Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Brookhaven, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 104Number of bridges
  • 1,089ft / 332mTotal length
  • $7,837,302,000Total costs
  • 444,920Total average daily traffic
  • 85,483Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Brookhaven
  • No street view available for this location

New bridges in Brookhaven, MS - historical statistics
  • New bridges - historical statistics
  • 61930-1939
  • 21940-1949
  • 41950-1959
  • 391960-1969
  • 191970-1979
  • 61980-1989
  • 121990-1999
  • 92000-2009
  • 72010-2019
Reconstructed bridges in Brookhaven, MS - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 22010-2019
  • 12020-2022
Average Bridge Daily Traffic in Brookhaven, MS
Average Bridge Truck Traffic in Brookhaven, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 26.8%Very good
  • 43.7%Good
  • 15.5%Satisfactory
  • 12.7%Fair
  • 1.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 35.2%Very good
  • 35.2%Good
  • 16.9%Satisfactory
  • 5.6%Fair
  • 7.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 36.6%Very good
  • 33.8%Good
  • 7.0%Satisfactory
  • 12.7%Fair
  • 5.6%Poor
  • 1.4%Critical
  • 2.8%Imminent failure
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.2%Very good
  • 36.8%Good
  • 25.0%Satisfactory
  • 25.0%Fair
  • 2.6%Poor
  • 1.3%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 8.0%Very good
  • 52.0%Good
  • 40.0%Satisfactory
Find on map >>   Show street view

Structure Number: 41000550430358,  Location: 11.4 MI N PIKE CL (Lat: 31.517142,  Lng: -90.479550),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 11.70m (38.39ft),  Average Daily Traffic: 180 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 190 (year 2040),  Design Load: HS 15,  Features Intersected: I 55,  Facility Carried by Structure: KATIE DUNN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.653,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: SA4300000000001,  Location: SEC 10 T 5N R 6E B (Lat: 31.411064,  Lng: -90.588822),  Route carried "on" structure: County highway 119,  Year Built: 1967,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 990 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,485 (year 2030),  Design Load: HS 20,  Features Intersected: TRIB TO AMITE RIVER,  Facility Carried by Structure: JACKSON LIB.DR. SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.081,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $26,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $40,000
Find on map >>   Show street view

Structure Number: SA4300000000099,  Location: SEC 5 T 6N R 7E (Lat: 31.520069,  Lng: -90.528747),  Route carried "on" structure: County highway 218,  Year Built: 1995,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 200 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 300 (year 2038),  Design Load: H 15,  Features Intersected: TRIBUTARY BUTLER CREEK,  Facility Carried by Structure: WEST LINCOLN DR SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $62,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $98,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4300000000101,  Location: SEC 8 T 6N R 7E (Lat: 31.510056,  Lng: -90.518528),  Route carried "on" structure: County highway 214,  Year Built: 1989,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 70 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2043),  Design Load: H 15,  Features Intersected: TRIBUTARY BUTLER CREEK,  Facility Carried by Structure: JOHNSON GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.023,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $62,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $98,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA4300000000102,  Location: SEC 10 T 6N R 7E (Lat: 31.508639,  Lng: -90.488667),  Route carried "on" structure: County highway 213,  Year Built: 1975,  Status: Temporarily open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 60 (year 2021),  Average Future Daily Traffic: 90 (year 2043),  Design Load: H 10,  Features Intersected: TRIB BOGUE CHITTO RIVER,  Facility Carried by Structure: RICHARDSON LN SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Imminent failure,  Channel: Fair,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $33,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $67,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA4300000000105,  Location: SEC 15 T 6N R 7E (Lat: 31.491917,  Lng: -90.496861),  Route carried "on" structure: County highway 409,  Year Built: 1999,  Status: Temporarily open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2021),  Average Future Daily Traffic: 75 (year 2043),  Design Load: H 10,  Features Intersected: TRIB GILLIS CREEK,  Facility Carried by Structure: APPLE TR SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $38,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $67,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: SA4300000000123,  Location: SEC 9 T 6N R 8E (Lat: 31.509769,  Lng: -90.413672),  Route carried "on" structure: County highway 53,  Year Built: 2002,  Status: Posted for load,  Structure Length: 1.72m (5.64ft),  Average Daily Traffic: 60 (year 2019),  Average Future Daily Traffic: 90 (year 2039),  Design Load: H 10,  Features Intersected: JORDAN CREEK,  Facility Carried by Structure: BETHEL ROAD SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Poor,  Operating Rating: 17.