Bridge Statistics for Columbia, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 255Number of bridges
- 2,582ft / 787mTotal length
- $8,034,000Total costs
- 2,451,720Total average daily traffic
- 382,857Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Columbia
- No street view available for this location
- New bridges - historical statistics
- 61920-1929
- 31930-1939
- 31940-1949
- 241950-1959
- 221960-1969
- 301970-1979
- 671980-1989
- 321990-1999
- 302000-2009
- 362010-2019
- 22020-2022
- Reconstructed bridges - Historical Statistics
- 11950-1959
- 01960-1969
- 81970-1979
- 61980-1989
- 51990-1999
- 12000-2009
- 22010-2019
- Bridge Condition - Deck
- 5.9%Excellent
- 19.6%Very good
- 42.5%Good
- 20.3%Satisfactory
- 7.8%Fair
- 2.0%Poor
- 2.0%Serious
- Bridge Condition - Superstructure
- 7.1%Excellent
- 14.9%Very good
- 45.5%Good
- 20.1%Satisfactory
- 6.5%Fair
- 3.9%Poor
- 1.9%Serious
- Bridge Condition - Substructure
- 13.6%Excellent
- 19.5%Very good
- 29.2%Good
- 32.5%Satisfactory
- 3.9%Fair
- 1.3%Poor
- Bridge Condition - Channel
- 1.3%Very good
- 19.7%Good
- 50.0%Satisfactory
- 28.3%Fair
- 0.7%Poor
- Bridge Condition - Culverts
- 2.8%Very good
- 36.1%Good
- 47.2%Satisfactory
- 8.3%Fair
- 2.8%Poor
- 2.8%Serious
Find on map >> Show street view
Structure Number: 4212, Location: S 16 T 48 N R 13 W (Lat: 38.955658, Lng: -92.395839), Route carried "on" structure: State highway TT, Year Built: 1994, Status: Open, Structure Length: 0.66m (2.17ft), Average Daily Traffic: 17,611 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 32,580 (year 2041), Design Load: HS 20, Features Intersected: BR OF PERCHE CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.014, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 20.7m (67.9ft), Skew: 3 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 2.7m (8.9ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 87.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 52.2 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021
Structure Number: 4212, Location: S 16 T 48 N R 13 W (Lat: 38.955658, Lng: -92.395839), Route carried "on" structure: State highway TT, Year Built: 1994, Status: Open, Structure Length: 0.66m (2.17ft), Average Daily Traffic: 17,611 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 32,580 (year 2041), Design Load: HS 20, Features Intersected: BR OF PERCHE CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.014, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 20.7m (67.9ft), Skew: 3 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 2.7m (8.9ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 87.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 52.2 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021
Find on map >> Show street view
Structure Number: 4304, Location: S 1 T 48 N R 13 W (Lat: 38.975186, Lng: -92.326497), Route carried "on" structure: State highway 763, Year Built: 1994, Status: Open, Structure Length: 4.88m (16.01ft), Average Daily Traffic: 18,775 (year 2021), Truck Traffic: 7%, Average Future Daily Traffic: 34,734 (year 2041), Design Load: HS 25 or greater, Features Intersected: BEAR CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.752, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 20.4m (66.9ft), Skew: 3 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 16.4m (53.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 20.4m (66.9ft), Out-to-Out Width: 21.2m (69.6ft)
Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Channel: Good, Operating Rating: 80.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 4304, Location: S 1 T 48 N R 13 W (Lat: 38.975186, Lng: -92.326497), Route carried "on" structure: State highway 763, Year Built: 1994, Status: Open, Structure Length: 4.88m (16.01ft), Average Daily Traffic: 18,775 (year 2021), Truck Traffic: 7%, Average Future Daily Traffic: 34,734 (year 2041), Design Load: HS 25 or greater, Features Intersected: BEAR CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.752, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 20.4m (66.9ft), Skew: 3 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 16.4m (53.8ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 20.4m (66.9ft), Out-to-Out Width: 21.2m (69.6ft)
Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Channel: Good, Operating Rating: 80.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 4669, Location: S 8 T 48 N R 13 W (Lat: 38.971231, Lng: -92.411108), Route carried "on" structure: Interstate 70, Year Built: 1940, Year Reconstructed: 1978, Status: Open, Structure Length: 21.28m (69.82ft), Average Daily Traffic: 22,237 (year 2021), Truck Traffic: 24%, Average Future Daily Traffic: 36,691 (year 2041), Design Load: HS 20, Features Intersected: PERCHE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 205.498, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 9, Length of Maximum Span: 37.1m (121.7ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.0m (42.7ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 62.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 24 months, Inspection Date: September 2020, Other Special Inspection Date: September 2020, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 4669, Location: S 8 T 48 N R 13 W (Lat: 38.971231, Lng: -92.411108), Route carried "on" structure: Interstate 70, Year Built: 1940, Year Reconstructed: 1978, Status: Open, Structure Length: 21.28m (69.82ft), Average Daily Traffic: 22,237 (year 2021), Truck Traffic: 24%, Average Future Daily Traffic: 36,691 (year 2041), Design Load: HS 20, Features Intersected: PERCHE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 205.498, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 10 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 9, Length of Maximum Span: 37.1m (121.7ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.0m (39.4ft), Out-to-Out Width: 13.0m (42.7ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 62.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Other Special Inspection Frequency: Every 24 months, Inspection Date: September 2020, Other Special Inspection Date: September 2020, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 4895, Location: S 9 T 48 N R 12 W (Lat: 38.960250, Lng: -92.266547), Route carried "on" structure: ServiceState highway 70, Year Built: 1925, Status: Posted for load, Structure Length: 2.41m (7.91ft), Average Daily Traffic: 4,114 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 7,200 (year 2041), Design Load: H 15, Features Intersected: HOMINY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.456, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 8.1m (26.6ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.0m (23.0ft)
Condition: Deck: Poor, Superstructure: Poor, Substructure: Satisfactory, Channel: Good, Operating Rating: 36.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 17.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.33m (1.08ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $376,000, Roadway Improvement Cost: $38,000, Total Project Cost: $564,000 ( Estimate for 2022), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up
Structure Number: 4895, Location: S 9 T 48 N R 12 W (Lat: 38.960250, Lng: -92.266547), Route carried "on" structure: ServiceState highway 70, Year Built: 1925, Status: Posted for load, Structure Length: 2.41m (7.91ft), Average Daily Traffic: 4,114 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 7,200 (year 2041), Design Load: H 15, Features Intersected: HOMINY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.456, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 8.1m (26.6ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 7.0m (23.0ft)
Condition: Deck: Poor, Superstructure: Poor, Substructure: Satisfactory, Channel: Good, Operating Rating: 36.9 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 17.1 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.33m (1.08ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $376,000, Roadway Improvement Cost: $38,000, Total Project Cost: $564,000 ( Estimate for 2022), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up
Find on map >> Show street view
Structure Number: 4911, Location: S 3 T 48 N R 13 W (Lat: 38.969919, Lng: -92.378956), Route carried "on" structure: ServiceState highway 70, Year Built: 1925, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 4,273 (year 2021), Truck Traffic: 8%, Average Future Daily Traffic: 7,478 (year 2041), Design Load: H 15, Features Intersected: CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.329, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.7m (12.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 11.0m (36.1ft)
Condition: Channel: Fair, Culverts: Satisfactory, Inventory Rating: 68.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021
