Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bellingham, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 79Number of bridges
  • 961ft / 293mTotal length
  • $207,119,000Total costs
  • 1,527,865Total average daily traffic
  • 92,028Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bellingham
  • No street view available for this location

New bridges in Bellingham, WA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 41920-1929
  • 71930-1939
  • 21940-1949
  • 231950-1959
  • 111960-1969
  • 91970-1979
  • 81980-1989
  • 31990-1999
  • 72000-2009
  • 32010-2019
  • 12020-2022
Reconstructed bridges in Bellingham, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31950-1959
  • 01960-1969
  • 01970-1979
  • 31980-1989
  • 31990-1999
Average Bridge Daily Traffic in Bellingham, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 33.9%Good
  • 39.3%Satisfactory
  • 12.5%Fair
  • 1.8%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.9%Very good
  • 28.6%Good
  • 42.9%Satisfactory
  • 16.1%Fair
  • 1.8%Serious
  • 1.8%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.7%Very good
  • 53.6%Good
  • 19.6%Satisfactory
  • 8.9%Fair
  • 1.8%Poor
  • 1.8%Serious
  • 1.8%Critical
  • 1.8%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 52.5%Very good
  • 27.5%Good
  • 15.0%Satisfactory
  • 5.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: AB,  Location: 1.4 N JCT SR 542 (Lat: 48.783000,  Lng: -122.485889),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1988,  Status: Open,  Structure Length: 15.85m (52.00ft),  Average Daily Traffic: 5,084 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,300 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 539, CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 1,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.85m (52.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,328,000,  Roadway Improvement Cost: $666,000,  Total Project Cost: $6,656,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 453A,  Location: 13.1 N JCT I-5 (Lat: 48.633750,  Lng: -122.472306),  Route carried "on" structure: State highway 11,  Year Built: 1920,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 2,425 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,569 (year 2039),  Features Intersected: HALF BRIDGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.115,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.42m (14.50ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $609,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,218,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1620A,  Location: 5.7 N SKAGIT CO (Lat: 48.716250,  Lng: -122.502222),  Route carried "on" structure: State highway 11,  Year Built: 1932,  Status: Open,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 10,957 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,734 (year 2039),  Design Load: H 15,  Features Intersected: PADDEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.913,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 29.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.06m (33.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,300,000,  Roadway Improvement Cost: $660,000,  Total Project Cost: $6,600,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3732A,  Location: 12.8 N JCT I-5 (Lat: 48.630111,  Lng: -122.467972),  Route carried "on" structure: State highway 11,  Year Built: 1950,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 2,425 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,569 (year 2039),  Design Load: HS 15,  Features Intersected: HALF BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.584,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 3.0m (9.8ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $319,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $638,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5463A,  Location: 2.8 N JCT SR 11 (Lat: 48.752417,  Lng: -122.462800),  Route carried "on" structure: Interstate 5,  Year Built: 1957,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 38,346 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 55,064 (year 2039),  Design Load: HS 20,  Features Intersected: MEADOR AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 408.001,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.53m (27.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $2,464,000,  Roadway Improvement Cost: $493,000,  Total Project Cost: $4,928,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5463B,  Location: 2.8 N JCT SR 11 (Lat: 48.752600,  Lng: -122.462850),  Route carried "on" structure: Interstate 5,  Year Built: 1957,  Status: Open,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 38,346 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 55,064 (year 2039),  Design Load: HS 20,  Features Intersected: MEADOR AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 408.017,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 32.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,079,000,  Roadway Improvement Cost: $416,000,  Total Project Cost: $4,158,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5468A,  Location: 3.1 N JCT SR 11 (Lat: 48.756278,  Lng: -122.461686),  Route carried "on" structure: Interstate 5,  Year Built: 1957,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 66,339 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 95,262 (year 2039),  Design Load: HS 20,  Features Intersected: IOWA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 408.435,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 27.3m (89.6ft),  Out-to-Out Width: 29.8m (97.