Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Clanton, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 92Number of bridges
  • 1,030ft / 314mTotal length
  • $108,514,000Total costs
  • 765,151Total average daily traffic
  • 139,430Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Clanton
  • No street view available for this location

New bridges in Clanton, AL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 61920-1929
  • 31930-1939
  • 31940-1949
  • 161950-1959
  • 311960-1969
  • 101970-1979
  • 61980-1989
  • 61990-1999
  • 42000-2009
  • 62010-2019
Reconstructed bridges in Clanton, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21930-1939
  • 21940-1949
  • 11950-1959
  • 11960-1969
  • 01970-1979
  • 31980-1989
  • 81990-1999
  • 12000-2009
Average Bridge Daily Traffic in Clanton, AL
Average Bridge Truck Traffic in Clanton, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.0%Excellent
  • 14.8%Very good
  • 24.1%Good
  • 35.2%Satisfactory
  • 13.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Excellent
  • 13.0%Very good
  • 22.2%Good
  • 37.0%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Excellent
  • 5.6%Very good
  • 46.3%Good
  • 16.7%Satisfactory
  • 13.0%Fair
  • 1.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.2%Excellent
  • 17.4%Very good
  • 34.8%Good
  • 33.3%Satisfactory
  • 7.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 17.2%Excellent
  • 10.3%Very good
  • 17.2%Good
  • 37.9%Satisfactory
  • 13.8%Fair
  • 3.4%Poor
Find on map >>   Show street view

Structure Number: 227,  Location: .8 MI. NO. OF PRISON (Lat: 33.766944,  Lng: -86.375278),  Route carried "on" structure: US 23,  Year Built: 1924,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 870 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,055 (year 2041),  Design Load: H 15,  Features Intersected: CANOE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.589,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $784,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $862,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 609,  Location: 2.0 MI W OF BERRY (Lat: 33.680681,  Lng: -87.631528),  Route carried "on" structure: County highway 30,  Year Built: 1991,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 150 (year 1995),  Truck Traffic: 1%,  Average Future Daily Traffic: 165 (year 2030),  Design Load: HS 20,  Features Intersected: NORTH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.51m (8.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $608,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $669,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 947,  Location: CR 249 2M NW CANE CRK CH (Lat: 32.933333,  Lng: -86.600000),  Route carried "on" structure: County highway ,  Year Built: 1932,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 125 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 150 (year 2033),  Design Load: H 10,  Features Intersected: YELLOWLEAF CREEK,  Facility Carried by Structure: CR 249
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $316,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 971,  Location: 2.2 MI. N. OF MILLRY (Lat: 31.660686,  Lng: -88.307225),  Route carried "on" structure: State highway 17,  Year Built: 1932,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,770 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 2,283 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 121.184,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $330,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1688,  Location: NORTHSIDE CLANTON (Lat: 32.846783,  Lng: -86.633650),  Route carried "on" structure: US 31,  Year Built: 1925,  Year Reconstructed: 1938,  Status: Temporarily open,  Structure Length: 4.04m (13.25ft),  Average Daily Traffic: 12,880 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,545 (year 2041),  Design Load: H 15,  Features Intersected: GOOSE POND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 357.466,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.1m (26.6ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,576,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $1,734,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227,  Location: 0.2 MI E US 31 (Lat: 32.857250,  Lng: -86.643389),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 500 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 700 (year 2041),  Design Load: H 15,  Features Intersected: Trib. to Goose Pond Ck.,  Facility Carried by Structure: CENTER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $264,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2631,  Location: 0.6 MI N OF COOPER (Lat: 32.780200,  Lng: -86.553200),  Route carried "on" structure: US 31,  Year Built: 1925,  Year Reconstructed: 1942,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 9,710 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 12,473 (year 2041),  Design Load: H 15,  Features Intersected: Trib. to Chestnut Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 346.394,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $449,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3006,  Location: 0.5 MI E ADAIR SCHOOL (Lat: 32.842817,  Lng: -86.617722),  Route carried "on" structure: City street ,  Year Built: 1947,  Status: Posted for load,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 14,000 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 20,000 (year 2041),  Design Load: H 15,  Features Intersected: POLEY CREEK,  Facility Carried by Structure: LAKE MITCHELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.31m (14.14ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $709,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $780,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3431,  Location: R.R CITY LIMITS CLANTON (Lat: 32.840700,  Lng: -86.633183),  Route carried "on" structure: State highway 22,  Year Built: 1949,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 7,710 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,352 (year 2033),  Design Load: H 20,  Features Intersected: C.S.X. RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 107.258,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 41.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.37m (17.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,063,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $2,269,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3949,  Location: 2.7 MI S THORSBY (Lat: 32.889933,  Lng: -86.676933),  Route carried "on" structure: US 31,  Year Built: 1924,  Year Reconstructed: 1951,  Status: Open,  Structure Length: 3.15m (10.33ft),  Average Daily Traffic: 6,590 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,465 (year 2041),  Design Load: H 15,  Features Intersected: GUM SWAMP BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 363.948,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.5m (34.4ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.01m (13.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,183,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,301,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4138,  Location: 716 FT S JCT 1325 (Lat: 34.213917,  Lng: -86.234064),  Route carried "on" structure: County highway 127,  Year Built: 1965,  Status: Posted for load,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 200 (year 1994),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: H 15,  Features Intersected: LITTLE SLAB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.37m (14.