Structure Number: 4911, Location: S 3 T 48 N R 13 W (Lat: 38.969919, Lng: -92.378956), Route carried "on" structure: ServiceState highway 70, Year Built: 1925, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 4,273 (year 2021), Truck Traffic: 8%, Average Future Daily Traffic: 7,478 (year 2041), Design Load: H 15, Features Intersected: CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.329, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.7m (12.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 11.0m (36.1ft)
Condition: Channel: Fair, Culverts: Satisfactory, Inventory Rating: 68.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021
Find on map >> Show street view
Structure Number: 574, Location: S 8 T 48 N R 12 W (Lat: 38.961758, Lng: -92.292044), Route carried "on" structure: US , Year Built: 1961, Year Reconstructed: 1983, Status: Posted for load, Structure Length: 6.55m (21.49ft), Average Daily Traffic: 35,893 (year 2021), Truck Traffic: 25%, Average Future Daily Traffic: 66,402 (year 2041), Design Load: H 20, Features Intersected: IS 70, Facility Carried by Structure: US 63C S
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.407, Lanes on structure: 6, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 24.4m (80.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 17.7m (58.1ft), Curb-To-Curb Width: 23.2m (76.1ft), Out-to-Out Width: 24.0m (78.7ft)
Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 41.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 574, Location: S 8 T 48 N R 12 W (Lat: 38.961758, Lng: -92.292044), Route carried "on" structure: US , Year Built: 1961, Year Reconstructed: 1983, Status: Posted for load, Structure Length: 6.55m (21.49ft), Average Daily Traffic: 35,893 (year 2021), Truck Traffic: 25%, Average Future Daily Traffic: 66,402 (year 2041), Design Load: H 20, Features Intersected: IS 70, Facility Carried by Structure: US 63C S
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.407, Lanes on structure: 6, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 24.4m (80.1ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 17.7m (58.1ft), Curb-To-Curb Width: 23.2m (76.1ft), Out-to-Out Width: 24.0m (78.7ft)
Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 41.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay, Membrane: Built-up, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 6162, Location: S 8 T 48 N R 13 W (Lat: 38.962125, Lng: -92.295883), Route carried "on" structure: Interstate 70, Year Built: 1949, Year Reconstructed: 1976, Status: Open, Structure Length: 6.77m (22.21ft), Average Daily Traffic: 16,789 (year 2021), Truck Traffic: 24%, Average Future Daily Traffic: 27,702 (year 2041), Design Load: HS 20, Features Intersected: HINKSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 207.059, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 12 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 16.0m (52.5ft), Curb-To-Curb Width: 14.5m (47.6ft), Out-to-Out Width: 15.5m (50.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Fair, Operating Rating: 72.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete, Membrane: Built-up
Structure Number: 6162, Location: S 8 T 48 N R 13 W (Lat: 38.962125, Lng: -92.295883), Route carried "on" structure: Interstate 70, Year Built: 1949, Year Reconstructed: 1976, Status: Open, Structure Length: 6.77m (22.21ft), Average Daily Traffic: 16,789 (year 2021), Truck Traffic: 24%, Average Future Daily Traffic: 27,702 (year 2041), Design Load: HS 20, Features Intersected: HINKSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 207.059, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 12 degrees, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 16.0m (52.5ft), Curb-To-Curb Width: 14.5m (47.6ft), Out-to-Out Width: 15.5m (50.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Channel: Fair, Operating Rating: 72.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete, Membrane: Built-up
Find on map >> Show street view
Structure Number: 618, Location: S 6 T 48 N R 12 W (Lat: 38.967147, Lng: -92.308303), Route carried "on" structure: State highway B, Year Built: 1957, Year Reconstructed: 1999, Status: Posted for load, Structure Length: 4.97m (16.31ft), Average Daily Traffic: 16,652 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 30,806 (year 2041), Design Load: H 20, Features Intersected: IS 70
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 19.082, Lanes on structure: 5, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 18.3m (60.0ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 13.4m (44.0ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 0.0m, Curb-To-Curb Width: 19.8m (65.0ft), Out-to-Out Width: 20.6m (67.6ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 42.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Structure Number: 618, Location: S 6 T 48 N R 12 W (Lat: 38.967147, Lng: -92.308303), Route carried "on" structure: State highway B, Year Built: 1957, Year Reconstructed: 1999, Status: Posted for load, Structure Length: 4.97m (16.31ft), Average Daily Traffic: 16,652 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 30,806 (year 2041), Design Load: H 20, Features Intersected: IS 70
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 19.082, Lanes on structure: 5, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 18.3m (60.0ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 13.4m (44.0ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 0.0m, Curb-To-Curb Width: 19.8m (65.0ft), Out-to-Out Width: 20.6m (67.6ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 42.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >> Show street view
Structure Number: 621, Location: S 11 T 48 N R 12 W (Lat: 38.960006, Lng: -92.235944), Route carried "on" structure: Interstate 70, Year Built: 1949, Year Reconstructed: 1978, Status: Open, Structure Length: 1.19m (3.90ft), Average Daily Traffic: 43,621 (year 2021), Truck Traffic: 30%, Average Future Daily Traffic: 71,975 (year 2041), Design Load: HS 20, Features Intersected: GRINDSTONE CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 212.292, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 23 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 81.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021
Structure Number: 621, Location: S 11 T 48 N R 12 W (Lat: 38.960006, Lng: -92.235944), Route carried "on" structure: Interstate 70, Year Built: 1949, Year Reconstructed: 1978, Status: Open, Structure Length: 1.19m (3.90ft), Average Daily Traffic: 43,621 (year 2021), Truck Traffic: 30%, Average Future Daily Traffic: 71,975 (year 2041), Design Load: HS 20, Features Intersected: GRINDSTONE CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 212.292, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 23 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 81.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021
Find on map >> Show street view
Structure Number: 65, Location: S 1 T 48 N R 13 W (Lat: 38.969069, Lng: -92.333669), Route carried "on" structure: State highway 163, Year Built: 1957, Year Reconstructed: 1983, Status: Open, Structure Length: 5.21m (17.09ft), Average Daily Traffic: 22,532 (year 2021), Truck Traffic: 4%, Average Future Daily Traffic: 41,684 (year 2041), Design Load: H 20, Features Intersected: IS 70
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.021, Lanes on structure: 6, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 21.9m (71.9ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 13.4m (44.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 23.2m (76.1ft), Out-to-Out Width: 24.0m (78.7ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 78.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 65, Location: S 1 T 48 N R 13 W (Lat: 38.969069, Lng: -92.333669), Route carried "on" structure: State highway 163, Year Built: 1957, Year Reconstructed: 1983, Status: Open, Structure Length: 5.21m (17.09ft), Average Daily Traffic: 22,532 (year 2021), Truck Traffic: 4%, Average Future Daily Traffic: 41,684 (year 2041), Design Load: H 20, Features Intersected: IS 70
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.021, Lanes on structure: 6, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 21.9m (71.9ft), Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 13.4m (44.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 23.2m (76.1ft), Out-to-Out Width: 24.0m (78.7ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 78.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 6586, Location: S 10 T 48 N R 12 W (Lat: 38.960119, Lng: -92.253136), Route carried "on" structure: County highway , Year Built: 1957, Year Reconstructed: 1991, Status: Open, Structure Length: 5.85m (19.19ft), Average Daily Traffic: 2,617 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 4,580 (year 2041), Design Load: HS 20+Mod, Features Intersected: IS 70, Facility Carried by Structure: ST CHARLES RD E
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.879, Lanes on structure: 3, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 17.7m (58.1ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 17.7m (58.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.3m (56.8ft), Out-to-Out Width: 18.1m (59.4ft)
Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 57.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 6586, Location: S 10 T 48 N R 12 W (Lat: 38.960119, Lng: -92.253136), Route carried "on" structure: County highway , Year Built: 1957, Year Reconstructed: 1991, Status: Open, Structure Length: 5.85m (19.19ft), Average Daily Traffic: 2,617 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 4,580 (year 2041), Design Load: HS 20+Mod, Features Intersected: IS 70, Facility Carried by Structure: ST CHARLES RD E
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.879, Lanes on structure: 3, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 17.7m (58.1ft), Skew: 1 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 17.7m (58.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 17.3m (56.8ft), Out-to-Out Width: 18.1m (59.4ft)
Condition: Deck: Fair, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 57.6 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 6599, Location: S 5 T 48 N R 12 W (Lat: 38.964758, Lng: -92.302342), Route carried "on" structure: Ramp State highway , Year Built: 1957, Status: Posted for load, Structure Length: 5.58m (18.31ft), Average Daily Traffic: 2,643 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 4,361 (year 2041), Design Load: H 20, Features Intersected: IS 70, Facility Carried by Structure: RP IS70W TO LP70W
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.468, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 4 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.4m (27.6ft)
Condition: Deck: Serious, Superstructure: Fair, Substructure: Fair, Operating Rating: 41.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.66m (2.17ft), Designated Inspection Frequency: Every 12 months, Inspection Date: March 2022, Bridge Improvement Cost: $540,000, Roadway Improvement Cost: $54,000, Total Project Cost: $810,000 ( Estimate for 2022), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 6599, Location: S 5 T 48 N R 12 W (Lat: 38.964758, Lng: -92.302342), Route carried "on" structure: Ramp State highway , Year Built: 1957, Status: Posted for load, Structure Length: 5.58m (18.31ft), Average Daily Traffic: 2,643 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 4,361 (year 2041), Design Load: H 20, Features Intersected: IS 70, Facility Carried by Structure: RP IS70W TO LP70W
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.468, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 4 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.4m (27.6ft)
Condition: Deck: Serious, Superstructure: Fair, Substructure: Fair, Operating Rating: 41.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 25.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.66m (2.17ft), Designated Inspection Frequency: Every 12 months, Inspection Date: March 2022, Bridge Improvement Cost: $540,000, Roadway Improvement Cost: $54,000, Total Project Cost: $810,000 ( Estimate for 2022), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 6616, Location: S 8 T 48 N R 11 W (Lat: 38.958761, Lng: -92.184258), Route carried "on" structure: Interstate 70, Year Built: 1961, Year Reconstructed: 1987, Status: Open, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 19,089 (year 2021), Truck Traffic: 32%, Average Future Daily Traffic: 31,497 (year 2041), Design Load: HS 20+Mod, Features Intersected: LIT CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 185.530, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.5m (47.6ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.5m (41.0ft), Out-to-Out Width: 13.3m (43.6ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 49.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Bituminous
Structure Number: 6616, Location: S 8 T 48 N R 11 W (Lat: 38.958761, Lng: -92.184258), Route carried "on" structure: Interstate 70, Year Built: 1961, Year Reconstructed: 1987, Status: Open, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 19,089 (year 2021), Truck Traffic: 32%, Average Future Daily Traffic: 31,497 (year 2041), Design Load: HS 20+Mod, Features Intersected: LIT CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 185.530, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 11.6m (38.1ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.5m (47.6ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 12.5m (41.0ft), Out-to-Out Width: 13.3m (43.6ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 49.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up, Deck Protection: Bituminous
Find on map >> Show street view
Structure Number: 6687, Location: S 8 T 48 N R 12 W (Lat: 38.962642, Lng: -92.295667), Route carried "on" structure: Ramp State highway , Year Built: 1957, Year Reconstructed: 2004, Status: Open, Structure Length: 5.85m (19.19ft), Average Daily Traffic: 11,561 (year 2021), Truck Traffic: 18%, Average Future Daily Traffic: 19,076 (year 2041), Design Load: HS 20, Features Intersected: HINKSON CREEK, Facility Carried by Structure: RP US63C TO IS70W
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.301, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.8m (51.8ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 16.0m (52.5ft), Curb-To-Curb Width: 11.9m (39.0ft), Out-to-Out Width: 13.0m (42.7ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 45.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete, Membrane: Built-up
Structure Number: 6687, Location: S 8 T 48 N R 12 W (Lat: 38.962642, Lng: -92.295667), Route carried "on" structure: Ramp State highway , Year Built: 1957, Year Reconstructed: 2004, Status: Open, Structure Length: 5.85m (19.19ft), Average Daily Traffic: 11,561 (year 2021), Truck Traffic: 18%, Average Future Daily Traffic: 19,076 (year 2041), Design Load: HS 20, Features Intersected: HINKSON CREEK, Facility Carried by Structure: RP US63C TO IS70W
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.301, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.8m (51.8ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 5, Length of Maximum Span: 16.0m (52.5ft), Curb-To-Curb Width: 11.9m (39.0ft), Out-to-Out Width: 13.0m (42.7ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 45.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 27.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete, Membrane: Built-up
Find on map >> Show street view
Structure Number: 722, Location: S 3 T 62 N R 20 W (Lat: 40.207753, Lng: -93.129358), Route carried "on" structure: State highway OO, Year Built: 1962, Status: Open, Structure Length: 4.30m (14.11ft), Average Daily Traffic: 1,481 (year 2021), Truck Traffic: 8%, Average Future Daily Traffic: 1,851 (year 2041), Design Load: H 15, Features Intersected: MO 5
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 11.988, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 15.2m (49.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.4m (34.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Very good, Operating Rating: 42.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 16.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Structure Number: 722, Location: S 3 T 62 N R 20 W (Lat: 40.207753, Lng: -93.129358), Route carried "on" structure: State highway OO, Year Built: 1962, Status: Open, Structure Length: 4.30m (14.11ft), Average Daily Traffic: 1,481 (year 2021), Truck Traffic: 8%, Average Future Daily Traffic: 1,851 (year 2041), Design Load: H 15, Features Intersected: MO 5
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 11.988, Lanes on structure: 2, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 15.2m (49.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.4m (34.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Very good, Operating Rating: 42.3 metric tons, Method Used To Determine Operating Rating: Allowable Stress (AS), Inventory Rating: 16.2 metric tons, Method Used To Determine Inventory Rating: Allowable Stress (AS), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >> Show street view
Structure Number: 722, Location: S 8 T 48 N R 13 W (Lat: 38.964328, Lng: -92.401925), Route carried "on" structure: State highway ZZ, Year Built: 1958, Status: Open, Structure Length: 1.08m (3.54ft), Average Daily Traffic: 434 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 760 (year 2041), Design Load: H 10, Features Intersected: HUTH CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.668, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.4m (11.2ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.9m (25.9ft)
Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 41.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021
