: 47.322417,  Lng: -122.245528),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 26,767 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 41,920 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: SR 167,  Facility Carried by Structure: 15TH ST NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 6,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 25.7m (84.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.38m (27.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,730,000,  Roadway Improvement Cost: $946,000,  Total Project Cost: $9,460,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8853C,  Location: 2.3 N JCT SR 18 (Lat: 47.340167,  Lng: -122.245389),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 5,527 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,810 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: SR 167,  Facility Carried by Structure: 37TH ST NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.511,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.32m (27.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,512,000,  Roadway Improvement Cost: $502,000,  Total Project Cost: $5,023,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9058A,  Location: 0.6 E JCT SR 167 (Lat: 47.303167,  Lng: -122.239722),  Route carried "on" structure: State highway 18,  Year Built: 1972,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 51,692 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 72,989 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.617,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 21.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.66m (28.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,522,000,  Roadway Improvement Cost: $704,000,  Total Project Cost: $7,043,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 9236A,  Location: 2.3 N PIERCE CO (Lat: 47.295694,  Lng: -122.257778),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 11.25m (36.91ft),  Average Daily Traffic: 25,000 (year 2013),  Truck Traffic: 5%,  Design Load: HS 20+Mod,  Features Intersected: SR 167,  Facility Carried by Structure: 15TH ST SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 6,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Skew: 21 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 26.1m (85.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.25m (36.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $7,085,000,  Roadway Improvement Cost: $1,417,000,  Total Project Cost: $14,170,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9236B,  Location: 2.8 N PIERCE CO (Lat: 47.301889,  Lng: -122.252778),  Route carried "on" structure: State highway 167,  Year Built: 1973,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 10.45m (34.28ft),  Average Daily Traffic: 44,417 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 62,716 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.062,  Lanes on structure: 3,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.45m (34.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,725,000,  Roadway Improvement Cost: $945,000,  Total Project Cost: $9,450,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 9236C,  Location: 2.8 N PIERCE CO (Lat: 47.301944,  Lng: -122.253278),  Route carried "on" structure: State highway 167,  Year Built: 1973,  Status: Open,  Structure Length: 10.21m (33.50ft),  Average Daily Traffic: 44,417 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 62,716 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.062,  Lanes on structure: 3,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.21m (33.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,216,000,  Roadway Improvement Cost: $643,000,  Total Project Cost: $6,432,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9236D,  Location: 2.7 N PIERCE CO (Lat: 47.299500,  Lng: -122.253000),  Route carried "on" structure: Ramp State highway 167,  Year Built: 1975,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 4,554 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,430 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: N-E RAMP,  Facility Carried by Structure: NB RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.32m (27.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,692,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $3,385,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9236E,  Location: 2.8 N PIERCE CO (Lat: 47.303664,  Lng: -122.255158),  Route carried "on" structure: Ramp State highway 167,  Year Built: 1973,  Status: Open,  Structure Length: 9.57m (31.40ft),  Average Daily Traffic: 18,754 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 26,480 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: W VALLEY HWY S, MILL CR,  Facility Carried by Structure: S-W RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.933,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.57m (31.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,758,000,  Roadway Improvement Cost: $352,000,  Total Project Cost: $3,517,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9236F,  Location: 2.8 N PIERCE CO (Lat: 47.301889,  Lng: -122.252417),  Route carried "on" structure: Ramp State highway 167,  Year Built: 1974,  Status: Open,  Structure Length: 10.09m (33.10ft),  Average Daily Traffic: 4,554 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,430 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.09m (33.