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $91,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $156,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA4300000000127,  Location: SEC 16 T 6N R 8E B (Lat: 31.487889,  Lng: -90.409528),  Route carried "on" structure: County highway 138,  Year Built: 1998,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 80 (year 2013),  Average Future Daily Traffic: 120 (year 2034),  Design Load: H 15,  Features Intersected: TRIBUTARY JORDAN CREEK,  Facility Carried by Structure: MT OLIVE CHURCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $26,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA4300000000129,  Location: SEC 18 T 6N R 8E B (Lat: 31.493917,  Lng: -90.444167),  Route carried "on" structure: County highway 135,  Year Built: 1998,  Status: Posted for load,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 80 (year 2018),  Average Future Daily Traffic: 120 (year 2038),  Design Load: H 15,  Features Intersected: BOGUE CHITTO RIVER,  Facility Carried by Structure: HOG CHAIN DR SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.081,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Poor,  Operating Rating: 29.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $149,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $228,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA430000000017,  Location: SEC 2 T 7N R 7E B (Lat: 31.610806,  Lng: -90.471417),  Route carried "on" structure: County highway 172,  Year Built: 1975,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 590 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 885 (year 2034),  Design Load: HS 15,  Features Intersected: BOGUE CHITTO RIVER,  Facility Carried by Structure: OLD RED STAR DR NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.162,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4300000000173,  Location: SEC 13 T 7N R 7E B (Lat: 31.575833,  Lng: -90.459194),  Route carried "on" structure: City street 240,  Year Built: 1950,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 2,000 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,200 (year 2044),  Design Load: H 15,  Features Intersected: GUY LEE BRANCH,  Facility Carried by Structure: HALBERT HEIGHTS TR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $75,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $112,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA4300000000174,  Location: SEC 13 T 7N R 7E (Lat: 31.577917,  Lng: -90.455417),  Route carried "on" structure: City street 668,  Year Built: 1945,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 800 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 880 (year 2044),  Design Load: HS 20,  Features Intersected: TRIBUTARY GUY LEE BRANCH,  Facility Carried by Structure: SMYLIE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $41,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $77,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA4300000000175,  Location: SEC 13 T 7N R 7E (Lat: 31.578972,  Lng: -90.454639),  Route carried "on" structure: City street 675,  Year Built: 1945,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 2,200 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,420 (year 2041),  Design Load: HS 20,  Features Intersected: TRIBUTARY GUY LEE BRANCH,  Facility Carried by Structure: WEST CHICKASAW ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.482,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $41,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $77,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA4300000000176,  Location: SEC 22 T 7N R 7E B (Lat: 31.560750,  Lng: -90.495694),  Route carried "on" structure: County highway 2165,  Year Built: 1963,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 2,200 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,300 (year 2034),  Design Load: HS 15,  Features Intersected: WEST BOGUE CHITTO RIVER,  Facility Carried by Structure: ZETUS RD NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.046,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 39.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $150,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4300000000177,  Location: SEC 25 T 7N R 7E (Lat: 31.549444,  Lng: -90.453722),  Route carried "on" structure: County highway 134,  Year Built: 1997,  Status: Open,  Structure Length: 5.60m (18.37ft),  Average Daily Traffic: 500 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 750 (year 2034),  Design Load: HS 20,  Features Intersected: ILLINOIS CENTRAL GULF RR,  Facility Carried by Structure: DALE TRAIL SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.482,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4300000000178,  Location: SEC 27 T 7N R 7E (Lat: 31.542361,  Lng: -90.482556),  Route carried "on" structure: County highway 226,  Year Built: 1990,  Status: Temporarily open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 45 (year 2021),  Average Future Daily Traffic: 60 (year 2043),  Design Load: H 10,  Features Intersected: TRIB W BOGUE CHITTO RIV,  Facility Carried by Structure: DENTON TR NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.321,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Critical,  Channel: Fair,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $49,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $84,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA4300000000181,  Location: SEC 29 T 7N R 7E (Lat: 31.545028,  Lng: -90.522917),  Route carried "on" structure: County highway 229,  Year Built: 2000,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 90 (year 2013),  Average Future Daily Traffic: 135 (year 2034),  Design Load: H 15,  Features Intersected: DOOLITTLE CREEK,  Facility Carried by Structure: BRENCKENRIDGE LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 23.