Structure Number: 722, Location: S 8 T 48 N R 13 W (Lat: 38.964328, Lng: -92.401925), Route carried "on" structure: State highway ZZ, Year Built: 1958, Status: Open, Structure Length: 1.08m (3.54ft), Average Daily Traffic: 434 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 760 (year 2041), Design Load: H 10, Features Intersected: HUTH CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.668, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.4m (11.2ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.9m (25.9ft)
Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 41.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 24.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021
Find on map >> Show street view
Structure Number: 7256, Location: S 2 T 50 N R 11 W (Lat: 39.148717, Lng: -92.110514), Route carried "on" structure: State highway FF, Year Built: 1961, Status: Open, Structure Length: 0.75m (2.46ft), Average Daily Traffic: 566 (year 2021), Truck Traffic: 11%, Average Future Daily Traffic: 991 (year 2041), Design Load: H 15, Features Intersected: YOUNGS BR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.290, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.7m (12.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.9m (25.9ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 57.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021
Structure Number: 7256, Location: S 2 T 50 N R 11 W (Lat: 39.148717, Lng: -92.110514), Route carried "on" structure: State highway FF, Year Built: 1961, Status: Open, Structure Length: 0.75m (2.46ft), Average Daily Traffic: 566 (year 2021), Truck Traffic: 11%, Average Future Daily Traffic: 991 (year 2041), Design Load: H 15, Features Intersected: YOUNGS BR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.290, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.7m (12.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 7.9m (25.9ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 57.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2021
Find on map >> Show street view
Structure Number: 7302, Location: S 11 T 49 N R 12 W (Lat: 39.036239, Lng: -92.240228), Route carried "on" structure: State highway HH, Year Built: 1961, Year Reconstructed: 2019, Status: Posted for load, Structure Length: 5.30m (17.39ft), Average Daily Traffic: 647 (year 2021), Truck Traffic: 17%, Average Future Daily Traffic: 1,132 (year 2041), Design Load: H 15, Features Intersected: HINKSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.659, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 6.8m (22.3ft)
Condition: Deck: Excellent, Superstructure: Satisfactory, Substructure: Good, Channel: Satisfactory, Operating Rating: 48.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 7302, Location: S 11 T 49 N R 12 W (Lat: 39.036239, Lng: -92.240228), Route carried "on" structure: State highway HH, Year Built: 1961, Year Reconstructed: 2019, Status: Posted for load, Structure Length: 5.30m (17.39ft), Average Daily Traffic: 647 (year 2021), Truck Traffic: 17%, Average Future Daily Traffic: 1,132 (year 2041), Design Load: H 15, Features Intersected: HINKSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.659, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 3 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 6.8m (22.3ft)
Condition: Deck: Excellent, Superstructure: Satisfactory, Substructure: Good, Channel: Satisfactory, Operating Rating: 48.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 7394, Location: S 8 T 48 N R 11 W (Lat: 38.958389, Lng: -92.184194), Route carried "on" structure: ServiceState highway 70, Year Built: 1961, Status: Posted for load, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 369 (year 2021), Truck Traffic: 7%, Average Future Daily Traffic: 646 (year 2041), Design Load: H 15, Features Intersected: LIT CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.561, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 13.7m (44.9ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 6.8m (22.3ft)
Condition: Deck: Serious, Superstructure: Serious, Substructure: Good, Channel: Good, Operating Rating: 26.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 16.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.50m (1.64ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $394,000, Roadway Improvement Cost: $39,000, Total Project Cost: $590,000 ( Estimate for 2022), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 7394, Location: S 8 T 48 N R 11 W (Lat: 38.958389, Lng: -92.184194), Route carried "on" structure: ServiceState highway 70, Year Built: 1961, Status: Posted for load, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 369 (year 2021), Truck Traffic: 7%, Average Future Daily Traffic: 646 (year 2041), Design Load: H 15, Features Intersected: LIT CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.561, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 13.7m (44.9ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 6.8m (22.3ft)
Condition: Deck: Serious, Superstructure: Serious, Substructure: Good, Channel: Good, Operating Rating: 26.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 16.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.50m (1.64ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $394,000, Roadway Improvement Cost: $39,000, Total Project Cost: $590,000 ( Estimate for 2022), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 8098, Location: S 7 T 48 N R 13 W (Lat: 38.969458, Lng: -92.426378), Route carried "on" structure: State highway UU, Year Built: 1960, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 2,014 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 3,525 (year 2041), Design Load: H 15, Features Intersected: CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.500, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 8.8m (28.9ft)
Condition: Channel: Fair, Culverts: Satisfactory, Operating Rating: 71.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021
Structure Number: 8098, Location: S 7 T 48 N R 13 W (Lat: 38.969458, Lng: -92.426378), Route carried "on" structure: State highway UU, Year Built: 1960, Status: Open, Structure Length: 0.67m (2.20ft), Average Daily Traffic: 2,014 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 3,525 (year 2041), Design Load: H 15, Features Intersected: CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.500, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 8.2m (26.9ft), Out-to-Out Width: 8.8m (28.9ft)
Condition: Channel: Fair, Culverts: Satisfactory, Operating Rating: 71.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021
Find on map >> Show street view
Structure Number: 8803, Location: S 11 T 47 N R 13 W (Lat: 38.874850, Lng: -92.362275), Route carried "on" structure: State highway K, Year Built: 1933, Status: Open, Structure Length: 0.63m (2.07ft), Average Daily Traffic: 8,035 (year 2021), Truck Traffic: 4%, Average Future Daily Traffic: 14,865 (year 2041), Design Load: H 10, Features Intersected: SUTTON BR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.261, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 6.7m (22.0ft)
Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 38.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.12m (0.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $250,000, Roadway Improvement Cost: $25,000, Total Project Cost: $375,000 ( Estimate for 2022)
Structure Number: 8803, Location: S 11 T 47 N R 13 W (Lat: 38.874850, Lng: -92.362275), Route carried "on" structure: State highway K, Year Built: 1933, Status: Open, Structure Length: 0.63m (2.07ft), Average Daily Traffic: 8,035 (year 2021), Truck Traffic: 4%, Average Future Daily Traffic: 14,865 (year 2041), Design Load: H 10, Features Intersected: SUTTON BR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 8.261, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 6.7m (22.0ft)
Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 38.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.12m (0.39ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $250,000, Roadway Improvement Cost: $25,000, Total Project Cost: $375,000 ( Estimate for 2022)
Find on map >> Show street view
Structure Number: 8804, Location: S 9 T 47 N R 13 W (Lat: 38.870717, Lng: -92.383183), Route carried "on" structure: State highway K, Year Built: 1933, Status: Open, Structure Length: 0.65m (2.13ft), Average Daily Traffic: 7,147 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 13,222 (year 2041), Design Load: H 10, Features Intersected: UNION CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.492, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 6.7m (22.0ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 38.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.13m (0.43ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $250,000, Roadway Improvement Cost: $25,000, Total Project Cost: $375,000 ( Estimate for 2022)
Structure Number: 8804, Location: S 9 T 47 N R 13 W (Lat: 38.870717, Lng: -92.383183), Route carried "on" structure: State highway K, Year Built: 1933, Status: Open, Structure Length: 0.65m (2.13ft), Average Daily Traffic: 7,147 (year 2021), Truck Traffic: 5%, Average Future Daily Traffic: 13,222 (year 2041), Design Load: H 10, Features Intersected: UNION CR