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,707,000,  Roadway Improvement Cost: $741,000,  Total Project Cost: $7,414,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 12555A,  Location: 0.6 E JCT SR 164 (Lat: 47.303472,  Lng: -122.213667),  Route carried "on" structure: State highway 18,  Year Built: 1984,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 64,948 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 91,706 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: M STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.612,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,952,000,  Roadway Improvement Cost: $390,000,  Total Project Cost: $3,903,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12618A,  Location: 0.8 E JCT SR 164 (Lat: 47.303472,  Lng: -122.209000),  Route carried "on" structure: State highway 18,  Year Built: 1986,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 32,474 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 45,853 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BNSF RR SPUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.966,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,866,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $3,731,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12618B,  Location: 0.8 E JCT SR 164 (Lat: 47.303583,  Lng: -122.208972),  Route carried "on" structure: State highway 18,  Year Built: 1960,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 32,474 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 45,853 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BNSF RR SPUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.966,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,866,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $3,731,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 14354A,  Location: 2.3 E JCT SR 164 (Lat: 47.300139,  Lng: -122.180550),  Route carried "on" structure: State highway 18,  Year Built: 1995,  Status: Open,  Structure Length: 9.30m (30.51ft),  Average Daily Traffic: 28,034 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 39,584 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BNRR, AUBURN-BLK DIAMOND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.316,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.30m (30.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $2,867,000,  Roadway Improvement Cost: $573,000,  Total Project Cost: $5,734,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18665A,  Location: 2.8 N PIERCE CO (Lat: 47.301972,  Lng: -122.253000),  Route carried "on" structure: State highway 167,  Year Built: 2016,  Status: Open,  Structure Length: 9.48m (31.10ft),  Average Daily Traffic: 44,417 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 62,716 (year 2039),  Design Load: HL 93,  Features Intersected: SR 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 1,  Lanes under structure: 7,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 56.1m (184.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.48m (31.10ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $1,617,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $3,234,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200425,  Location: 1.0 E JCT SR 167 (Lat: 47.305000,  Lng: -122.233000),  Route carried "on" structure: Ramp State highway 18,  Year Built: 2002,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 9,632 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,600 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: C ST SW,  Facility Carried by Structure: W-W RAMP/3RD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 1,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 54.9m (180.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $972,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $1,944,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80797,  Location: 0.4 MI E OF HARVEY RD (Lat: 47.315500,  Lng: -122.206194),  Route carried "on" structure: City street 55,  Year Built: 1973,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 21,100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 38,100 (year 2040),  Design Load: HS 20,  Features Intersected: GREEN RIVER,  Facility Carried by Structure: 8TH STREET NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,400,000,  Roadway Improvement Cost: $680,000,  Total Project Cost: $6,800,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85173,  Location: 0.3 MI E JCT SR 167 (Lat: 47.322194,  Lng: -122.239361),  Route carried "on" structure: City street 5504,  Year Built: 1972,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 31,879 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 48,000 (year 2039),  Design Load: HS 20,  Features Intersected: UPRR,  Facility Carried by Structure: 15TH ST NORTHWEST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 22.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $5,902,000,  Roadway Improvement Cost: $1,180,000,  Total Project Cost: $11,805,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85174,  Location: 0.6 MI E JCT SR 167 (Lat: 47.321194,  Lng: -122.232444),  Route carried "on" structure: City street 5505,  Year Built: 1972,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 31,879 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 48,000 (year 2039),  Design Load: HS 20,  Features Intersected: BNRR & B ST NW,  Facility Carried by Structure: 15TH ST NORTHWEST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.3m (119.1ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.57m (31.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $7,787,000,  Roadway Improvement Cost: $1,557,000,  Total Project Cost: $15,574,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85494,  Location: 1.4 MI S OF SR-18 (Lat: 47.274750,  Lng: -122.208083),  Route carried "on" structure: City street 55,  Year Built: 1967,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 19,500 (year 2020),  Truck Traffic: 35%,  Average Future Daily Traffic: 24,500 (year 2040),  Features Intersected: STUCK RIVER,  Facility Carried by Structure: 'R' ST SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,952,000,  Roadway Improvement Cost: $790,000,  Total Project Cost: $7,904,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 8585,  Location: 0.7 MI E OF SR-167 (Lat: 47.355886,  Lng: -122.229889),  Route carried "on" structure: County highway 92643,  Year Built: 1990,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 18,758 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 25,000 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CATTLE CROSSING,  Facility Carried by Structure: 83RD AVE S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,786,000,  Roadway Improvement Cost: $357,000,  Total Project Cost: $3,571,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86248,  Location: 0.2 MI E OF JCT SR-167 (Lat: 47.295722,  Lng: -122.254222),  Route carried "on" structure: Bypass City street 5510,  Year Built: 1995,  Status: Open,  Structure Length: 14.57m (47.80ft),  Average Daily Traffic: 3,700 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,250 (year 2038),  Design Load: HS 20,  Features Intersected: 15TH ST SW,  Facility Carried by Structure: 15 SW TO SUPERMALL