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $2,512,000,  Roadway Improvement Cost: $502,000,  Total Project Cost: $5,023,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5525A,  Location: 2.9 N JCT SR 11 (Lat: 48.753833,  Lng: -122.462139),  Route carried "on" structure: Interstate 5,  Year Built: 1957,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 33,170 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,632 (year 2039),  Design Load: HS 20,  Features Intersected: WHATCOM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 408.178,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,190,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $2,380,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5525B,  Location: 2.9 N JCT SR 11 (Lat: 48.753911,  Lng: -122.462411),  Route carried "on" structure: Interstate 5,  Year Built: 1957,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 33,170 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,632 (year 2039),  Design Load: HS 20,  Features Intersected: WHATCOM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 408.178,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,879,000,  Roadway Improvement Cost: $376,000,  Total Project Cost: $3,758,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5620A,  Location: 1.4 N JCT SR 542 (Lat: 48.782806,  Lng: -122.485639),  Route carried "on" structure: Interstate 5,  Year Built: 1958,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 27,601 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 39,635 (year 2039),  Design Load: HS 20,  Features Intersected: SR 539 MERIDIAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 412.330,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.21m (17.09ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $1,368,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $2,736,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 5620B,  Location: 1.4 N JCT SR 542 (Lat: 48.782639,  Lng: -122.485639),  Route carried "on" structure: Interstate 5,  Year Built: 1958,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 27,601 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 39,635 (year 2039),  Design Load: HS 20,  Features Intersected: SR 539 MERIDIAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 412.330,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.21m (17.09ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $1,642,000,  Roadway Improvement Cost: $328,000,  Total Project Cost: $3,283,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 5642A,  Location: 3.2 N JCT SR 11 (Lat: 48.757600,  Lng: -122.461483),  Route carried "on" structure: Interstate 5,  Year Built: 1958,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 66,339 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 95,262 (year 2039),  Design Load: HS 20,  Features Intersected: KENTUCKY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 408.580,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 27.3m (89.6ft),  Out-to-Out Width: 28.8m (94.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 26.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $2,392,000,  Roadway Improvement Cost: $478,000,  Total Project Cost: $4,784,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5663A,  Location: 3.5 N JCT SR 11 (Lat: 48.763028,  Lng: -122.462161),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 17,997 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,065 (year 2040),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: ALABAMA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.736,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.94m (16.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,490,000,  Roadway Improvement Cost: $298,000,  Total Project Cost: $2,981,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5666A,  Location: 0.6 N JCT SR 542 (Lat: 48.777611,  Lng: -122.470028),  Route carried "on" structure: Interstate 5,  Year Built: 1958,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 41,569 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 59,693 (year 2039),  Design Load: HS 20,  Features Intersected: SQUALICUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 410.962,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.87m (29.10ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $2,095,000,  Roadway Improvement Cost: $419,000,  Total Project Cost: $4,190,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 5666B,  Location: 0.6 N JCT SR 542 (Lat: 48.777583,  Lng: -122.470389),  Route carried "on" structure: Interstate 5,  Year Built: 1958,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 41,569 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 59,693 (year 2039),  Design Load: HS 20,  Features Intersected: SQUALICUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 410.978,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.87m (29.10ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $2,095,000,  Roadway Improvement Cost: $419,000,  Total Project Cost: $4,190,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5704A,  Location: 0.8 N JCT SR 539 (Lat: 48.785000,  Lng: -122.501667),  Route carried "on" structure: Interstate 5,  Year Built: 1958,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 27,752 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 39,851 (year 2039),  Design Load: HS 20,  Features Intersected: NORTHWEST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 413.569,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $1,232,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $2,464,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5704B,  Location: 0.8 N JCT SR 539 (Lat: 48.783861,  Lng: -122.502611),  Route carried "on" structure: Interstate 5,  Year Built: 1958,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 27,752 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 39,851 (year 2039),  Design Load: HS 20,  Features Intersected: NORTHWEST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 413.569,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $1,232,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $2,464,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5790A,  