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.492, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 1 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 6.7m (22.0ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 38.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 0.13m (0.43ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $250,000, Roadway Improvement Cost: $25,000, Total Project Cost: $375,000 ( Estimate for 2022)
Find on map >> Show street view
Structure Number: 9482, Location: S 9 T 47 N R 12 W (Lat: 38.868650, Lng: -92.270408), Route carried "on" structure: State highway 163, Year Built: 1958, Status: Posted for load, Structure Length: 1.04m (3.41ft), Average Daily Traffic: 1,067 (year 2021), Truck Traffic: 21%, Average Future Daily Traffic: 1,867 (year 2041), Features Intersected: BONNE FEMME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 17.181, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Concrete, Design/Construction: Channel Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.4m (34.1ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.3m (24.0ft)
Condition: Deck: Poor, Superstructure: Poor, Substructure: Satisfactory, Channel: Fair, Operating Rating: 25.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 15.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 0.17m (0.56ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $195,000, Roadway Improvement Cost: $19,000, Total Project Cost: $292,000 ( Estimate for 2022), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up
Structure Number: 9482, Location: S 9 T 47 N R 12 W (Lat: 38.868650, Lng: -92.270408), Route carried "on" structure: State highway 163, Year Built: 1958, Status: Posted for load, Structure Length: 1.04m (3.41ft), Average Daily Traffic: 1,067 (year 2021), Truck Traffic: 21%, Average Future Daily Traffic: 1,867 (year 2041), Features Intersected: BONNE FEMME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 17.181, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Concrete, Design/Construction: Channel Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.4m (34.1ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.3m (24.0ft)
Condition: Deck: Poor, Superstructure: Poor, Substructure: Satisfactory, Channel: Fair, Operating Rating: 25.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 15.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below), Length Of Structure Improvement: 0.17m (0.56ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2021, Bridge Improvement Cost: $195,000, Roadway Improvement Cost: $19,000, Total Project Cost: $292,000 ( Estimate for 2022), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Built-up
Find on map >> Show street view
Structure Number: 143, Location: S 7 T 48 N R 13 W (Lat: 38.971742, Lng: -92.430917), Route carried "under" structure: Interstate 70, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 18,158 (year 2021), Truck Traffic: 24%, Features Intersected: IS 70, Facility Carried by Structure: US 40 E
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 195.022, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 143, Location: S 7 T 48 N R 13 W (Lat: 38.971742, Lng: -92.430917), Route carried "under" structure: Interstate 70, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 18,158 (year 2021), Truck Traffic: 24%, Features Intersected: IS 70, Facility Carried by Structure: US 40 E
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 195.022, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 143, Location: S 7 T 48 N R 13 W (Lat: 38.971742, Lng: -92.430917), Route carried "under" structure: Interstate 70, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 22,237 (year 2021), Truck Traffic: 24%, Features Intersected: IS 70, Facility Carried by Structure: US 40 E
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 207.324, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 143, Location: S 7 T 48 N R 13 W (Lat: 38.971742, Lng: -92.430917), Route carried "under" structure: Interstate 70, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 22,237 (year 2021), Truck Traffic: 24%, Features Intersected: IS 70, Facility Carried by Structure: US 40 E
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 207.324, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 2064, Location: S 29 T 48 N R 12 W (Lat: 38.912861, Lng: -92.293653), Route carried "under" structure: US 63, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 16,391 (year 2021), Truck Traffic: 8%, Features Intersected: US 63, Facility Carried by Structure: RT AC E
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 344.661, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 2064, Location: S 29 T 48 N R 12 W (Lat: 38.912861, Lng: -92.293653), Route carried "under" structure: US 63, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 16,391 (year 2021), Truck Traffic: 8%, Features Intersected: US 63, Facility Carried by Structure: RT AC E
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 344.661, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 21.3m (69.9ft)
Find on map >> Show street view
Structure Number: 2064, Location: S 29 T 48 N R 12 W (Lat: 38.912861, Lng: -92.293653), Route carried "under" structure: US 63, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 25,284 (year 2021), Truck Traffic: 10%, Features Intersected: US 63, Facility Carried by Structure: RT AC E
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 198.886, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 2064, Location: S 29 T 48 N R 12 W (Lat: 38.912861, Lng: -92.293653), Route carried "under" structure: US 63, Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 25,284 (year 2021), Truck Traffic: 10%, Features Intersected: US 63, Facility Carried by Structure: RT AC E
Minimum Vertical Clearance: 4.70m (15.42ft), Kilometerpoint: 198.886, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 21.3m (69.9ft)
Find on map >> Show street view
Structure Number: 2886, Location: S 17 T 48 N R 12 W (Lat: 38.946406, Lng: -92.293675), Route carried "under" structure: US 63, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 30,979 (year 2021), Truck Traffic: 8%, Features Intersected: US 63, Facility Carried by Structure: RT WW E
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 348.391, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 34.3m (112.5ft)
Structure Number: 2886, Location: S 17 T 48 N R 12 W (Lat: 38.946406, Lng: -92.293675), Route carried "under" structure: US 63, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 30,979 (year 2021), Truck Traffic: 8%, Features Intersected: US 63, Facility Carried by Structure: RT WW E
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 348.391, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 34.3m (112.5ft)
Find on map >> Show street view
Structure Number: 2886, Location: S 17 T 48 N R 12 W (Lat: 38.946406, Lng: -92.293675), Route carried "under" structure: US 63, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 26,946 (year 2021), Truck Traffic: 10%, Features Intersected: US 63, Facility Carried by Structure: RT WW E
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 195.154, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 34.3m (112.5ft)
Structure Number: 2886, Location: S 17 T 48 N R 12 W (Lat: 38.946406, Lng: -92.293675), Route carried "under" structure: US 63, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 26,946 (year 2021), Truck Traffic: 10%, Features Intersected: US 63, Facility Carried by Structure: RT WW E
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 195.154, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 34.3m (112.5ft)
Find on map >> Show street view
Structure Number: 289, Location: S 20 T 48 N R 12 W (Lat: 38.932233, Lng: -92.294758), Route carried "under" structure: State highway 740, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 10,212 (year 2021), Truck Traffic: 7%, Features Intersected: MO 740, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.87m (19.26ft), Kilometerpoint: 0.365, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 19.8m (65.0ft)
Structure Number: 289, Location: S 20 T 48 N R 12 W (Lat: 38.932233, Lng: -92.294758), Route carried "under" structure: State highway 740, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 10,212 (year 2021), Truck Traffic: 7%, Features Intersected: MO 740, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.87m (19.26ft), Kilometerpoint: 0.365, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 19.8m (65.0ft)
Find on map >> Show street view
Structure Number: 289, Location: S 20 T 48 N R 12 W (Lat: 38.932233, Lng: -92.294758), Route carried "under" structure: State highway 740, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 9,350 (year 2021), Truck Traffic: 9%, Features Intersected: MO 740, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 10.149, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 19.8m (65.0ft)