Minimum Vertical Clearance: 8.53m (27.99ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.87m (48.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $5,075,000,  Roadway Improvement Cost: $1,015,000,  Total Project Cost: $10,150,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8719,  Location: 0.5 MI EAST OF SR-167 (Lat: 47.353694,  Lng: -122.238833),  Route carried "on" structure: City street 55,  Year Built: 2003,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 26,000 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 36,400 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: UNION PACIFIC RR,  Facility Carried by Structure: S 277TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.60m (28.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $6,994,000,  Roadway Improvement Cost: $1,399,000,  Total Project Cost: $13,987,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87191,  Location: 0.5 MI EAST OF SR-167 (Lat: 47.353722,  Lng: -122.232889),  Route carried "on" structure: City street 55,  Year Built: 2003,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 26,000 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 36,400 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BNSF RR,  Facility Carried by Structure: S 277TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.7m (117.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 22.7m (74.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,770,000,  Roadway Improvement Cost: $754,000,  Total Project Cost: $7,539,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87192,  Location: 0.3 MILES WEST OF SR 18 (Lat: 47.305167,  Lng: -122.232861),  Route carried "on" structure: Ramp City street 1080,  Year Built: 2002,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 3,200 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,500 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SOUND TRANSIT P&R ACCESS,  Facility Carried by Structure: 3RD ST SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $512,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,024,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87193,  Location: 0.3 W OF SR- 18 (Lat: 47.304900,  Lng: -122.233042),  Route carried "on" structure: Ramp City street 1080,  Year Built: 2002,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 9,500 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,000 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: C ST SW,  Facility Carried by Structure: 3RD ST SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.8m (137.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,297,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $2,594,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87194,  Location: 0.3 MILES WEST OF SR 18 (Lat: 47.304889,  Lng: -122.232306),  Route carried "on" structure: City street 1080,  Year Built: 2002,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 22,000 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 32,000 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BNSF RR,  Facility Carried by Structure: 3RD ST SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 30.8m (101.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.0m (118.1ft),  Curb-To-Curb Width: 30.9m (101.4ft),  Out-to-Out Width: 31.9m (104.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.72m (12.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,513,000,  Roadway Improvement Cost: $503,000,  Total Project Cost: $5,026,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87195,  Location: 0.3 MILES WEST OF SR-18 (Lat: 47.304861,  Lng: -122.231139),  Route carried "on" structure: City street 1080,  Year Built: 2002,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 22,000 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 32,000 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: A ST SW,  Facility Carried by Structure: 3RD ST SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $883,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $1,766,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87563,  Location: LAKE TAPPS PKY @ E VALLEY (Lat: 47.250717,  Lng: -122.229969),  Route carried "on" structure: City street 98600,  Year Built: 2003,  Status: Open,  Structure Length: 13.66m (44.82ft),  Average Daily Traffic: 17,243 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 35,000 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: E VALLEY HIGHWAY,  Facility Carried by Structure: LAKE TAPPS PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 23.5m (77.1ft),  Out-to-Out Width: 27.1m (88.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.66m (44.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $7,078,000,  Roadway Improvement Cost: $1,416,000,  Total Project Cost: $14,157,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 89183,  Location: 0.2 MI W OF SR 169 (Lat: 47.322483,  Lng: -122.248292),  Route carried "on" structure: Other road 55,  Year Built: 2014,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 20,648 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 25,000 (year 2039),  Design Load: HL 93,  Features Intersected: MILL CREEK WETLAND,  Facility Carried by Structure: 15 STREET NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.0m,  Curb-To-Curb Width: 27.3m (89.6ft),  Out-to-Out Width: 39.6m (129.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $482,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $963,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5082A,  Location: 1.0 E JCT SR 167 (Lat: 47.303583,  Lng: -122.232944),  Route carried "under" structure: City street 18,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 17,392 (year 2009),  Truck Traffic: 5%,  Features Intersected: NPRY & CITY STREETS
Minimum Vertical Clearance: 9.25m (30.35ft),  Kilometerpoint: 0.338,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.3m (96.1ft)

Discuss Auburn, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.