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $56,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $91,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA4300000000182,  Location: SEC 36 T 7N R 7E (Lat: 31.537556,  Lng: -90.447472),  Route carried "on" structure: County highway 135,  Year Built: 1984,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 80 (year 2013),  Average Future Daily Traffic: 120 (year 2034),  Design Load: H 15,  Features Intersected: TRIB BOGUE CHITTO RIVER,  Facility Carried by Structure: RIVER ROAD DR SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $37,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $69,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA4300000000183,  Location: SEC 3 T 7N R 8E B (Lat: 31.602994,  Lng: -90.383561),  Route carried "on" structure: County highway 116,  Year Built: 1950,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 350 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 400 (year 2042),  Design Load: H 15,  Features Intersected: TRIB E BOGUE CHITTO RIV,  Facility Carried by Structure: CALLENDER RD NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA4300000000184,  Location: SEC 3 T 7N R 8E B (Lat: 31.602111,  Lng: -90.393631),  Route carried "on" structure: County highway 116,  Year Built: 1970,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 350 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 525 (year 2039),  Design Load: H 15,  Features Intersected: TRIB E BOGUE CHITTO RIV,  Facility Carried by Structure: CALLENDER RD NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 8.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $56,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $91,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA4300000000185,  Location: SEC 6 T 7N R 8E (Lat: 31.606583,  Lng: -90.441806),  Route carried "on" structure: City street 605,  Year Built: 1936,  Status: Closed,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 2,000 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,000 (year 2034),  Design Load: H 20,  Features Intersected: TRIB E BOGUE CHITTO RIV,  Facility Carried by Structure: NORTH JACKSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.057,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $41,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $78,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA4300000000186,  Location: SEC 9 T 7N R 8E (Lat: 31.596556,  Lng: -90.404278),  Route carried "on" structure: County highway 117,  Year Built: 1935,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 400 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 440 (year 2044),  Design Load: H 15,  Features Intersected: TRIB E BOGUE CHITTO RIV,  Facility Carried by Structure: CALLENDAR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $56,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $91,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA4300000000187,  Location: SEC 10 T 7N R 8E (Lat: 31.592056,  Lng: -90.394556),  Route carried "on" structure: County highway 117,  Year Built: 2003,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 390 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 430 (year 2041),  Design Load: HS 20,  Features Intersected: EAST BOGUE CHITTO RIVER,  Facility Carried by Structure: SMITH LAKE RD NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: SA4300000000188,  Location: SEC 10 T 7N R 8E (Lat: 31.590083,  Lng: -90.390889),  Route carried "on" structure: County highway 120,  Year Built: 1996,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 80 (year 2013),  Average Future Daily Traffic: 120 (year 2034),  Design Load: H 15,  Features Intersected: TRIB E BOGUE CHITTO RIV,  Facility Carried by Structure: MCCOY LANE NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 29.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $22,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $35,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA4300000000189,  Location: SEC 17 T 7N R 8E (Lat: 31.580164,  Lng: -90.424508),  Route carried "on" structure: County highway 119,  Year Built: 1978,  Status: Open,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,350 (year 2041),  Design Load: H 15,  Features Intersected: TRIB E BOGUE CHITTO RIV,  Facility Carried by Structure: WILLIAMS ST NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $53,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $70,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA4300000000192,  Location: SEC 19 T 7N R 8E (Lat: 31.555333,  Lng: -90.434722),  Route carried "on" structure: County highway 182,  Year Built: 1990,  Status: Posted for load,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 40 (year 2019),  Average Future Daily Traffic: 60 (year 2039),  Design Load: H 10,  Features Intersected: EAST BOGUE CHITTO RIVER,  Facility Carried by Structure: WASHINGTON ST NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $101,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $173,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: SA4300000000193,  Location: SEC 27 T 7N R 8E (Lat: 31.539778,  Lng: -90.383444),  Route carried "on" structure: County highway 123,  Year Built: 1975,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 80 (year 2013),  Average Future Daily Traffic: 120 (year 2034),  Design Load: H 15,  Features Intersected: JORDAN CREEK,  Facility Carried by Structure: ROGERS LN SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $49,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $82,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA4300000000194,  Location: SEC 29 T 7N R 8E B (Lat: 31.551492,  Lng: -90.416214),  Route carried "on" structure: County highway 126,  Year Built: 1981,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 420 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 630 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: TRIB BOGUE CHITTO,  Facility Carried by Structure: COUNTY FARM LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.173,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 69.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: SA4300000000196,  Location: SEC 33 T 7N R 8E (Lat: 31.533806,  Lng: -90.396306),  Route carried "on" structure: County highway 125,  Year Built: 1994,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 60 (year 2013),  Average Future Daily Traffic: 90 (year 2034),  Design Load: H 15,  Features Intersected: TRIBUTARY JORDAN CREEK,  Facility Carried by Structure: HUTCHERSON LN SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.540,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 84.