Structure Number: 289, Location: S 20 T 48 N R 12 W (Lat: 38.932233, Lng: -92.294758), Route carried "under" structure: State highway 740, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 9,350 (year 2021), Truck Traffic: 9%, Features Intersected: MO 740, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.13m (16.83ft), Kilometerpoint: 10.149, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 19.8m (65.0ft)
Find on map >> Show street view
Structure Number: 2891, Location: S 20 T 48 N R 12 W (Lat: 38.932158, Lng: -92.295078), Route carried "under" structure: State highway 740, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 9,350 (year 2021), Truck Traffic: 9%, Features Intersected: MO 740, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 10.124, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 19.8m (65.0ft)
Structure Number: 2891, Location: S 20 T 48 N R 12 W (Lat: 38.932158, Lng: -92.295078), Route carried "under" structure: State highway 740, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 9,350 (year 2021), Truck Traffic: 9%, Features Intersected: MO 740, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 10.124, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 19.8m (65.0ft)
Find on map >> Show street view
Structure Number: 2891, Location: S 20 T 48 N R 12 W (Lat: 38.932158, Lng: -92.295078), Route carried "under" structure: State highway 740, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 10,212 (year 2021), Truck Traffic: 7%, Features Intersected: MO 740, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 6.73m (22.08ft), Kilometerpoint: 0.393, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 19.8m (65.0ft)
Structure Number: 2891, Location: S 20 T 48 N R 12 W (Lat: 38.932158, Lng: -92.295078), Route carried "under" structure: State highway 740, Year Built: 1976, Structure Length: 0. m, Average Daily Traffic: 10,212 (year 2021), Truck Traffic: 7%, Features Intersected: MO 740, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 6.73m (22.08ft), Kilometerpoint: 0.393, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 19.8m (65.0ft)
Find on map >> Show street view
Structure Number: 29218, Location: S 1 T 48 N R 13 W (Lat: 38.976656, Lng: -92.282708), Route carried "under" structure: US 63, Year Built: 2002, Structure Length: 0. m, Average Daily Traffic: 18,924 (year 2021), Truck Traffic: 24%, Features Intersected: US 63, Facility Carried by Structure: VANDIVER DR E
Minimum Vertical Clearance: 6.43m (21.10ft), Kilometerpoint: 191.371, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.9m (98.1ft)
Structure Number: 29218, Location: S 1 T 48 N R 13 W (Lat: 38.976656, Lng: -92.282708), Route carried "under" structure: US 63, Year Built: 2002, Structure Length: 0. m, Average Daily Traffic: 18,924 (year 2021), Truck Traffic: 24%, Features Intersected: US 63, Facility Carried by Structure: VANDIVER DR E
Minimum Vertical Clearance: 6.43m (21.10ft), Kilometerpoint: 191.371, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.9m (98.1ft)
Find on map >> Show street view
Structure Number: 29218, Location: S 1 T 48 N R 13 W (Lat: 38.976656, Lng: -92.282708), Route carried "under" structure: US 63, Year Built: 2002, Structure Length: 0. m, Average Daily Traffic: 18,304 (year 2021), Truck Traffic: 8%, Features Intersected: US 63, Facility Carried by Structure: VANDIVER DR E
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 352.173, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.9m (98.1ft)
Structure Number: 29218, Location: S 1 T 48 N R 13 W (Lat: 38.976656, Lng: -92.282708), Route carried "under" structure: US 63, Year Built: 2002, Structure Length: 0. m, Average Daily Traffic: 18,304 (year 2021), Truck Traffic: 8%, Features Intersected: US 63, Facility Carried by Structure: VANDIVER DR E
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 352.173, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 29.9m (98.1ft)
Find on map >> Show street view
Structure Number: 32089, Location: S 33 T 48 N R 12 W (Lat: 38.898075, Lng: -92.280631), Route carried "under" structure: US 63, Year Built: 2007, Structure Length: 0. m, Average Daily Traffic: 15,761 (year 2021), Truck Traffic: 8%, Features Intersected: US 63, Facility Carried by Structure: DISCOVERY PKWY S
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 342.578, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.3m (99.4ft)
Structure Number: 32089, Location: S 33 T 48 N R 12 W (Lat: 38.898075, Lng: -92.280631), Route carried "under" structure: US 63, Year Built: 2007, Structure Length: 0. m, Average Daily Traffic: 15,761 (year 2021), Truck Traffic: 8%, Features Intersected: US 63, Facility Carried by Structure: DISCOVERY PKWY S
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 342.578, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.3m (99.4ft)
Find on map >> Show street view
Structure Number: 32089, Location: S 33 T 48 N R 12 W (Lat: 38.898075, Lng: -92.280631), Route carried "under" structure: US 63, Year Built: 2007, Structure Length: 0. m, Average Daily Traffic: 16,879 (year 2021), Truck Traffic: 10%, Features Intersected: US 63, Facility Carried by Structure: DISCOVERY PKWY S
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 200.995, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.3m (99.4ft)
Structure Number: 32089, Location: S 33 T 48 N R 12 W (Lat: 38.898075, Lng: -92.280631), Route carried "under" structure: US 63, Year Built: 2007, Structure Length: 0. m, Average Daily Traffic: 16,879 (year 2021), Truck Traffic: 10%, Features Intersected: US 63, Facility Carried by Structure: DISCOVERY PKWY S
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 200.995, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.3m (99.4ft)
Find on map >> Show street view
Structure Number: 33, Location: S 5 T 48 N R 13 W (Lat: 38.970836, Lng: -92.401272), Route carried "under" structure: Interstate 70, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 22,268 (year 2021), Truck Traffic: 24%, Features Intersected: IS 70, Facility Carried by Structure: SORRELS OVERPASS D
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 197.576, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.4m (76.8ft)
Structure Number: 33, Location: S 5 T 48 N R 13 W (Lat: 38.970836, Lng: -92.401272), Route carried "under" structure: Interstate 70, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 22,268 (year 2021), Truck Traffic: 24%, Features Intersected: IS 70, Facility Carried by Structure: SORRELS OVERPASS D
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 197.576, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.4m (76.8ft)
Find on map >> Show street view
Structure Number: 33, Location: S 5 T 48 N R 13 W (Lat: 38.970836, Lng: -92.401272), Route carried "under" structure: Interstate 70, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 22,237 (year 2021), Truck Traffic: 24%, Features Intersected: IS 70, Facility Carried by Structure: SORRELS OVERPASS D
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 204.751, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.4m (76.8ft)
Structure Number: 33, Location: S 5 T 48 N R 13 W (Lat: 38.970836, Lng: -92.401272), Route carried "under" structure: Interstate 70, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 22,237 (year 2021), Truck Traffic: 24%, Features Intersected: IS 70, Facility Carried by Structure: SORRELS OVERPASS D
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 204.751, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.4m (76.8ft)
Find on map >> Show street view
Structure Number: 3312, Location: S 29 T 49 N R 12 W (Lat: 39.000936, Lng: -92.301272), Route carried "under" structure: US 63, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 12,210 (year 2021), Truck Traffic: 19%, Features Intersected: US 63, Facility Carried by Structure: OAKLAND GRAVEL RD
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 355.582, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Structure Number: 3312, Location: S 29 T 49 N R 12 W (Lat: 39.000936, Lng: -92.301272), Route carried "under" structure: US 63, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 12,210 (year 2021), Truck Traffic: 19%, Features Intersected: US 63, Facility Carried by Structure: OAKLAND GRAVEL RD
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 355.582, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Find on map >> Show street view
Structure Number: 3312, Location: S 29 T 49 N R 12 W (Lat: 39.000936, Lng: -92.301272), Route carried "under" structure: US 63, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 8,824 (year 2021), Truck Traffic: 14%, Features Intersected: US 63, Facility Carried by Structure: OAKLAND GRAVEL RD
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 187.989, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Structure Number: 3312, Location: S 29 T 49 N R 12 W (Lat: 39.000936, Lng: -92.301272), Route carried "under" structure: US 63, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 8,824 (year 2021), Truck Traffic: 14%, Features Intersected: US 63, Facility Carried by Structure: OAKLAND GRAVEL RD