Location: 2.2 N JCT SR 11 (Lat: 48.744861,  Lng: -122.466139),  Route carried "on" structure: Interstate 5,  Year Built: 1958,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 32,475 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 46,634 (year 2039),  Design Load: HS 20,  Features Intersected: LAKEWAY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 407.116,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $773,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $1,546,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 5790B,  Location: 2.2 N JCT SR 11 (Lat: 48.744861,  Lng: -122.466389),  Route carried "on" structure: Interstate 5,  Year Built: 1958,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 32,475 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 46,634 (year 2039),  Design Load: HS 20,  Features Intersected: LAKEWAY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 407.116,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $773,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $1,546,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6011B,  Location: 13.3 N JCT I-5 (Lat: 48.636111,  Lng: -122.475000),  Route carried "on" structure: State highway 11,  Year Built: 1920,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 2,425 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,569 (year 2039),  Features Intersected: HILLSIDE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.436,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 2.8m (9.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $348,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $697,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6928A,  Location: 3.6 N SKAGIT CO. (Lat: 48.687556,  Lng: -122.399167),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 3,304 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,888 (year 2036),  Design Load: HS 20,  Features Intersected: I-5,  Facility Carried by Structure: LAKE SAMISH DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.192,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.23m (27.00ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $2,160,000,  Roadway Improvement Cost: $432,000,  Total Project Cost: $4,320,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 6928B,  Location: 8.1 N SKAGIT CO (Lat: 48.713694,  Lng: -122.474528),  Route carried "on" structure: Interstate 5,  Year Built: 1962,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 21,720 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 31,189 (year 2039),  Design Load: HS 20,  Features Intersected: SR 11 (CONNELLY AVE)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 403.511,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.15m (16.90ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $1,352,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $2,704,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6928C,  Location: 8.1 N SKAGIT CO (Lat: 48.713889,  Lng: -122.474806),  Route carried "on" structure: Interstate 5,  Year Built: 1962,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 21,720 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 31,189 (year 2039),  Design Load: HS 20,  Features Intersected: SR 11 (CONNELLY AVE)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 403.511,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.15m (16.90ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $1,183,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $2,366,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9530A,  Location: 1.5 N JCT SR 539 (Lat: 48.788167,  Lng: -122.516472),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 22,813 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 35,406 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: I-5,  Facility Carried by Structure: BAKERVIEW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,462,000,  Roadway Improvement Cost: $492,000,  Total Project Cost: $4,925,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9530B,  Location: 1.7 N JCT SR 539 (Lat: 48.789028,  Lng: -122.518889),  Route carried "on" structure: Ramp County highway 5,  Year Built: 1976,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 7,511 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,785 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: I-5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.19m (39.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,560,000,  Roadway Improvement Cost: $512,000,  Total Project Cost: $5,120,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 14656A,  Location: JCT I-5 (Lat: 48.770889,  Lng: -122.463833),  Route carried "on" structure: State highway 542,  Year Built: 1996,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 32,277 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 46,349 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: I-5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 6,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 23.5m (77.1ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,239,000,  Roadway Improvement Cost: $648,000,  Total Project Cost: $6,478,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17273A,  Location: 5.8 N JCT I-5 (Lat: 48.866917,  Lng: -122.485750),  Route carried "on" structure: State highway 539,  Year Built: 2008,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 19,601 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 28,147 (year 2039),  Design Load: HL 93,  Features Intersected: TEN MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.350,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.7m (90.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 28.6m (93.