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $29,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA4300000000248,  Location: SEC 14 T 8N R 7E (Lat: 31.663139,  Lng: -90.470083),  Route carried "on" structure: County highway 257,  Year Built: 2008,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 120 (year 2044),  Design Load: HS 20+Mod,  Features Intersected: BAYOU PIERRE TRIB,  Facility Carried by Structure: PEARLIE DR NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.379,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: SA4300000000251,  Location: SEC 27 T 8N R 7E B (Lat: 31.626611,  Lng: -90.483639),  Route carried "on" structure: County highway 172,  Year Built: 1982,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 550 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: TRIB TO BOGUE CHITTO RIV,  Facility Carried by Structure: OLD RED STAR DR NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.070,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: SA4300000000252,  Location: SEC 35 T 8N R 7E (Lat: 31.625389,  Lng: -90.471944),  Route carried "on" structure: County highway 254,  Year Built: 1999,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 240 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 360 (year 2034),  Design Load: H 15,  Features Intersected: TRIB W BOGUE CHITTO RIV,  Facility Carried by Structure: CADE LN NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 89.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $56,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $93,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA4300000000253,  Location: SEC 35 T 8N R 7E (Lat: 31.619333,  Lng: -90.468861),  Route carried "on" structure: County highway 404,  Year Built: 1984,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 50 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 75 (year 2034),  Design Load: H 15,  Features Intersected: WEST BOGUE CHITTO RIVER,  Facility Carried by Structure: JAKES TR NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.321,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 13.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $62,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $98,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA430000000026,  Location: SEC 18 T 8N R 8E B (Lat: 31.664806,  Lng: -90.447656),  Route carried "on" structure: County highway 107,  Year Built: 1975,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,350 (year 2041),  Design Load: H 15,  Features Intersected: TRIBUTARY BAYOU PIERRE,  Facility Carried by Structure: NEW SIGHT DR NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.954,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $48,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $64,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA4300000000265,  Location: SEC 27 T 8N R 8E (Lat: 31.629778,  Lng: -90.386861),  Route carried "on" structure: County highway 115,  Year Built: 1990,  Status: Temporarily open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 110 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 120 (year 2041),  Design Load: H 15,  Features Intersected: ISOM BRANCH,  Facility Carried by Structure: CLARK TRAVIS LN NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.643,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Good,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $37,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $69,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA4300000000266,  Location: SEC 27 T 8N R 8E B (Lat: 31.641517,  Lng: -90.385781),  Route carried "on" structure: County highway 275,  Year Built: 1978,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 440 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 500 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: LAKE LINCOLN DR NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.862,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Serious,  Culverts: Good,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: SA4300000000267,  Location: SEC 28 T 8N R 8E B (Lat: 31.628222,  Lng: -90.410111),  Route carried "on" structure: County highway 102,  Year Built: 1937,  Status: Posted for load,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 2,000 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,000 (year 2034),  Design Load: HS 15,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: OLD HWY 51 NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 9.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $131,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: SA4300000000268,  Location: SEC 28 T 8N R 8E (Lat: 31.638611,  Lng: -90.398333),  Route carried "on" structure: County highway 108,  Year Built: 1996,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 80 (year 2013),  Average Future Daily Traffic: 120 (year 2034),  Design Load: H 15,  Features Intersected: CLEAR BRANCH,  Facility Carried by Structure: TARVER TR NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.184,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 15.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $39,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: SA4300000000269,  Location: SEC 29 T 8N R 8E (Lat: 31.641833,  Lng: -90.419917),  Route carried "on" structure: County highway 108,  Year Built: 2002,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 280 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 420 (year 2034),  Design Load: HS 20,  Features Intersected: ILLINOIS CENTRAL GULF RR,  Facility Carried by Structure: FOREST TRL NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Brookhaven, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.