Minimum Vertical Clearance: 5.21m (17.09ft), Kilometerpoint: 187.989, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.5m (123.0ft)
Find on map >> Show street view
Structure Number: 3313, Location: S 19 T 49 N R 12 W (Lat: 39.014850, Lng: -92.306450), Route carried "under" structure: US 63, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 8,429 (year 2021), Truck Traffic: 20%, Features Intersected: US 63, Facility Carried by Structure: PRATHERSVILLE RD E
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 357.199, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft)
Structure Number: 3313, Location: S 19 T 49 N R 12 W (Lat: 39.014850, Lng: -92.306450), Route carried "under" structure: US 63, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 8,429 (year 2021), Truck Traffic: 20%, Features Intersected: US 63, Facility Carried by Structure: PRATHERSVILLE RD E
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 357.199, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft)
Find on map >> Show street view
Structure Number: 3313, Location: S 19 T 49 N R 12 W (Lat: 39.014850, Lng: -92.306450), Route carried "under" structure: US 63, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 6,331 (year 2021), Truck Traffic: 25%, Features Intersected: US 63, Facility Carried by Structure: PRATHERSVILLE RD E
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 186.351, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft)
Structure Number: 3313, Location: S 19 T 49 N R 12 W (Lat: 39.014850, Lng: -92.306450), Route carried "under" structure: US 63, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 6,331 (year 2021), Truck Traffic: 25%, Features Intersected: US 63, Facility Carried by Structure: PRATHERSVILLE RD E
Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 186.351, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft)
Find on map >> Show street view
Structure Number: 3314, Location: S 18 T 49 N R 12 W (Lat: 39.022336, Lng: -92.318325), Route carried "under" structure: US 63, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 6,331 (year 2021), Truck Traffic: 25%, Features Intersected: US 63, Facility Carried by Structure: WAGON TRAIL RD S
Minimum Vertical Clearance: 5.66m (18.57ft), Kilometerpoint: 185.015, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.4m (129.3ft)
Structure Number: 3314, Location: S 18 T 49 N R 12 W (Lat: 39.022336, Lng: -92.318325), Route carried "under" structure: US 63, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 6,331 (year 2021), Truck Traffic: 25%, Features Intersected: US 63, Facility Carried by Structure: WAGON TRAIL RD S
Minimum Vertical Clearance: 5.66m (18.57ft), Kilometerpoint: 185.015, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.4m (129.3ft)
Find on map >> Show street view
Structure Number: 3314, Location: S 18 T 49 N R 12 W (Lat: 39.022336, Lng: -92.318325), Route carried "under" structure: US 63, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 7,079 (year 2021), Truck Traffic: 18%, Features Intersected: US 63, Facility Carried by Structure: WAGON TRAIL RD S
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 358.566, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.4m (129.3ft)
Structure Number: 3314, Location: S 18 T 49 N R 12 W (Lat: 39.022336, Lng: -92.318325), Route carried "under" structure: US 63, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 7,079 (year 2021), Truck Traffic: 18%, Features Intersected: US 63, Facility Carried by Structure: WAGON TRAIL RD S
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 358.566, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.4m (129.3ft)
Find on map >> Show street view
Structure Number: 3315, Location: S 13 T 49 N R 13 W (Lat: 39.024531, Lng: -92.322642), Route carried "under" structure: State highway 763, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 2,367 (year 2021), Truck Traffic: 6%, Features Intersected: MO 763, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 10.396, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Structure Number: 3315, Location: S 13 T 49 N R 13 W (Lat: 39.024531, Lng: -92.322642), Route carried "under" structure: State highway 763, Year Built: 1985, Structure Length: 0. m, Average Daily Traffic: 2,367 (year 2021), Truck Traffic: 6%, Features Intersected: MO 763, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 10.396, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Find on map >> Show street view
Structure Number: 3316, Location: S 13 T 49 N R 13 W (Lat: 39.024903, Lng: -92.322708), Route carried "under" structure: State highway 763, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 2,367 (year 2021), Truck Traffic: 6%, Features Intersected: MO 763, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 10.437, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 43.0m (141.1ft)
Structure Number: 3316, Location: S 13 T 49 N R 13 W (Lat: 39.024903, Lng: -92.322708), Route carried "under" structure: State highway 763, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 2,367 (year 2021), Truck Traffic: 6%, Features Intersected: MO 763, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 10.437, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 43.0m (141.1ft)
Find on map >> Show street view
Structure Number: 3354, Location: S 29 T 49 N R 12 W (Lat: 38.993117, Lng: -92.291911), Route carried "under" structure: City street , Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 4,200 (year 2021), Truck Traffic: 4%, Features Intersected: CST BROWN STATION RD, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 4.675, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.6m (67.6ft)
Structure Number: 3354, Location: S 29 T 49 N R 12 W (Lat: 38.993117, Lng: -92.291911), Route carried "under" structure: City street , Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 4,200 (year 2021), Truck Traffic: 4%, Features Intersected: CST BROWN STATION RD, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 4.675, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.6m (67.6ft)
Find on map >> Show street view
Structure Number: 3355, Location: S 29 T 49 N R 12 W (Lat: 38.992875, Lng: -92.292047), Route carried "under" structure: City street , Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 4,200 (year 2021), Truck Traffic: 4%, Features Intersected: CST BROWN STATION RD, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 4.703, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.7m (74.5ft)
Structure Number: 3355, Location: S 29 T 49 N R 12 W (Lat: 38.992875, Lng: -92.292047), Route carried "under" structure: City street , Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 4,200 (year 2021), Truck Traffic: 4%, Features Intersected: CST BROWN STATION RD, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 4.703, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 22.7m (74.5ft)
Find on map >> Show street view
Structure Number: 3356, Location: S 32 T 49 N R 12 W (Lat: 38.988264, Lng: -92.285733), Route carried "under" structure: State highway B, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 21,447 (year 2021), Truck Traffic: 4%, Features Intersected: RT B, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 15.999, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Structure Number: 3356, Location: S 32 T 49 N R 12 W (Lat: 38.988264, Lng: -92.285733), Route carried "under" structure: State highway B, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 21,447 (year 2021), Truck Traffic: 4%, Features Intersected: RT B, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 15.999, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Find on map >> Show street view
Structure Number: 3357, Location: S 32 T 49 N R 12 W (Lat: 38.988053, Lng: -92.285917), Route carried "under" structure: State highway B, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 17,043 (year 2021), Truck Traffic: 4%, Features Intersected: RT B, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 16.029, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Structure Number: 3357, Location: S 32 T 49 N R 12 W (Lat: 38.988053, Lng: -92.285917), Route carried "under" structure: State highway B, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 17,043 (year 2021), Truck Traffic: 4%, Features Intersected: RT B, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 5.44m (17.85ft), Kilometerpoint: 16.029, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Find on map >> Show street view
Structure Number: 3358, Location: S 33 T 49 N R 12 W (Lat: 38.981147, Lng: -92.281056), Route carried "under" structure: US 63, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 18,304 (year 2021), Truck Traffic: 8%, Features Intersected: US 63, Facility Carried by Structure: MEXICO GRAVEL RD E