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,116,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $2,232,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17273B,  Location: 5.9 N JCT I-5 (Lat: 48.868056,  Lng: -122.485750),  Route carried "on" structure: State highway 539,  Year Built: 2008,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 19,601 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 28,147 (year 2039),  Design Load: HL 93,  Features Intersected: FOUR MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.479,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.7m (90.9ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 27.7m (90.9ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $1,116,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $2,232,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18436A,  Location: 6.3 N SKAGIT CO (Lat: 48.715911,  Lng: -122.492703),  Route carried "on" structure: State highway 11,  Year Built: 2013,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 13,965 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 20,053 (year 2039),  Design Load: HL 93,  Features Intersected: PADDEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.847,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $488,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $975,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 81541,  Location: 00.1 N W.HEMMI RD (Lat: 48.863697,  Lng: -122.496989),  Route carried "on" structure: County highway 76370,  Year Built: 1933,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 887 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,250 (year 2038),  Design Load: H 20,  Features Intersected: TEN MILE CR,  Facility Carried by Structure: OLD GUIDE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,246,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 81701,  Location: 00.3 E. ALDRICH RD. (Lat: 48.862461,  Lng: -122.514181),  Route carried "on" structure: County highway 76320,  Year Built: 1986,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 441 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 600 (year 2041),  Design Load: HS 20,  Features Intersected: TEN MILE CR,  Facility Carried by Structure: HEMMI RD W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,368,000,  Roadway Improvement Cost: $274,000,  Total Project Cost: $2,736,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 82338,  Location: 00.2 E GUIDE MERIDI (Lat: 48.870000,  Lng: -122.480000),  Route carried "on" structure: County highway 56420,  Year Built: 1900,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 841 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,200 (year 2043),  Design Load: H 20,  Features Intersected: TEN MILE CR TRIB,  Facility Carried by Structure: TEN MILE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,246,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82339,  Location: 00.2 W CHASTEEN RD. (Lat: 48.871667,  Lng: -122.465000),  Route carried "on" structure: County highway 56420,  Year Built: 1947,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 841 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,200 (year 2043),  Design Load: H 20,  Features Intersected: TEN MILE CR,  Facility Carried by Structure: TEN MILE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,246,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 83637,  Location: S END N LK SAMISH (Lat: 48.670731,  Lng: -122.411950),  Route carried "on" structure: County highway 44170,  Year Built: 1953,  Year Reconstructed: 1963,  Status: Posted for load,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 955 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,500 (year 2043),  Design Load: HS 20,  Features Intersected: LAKE SAMISH,  Facility Carried by Structure: LAKE SAMISH DR N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Fair,  Channel: Very good,  Operating Rating: 15.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 7.96m (26.12ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $2,714,000,  Roadway Improvement Cost: $543,000,  Total Project Cost: $5,429,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 85375,  Location: 0.11 S JCT ALABAMA ST (Lat: 48.761447,  Lng: -122.420794),  Route carried "on" structure: City street 65201,  Year Built: 1959,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 8,500 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,000 (year 2043),  Design Load: H 15,  Features Intersected: WHATCOM CREEK,  Facility Carried by Structure: ELECTRIC AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,018,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $2,037,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 85402,  Location: 0.07 NW JCT MADRONA ST (Lat: 48.762486,  Lng: -122.507444),  Route carried "on" structure: City street 86603,  Year Built: 1937,  Status: Posted for load,  Structure Length: 10.91m (35.79ft),  Average Daily Traffic: 6,400 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,000 (year 2043),  Design Load: H 15,  Features Intersected: SQUALLICUM CRK-CMSTP&P R,  Facility Carried by Structure: ELDRIDGE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 15.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 9.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 11.22m (36.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $5,594,000,  Roadway Improvement Cost: $1,119,000,  Total Project Cost: $11,187,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85415,  Location: 0.02 S JCT SQUALICUM WAY (Lat: 48.761289,  Lng: -122.508500),  Route carried "on" structure: City street 86401,  Year Built: 1962,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 7,200 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,000 (year 2043),  Design Load: H 20,  Features Intersected: SQUALLICUM CREEK,  Facility Carried by Structure: ROEDER AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $851,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $1,702,000 ( Estimate for 2014)
Discuss Bellingham, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.