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $868,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $955,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4198,  Location: 0.5 MI N JCT SR 22 (Lat: 32.771267,  Lng: -86.534233),  Route carried "on" structure: US 31,  Year Built: 1925,  Year Reconstructed: 1952,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 5,720 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,348 (year 2041),  Design Load: H 15,  Features Intersected: Trib. of Chestnut Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 344.330,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $523,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $575,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 502,  Location: CR24 .1MIW OF COOPERS (Lat: 32.773133,  Lng: -86.546956),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Posted for load,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 650 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 725 (year 2029),  Design Load: H 15,  Features Intersected: CHESTNUT CREEK,  Facility Carried by Structure: CR24 COOPER-ENTERP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,394,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $1,533,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5021,  Location: CR 24 1M W OF COOPER (Lat: 32.760714,  Lng: -86.576139),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 475 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2029),  Design Load: HS 20,  Features Intersected: SOUTH PRONG,  Facility Carried by Structure: CR 24 COOPER ENT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.91m (9.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $685,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5724,  Location: 2.5 MI S JCT SR 145 (Lat: 32.857183,  Lng: -86.601533),  Route carried "on" structure: Interstate 65,  Year Built: 1957,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 17,741 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 22,476 (year 2033),  Design Load: HS 20,  Features Intersected: WALNUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 336.923,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,887,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $2,076,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 609,  Location: 1.3 MI N JCT U S #31 (Lat: 32.819417,  Lng: -86.586517),  Route carried "on" structure: County highway 18,  Year Built: 1958,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 242 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 339 (year 2030),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,062,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $2,268,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6091,  Location: 2.2 MI N JCT US #31 (Lat: 32.832600,  Lng: -86.591217),  Route carried "on" structure: County highway 85,  Year Built: 1958,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 500 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 682 (year 2030),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,055,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $2,261,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6092,  Location: 3.5 MI S JCT SR 145 (Lat: 32.843483,  Lng: -86.595250),  Route carried "on" structure: County highway 28,  Year Built: 1958,  Status: Open,  Structure Length: 9.63m (31.59ft),  Average Daily Traffic: 1,186 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,162 (year 2028),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.58m (34.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,393,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $2,632,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6093,  Location: 3.0 MI S JCT SR 145 (Lat: 32.850233,  Lng: -86.597700),  Route carried "on" structure: County highway 32,  Year Built: 1958,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 500 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2030),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,055,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $2,261,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6109,  Location: CR29 .4 MI.SW NEWSALEM CH (Lat: 32.897467,  Lng: -86.678886),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Posted for load,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 700 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 750 (year 2029),  Design Load: H 15,  Features Intersected: CR29YELLOW LEAF CREEK,  Facility Carried by Structure: CR29NEW SALEMCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,444,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $1,588,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6454,  Location: 1.6 MI S JCT US 31 (Lat: 32.780083,  Lng: -86.571900),  Route carried "on" structure: Interstate 65,  Year Built: 1959,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 17,465 (year 2017),  Truck Traffic: 23%,  Average Future Daily Traffic: 26,198 (year 2041),  Design Load: H 20,  Features Intersected: Trib. to Chestnut Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 327.925,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $654,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $719,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6455,  Location: 1.6 MI S JCT US 31 (Lat: 32.780433,  Lng: -86.570917),  Route carried "on" structure: Interstate 65,  Year Built: 1959,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 17,465 (year 2017),  Truck Traffic: 23%,  Average Future Daily Traffic: 26,198 (year 2041),  Design Load: H 20,  Features Intersected: Trib. to Chestnut Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 327.925,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $551,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $606,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6788,  Location: 1.4 MI W COOPER (Lat: 32.761983,  Lng: -86.560350),  Route carried "on" structure: County highway 24,  Year Built: 1960,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 300 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 450 (year 2035),  Design Load: H 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,806,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,987,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6789,  Location: 0.2 MI S JCT US 31 (Lat: 32.798433,  Lng: -86.578983),  Route carried "on" structure: Interstate 65,  Year Built: 1960,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 17,465 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 22,127 (year 2033),  Design Load: HS 20,  Features Intersected: C.S.X. RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 330.072,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 15 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.47m (17.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,726,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $1,899,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 679,  Location: 0.2 MI S JCT US 31 (Lat: 32.798450,  Lng: -86.578867),  Route carried "on" structure: Interstate 65,  Year Built: 1960,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 17,465 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 22,127 (year 2033),  Design Load: HS 20,  Features Intersected: C.S.X. RR Active