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 352.704, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Structure Number: 3358, Location: S 33 T 49 N R 12 W (Lat: 38.981147, Lng: -92.281056), Route carried "under" structure: US 63, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 18,304 (year 2021), Truck Traffic: 8%, Features Intersected: US 63, Facility Carried by Structure: MEXICO GRAVEL RD E
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 352.704, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Find on map >> Show street view
Structure Number: 3358, Location: S 33 T 49 N R 12 W (Lat: 38.981147, Lng: -92.281056), Route carried "under" structure: US 63, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 18,924 (year 2021), Truck Traffic: 24%, Features Intersected: US 63, Facility Carried by Structure: MEXICO GRAVEL RD E
Minimum Vertical Clearance: 6.07m (19.91ft), Kilometerpoint: 190.844, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Structure Number: 3358, Location: S 33 T 49 N R 12 W (Lat: 38.981147, Lng: -92.281056), Route carried "under" structure: US 63, Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 18,924 (year 2021), Truck Traffic: 24%, Features Intersected: US 63, Facility Carried by Structure: MEXICO GRAVEL RD E
Minimum Vertical Clearance: 6.07m (19.91ft), Kilometerpoint: 190.844, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Find on map >> Show street view
Structure Number: 3359, Location: S 5 T 48 N R 12 W (Lat: 38.970228, Lng: -92.291106), Route carried "under" structure: US 63, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 12,600 (year 2021), Truck Traffic: 6%, Features Intersected: US 63
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 192.372, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 3359, Location: S 5 T 48 N R 12 W (Lat: 38.970228, Lng: -92.291106), Route carried "under" structure: US 63, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 12,600 (year 2021), Truck Traffic: 6%, Features Intersected: US 63
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 192.372, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 3359, Location: S 5 T 48 N R 12 W (Lat: 38.970228, Lng: -92.291106), Route carried "under" structure: US 63, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 11,323 (year 2021), Truck Traffic: 7%, Features Intersected: US 63
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 351.127, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 3359, Location: S 5 T 48 N R 12 W (Lat: 38.970228, Lng: -92.291106), Route carried "under" structure: US 63, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 11,323 (year 2021), Truck Traffic: 7%, Features Intersected: US 63
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 351.127, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 3361, Location: S 8 T 48 N R 12 W (Lat: 38.962717, Lng: -92.294525), Route carried "under" structure: Interstate 70, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 25,676 (year 2021), Truck Traffic: 30%, Features Intersected: IS 70, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.66m (18.57ft), Kilometerpoint: 207.211, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 3361, Location: S 8 T 48 N R 12 W (Lat: 38.962717, Lng: -92.294525), Route carried "under" structure: Interstate 70, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 25,676 (year 2021), Truck Traffic: 30%, Features Intersected: IS 70, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.66m (18.57ft), Kilometerpoint: 207.211, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Find on map >> Show street view
Structure Number: 3361, Location: S 8 T 48 N R 12 W (Lat: 38.962717, Lng: -92.294525), Route carried "under" structure: Ramp State highway , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 11,561 (year 2021), Truck Traffic: 18%, Features Intersected: RP US63C TO IS70W, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 6.30m (20.67ft), Kilometerpoint: 0.225, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 3361, Location: S 8 T 48 N R 12 W (Lat: 38.962717, Lng: -92.294525), Route carried "under" structure: Ramp State highway , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 11,561 (year 2021), Truck Traffic: 18%, Features Intersected: RP US63C TO IS70W, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 6.30m (20.67ft), Kilometerpoint: 0.225, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Find on map >> Show street view
Structure Number: 3361, Location: S 8 T 48 N R 12 W (Lat: 38.962717, Lng: -92.294525), Route carried "under" structure: Ramp State highway , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 14,508 (year 2021), Truck Traffic: 18%, Features Intersected: RP IS70E TO US63C, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 0.095, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 3361, Location: S 8 T 48 N R 12 W (Lat: 38.962717, Lng: -92.294525), Route carried "under" structure: Ramp State highway , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 14,508 (year 2021), Truck Traffic: 18%, Features Intersected: RP IS70E TO US63C, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 0.095, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Find on map >> Show street view
Structure Number: 3361, Location: S 8 T 48 N R 12 W (Lat: 38.962717, Lng: -92.294525), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 7,244 (year 2021), Truck Traffic: 5%, Features Intersected: CST CLARK LN, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 1.265, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 3361, Location: S 8 T 48 N R 12 W (Lat: 38.962717, Lng: -92.294525), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 7,244 (year 2021), Truck Traffic: 5%, Features Intersected: CST CLARK LN, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 4.44m (14.57ft), Kilometerpoint: 1.265, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Find on map >> Show street view
Structure Number: 3361, Location: S 8 T 48 N R 12 W (Lat: 38.962717, Lng: -92.294525), Route carried "under" structure: Interstate 70, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 26,389 (year 2021), Truck Traffic: 32%, Features Intersected: IS 70, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 195.128, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 3361, Location: S 8 T 48 N R 12 W (Lat: 38.962717, Lng: -92.294525), Route carried "under" structure: Interstate 70, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 26,389 (year 2021), Truck Traffic: 32%, Features Intersected: IS 70, Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 195.128, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Find on map >> Show street view
Structure Number: 3362, Location: S 8 T 48 N R 12 W (Lat: 38.962736, Lng: -92.294839), Route carried "under" structure: Ramp State highway , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 14,508 (year 2021), Truck Traffic: 18%, Features Intersected: RP IS70E TO US63C, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 6.10m (20.01ft), Kilometerpoint: 0.066, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 3362, Location: S 8 T 48 N R 12 W (Lat: 38.962736, Lng: -92.294839), Route carried "under" structure: Ramp State highway , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 14,508 (year 2021), Truck Traffic: 18%, Features Intersected: RP IS70E TO US63C, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 6.10m (20.01ft), Kilometerpoint: 0.066, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Find on map >> Show street view
Structure Number: 3362, Location: S 8 T 48 N R 12 W (Lat: 38.962736, Lng: -92.294839), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 7,244 (year 2021), Truck Traffic: 5%, Features Intersected: CST CLARK LN, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 3.866, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 3362, Location: S 8 T 48 N R 12 W (Lat: 38.962736, Lng: -92.294839), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 7,244 (year 2021), Truck Traffic: 5%, Features Intersected: CST CLARK LN, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 3.866, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Find on map >> Show street view
Structure Number: 3362, Location: S 8 T 48 N R 12 W (Lat: 38.962736, Lng: -92.294839), Route carried "under" structure: Ramp State highway , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 11,561 (year 2021), Truck Traffic: 18%, Features Intersected: RP US63C TO IS70W, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 6.25m (20.51ft), Kilometerpoint: 0.254, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 3362, Location: S 8 T 48 N R 12 W (Lat: 38.962736, Lng: -92.294839), Route carried "under" structure: Ramp State highway , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 11,561 (year 2021), Truck Traffic: 18%, Features Intersected: RP US63C TO IS70W, Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 6.25m (20.51ft), Kilometerpoint: 0.254, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 35.1m (115.2ft)