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 330.072,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 15 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.47m (17.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,726,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $1,899,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6791,  Location: 0.1 MI S JCT US 31 (Lat: 32.800133,  Lng: -86.579583),  Route carried "on" structure: Interstate 65,  Year Built: 1960,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 34,110 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 51,165 (year 2041),  Design Load: H 20,  Features Intersected: Chestnut Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 330.262,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.7m (90.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,565,000,  Roadway Improvement Cost: $357,000,  Total Project Cost: $3,922,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6792,  Location: 0.2 MI N JCT US 31 (Lat: 32.804317,  Lng: -86.581117),  Route carried "on" structure: Interstate 65,  Year Built: 1960,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 34,110 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 51,165 (year 2041),  Design Load: HS 20,  Features Intersected: Trib to Chestnut Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 330.744,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,112,000,  Roadway Improvement Cost: $411,000,  Total Project Cost: $4,523,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6793,  Location: 1.8 MI S JCT 145 (Lat: 32.865083,  Lng: -86.607233),  Route carried "on" structure: County highway 51,  Year Built: 1960,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 500 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2030),  Design Load: H 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 21 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,744,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $1,918,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6794,  Location: 2.5 MI N JCT SR 145 (Lat: 32.918983,  Lng: -86.646767),  Route carried "on" structure: County highway 43,  Year Built: 1960,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 400 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 550 (year 2028),  Design Load: H 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.61m (31.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,845,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $2,030,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6915,  Location: 0.1 MI S JCT I-65 (Lat: 32.801467,  Lng: -86.577867),  Route carried "on" structure: US 31,  Year Built: 1960,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 9,700 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 12,459 (year 2041),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 349.747,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,668,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $1,835,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6916,  Location: 2.0 MI S CLANTON (Lat: 32.802000,  Lng: -86.580200),  Route carried "on" structure: US 31,  Year Built: 1960,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 9,150 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,754 (year 2036),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 349.933,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.62m (31.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,111,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $2,322,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7152,  Location: 3.7 MI N OF CLANTON (Lat: 32.887800,  Lng: -86.624317),  Route carried "on" structure: State highway 145,  Year Built: 1960,  Status: Open,  Structure Length: 9.42m (30.91ft),  Average Daily Traffic: 7,090 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,720 (year 2033),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.918,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.37m (34.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,276,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $2,504,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 765,  Location: 0.2 MI SE OF AIRPORT (Lat: 32.848833,  Lng: -86.606361),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Posted for load,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 7,100 (year 2007),  Truck Traffic: 10%,  Average Future Daily Traffic: 15,215 (year 2041),  Design Load: H 15,  Features Intersected: WALNUT CREEK,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 36.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $1,779,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $1,957,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8111,  Location: CLANTON (Lat: 32.845067,  Lng: -86.625083),  Route carried "on" structure: State highway 145,  Year Built: 1938,  Year Reconstructed: 1964,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 9,435 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,460 (year 2040),  Design Load: H 15,  Features Intersected: GOOSE POND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.035,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 14.5m (47.6ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.05m (16.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,007,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $2,208,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 821,  Location: CR437 1MI N CROSS RD CH (Lat: 32.756881,  Lng: -86.563058),  Route carried "on" structure: County highway ,  Year Built: 1964,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 175 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 200 (year 2031),  Design Load: H 15,  Features Intersected: SOUTH PRONG CREEK,  Facility Carried by Structure: CR437 BOBGRIFFINRD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $486,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $535,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8212,  Location: CR13 1MI NW NEWHARMONYCH (Lat: 32.902222,  Lng: -86.660378),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 250 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 300 (year 2033),  Design Load: H 15,  Features Intersected: YELLOWLEAF CREEK,  Facility Carried by Structure: CO RD 13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,063,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,169,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 862,  Location: CR53 .75MI S MTPLEASANTCH (Lat: 32.845178,  Lng: -86.667089),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 600 (year 1986),  Truck Traffic: 1%,  Average Future Daily Traffic: 625 (year 2029),  Design Load: HS 20,  Features Intersected: GOOSE POND CREEK,  Facility Carried by Structure: CR53 LITTLEJOHN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $286,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $315,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9201,  Location: 2.2 MI. N. OF GREENSBORO (Lat: 32.730214,  Lng: -87.597269),  Route carried "on" structure: County highway 19,  Year Built: 1900,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 200 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2034),  Design Load: H 10,  Features Intersected: TRIB. TO COLWELL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $305,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9508,  Location: 0.4 MI W JCT US 431 (Lat: 33.617203,  Lng: -85.729783),  Route carried "on" structure: Interstate 20,  Year Built: 1968,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 18,518 (year 2019),  Truck Traffic: 40%,  Average Future Daily Traffic: 25,925 (year 2039),  Design Load: HS 20,  Features Intersected: CHOCCOLOCCO CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 308.154,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,611,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $2,872,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Clanton, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.