Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Columbia, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 255Number of bridges
  • 2,582ft / 787mTotal length
  • $8,034,000Total costs
  • 2,451,720Total average daily traffic
  • 382,857Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Columbia
  • No street view available for this location

New bridges in Columbia, MO - historical statistics
  • New bridges - historical statistics
  • 61920-1929
  • 31930-1939
  • 31940-1949
  • 241950-1959
  • 221960-1969
  • 301970-1979
  • 671980-1989
  • 321990-1999
  • 302000-2009
  • 362010-2019
  • 22020-2022
Reconstructed bridges in Columbia, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 81970-1979
  • 61980-1989
  • 51990-1999
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in Columbia, MO
Average Bridge Truck Traffic in Columbia, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Excellent
  • 19.6%Very good
  • 42.5%Good
  • 20.3%Satisfactory
  • 7.8%Fair
  • 2.0%Poor
  • 2.0%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Excellent
  • 14.9%Very good
  • 45.5%Good
  • 20.1%Satisfactory
  • 6.5%Fair
  • 3.9%Poor
  • 1.9%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.6%Excellent
  • 19.5%Very good
  • 29.2%Good
  • 32.5%Satisfactory
  • 3.9%Fair
  • 1.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 1.3%Very good
  • 19.7%Good
  • 50.0%Satisfactory
  • 28.3%Fair
  • 0.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 2.8%Very good
  • 36.1%Good
  • 47.2%Satisfactory
  • 8.3%Fair
  • 2.8%Poor
  • 2.8%Serious
Find on map >>   Show street view

Structure Number: 3362,  Location: S 8 T 48 N R 12 W (Lat: 38.962736,  Lng: -92.294839),  Route carried "under" structure: Interstate 70,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 16,789 (year 2021),  Truck Traffic: 24%,  Features Intersected: IS 70,  Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 207.184,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 3362,  Location: S 8 T 48 N R 12 W (Lat: 38.962736,  Lng: -92.294839),  Route carried "under" structure: Interstate 70,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 26,389 (year 2021),  Truck Traffic: 32%,  Features Intersected: IS 70,  Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 195.159,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 3363,  Location: S 8 T 48 N R 12 W (Lat: 38.957742,  Lng: -92.293203),  Route carried "under" structure: US ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 14,395 (year 2021),  Truck Traffic: 8%,  Features Intersected: US 63C,  Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 1.904,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 3363,  Location: S 8 T 48 N R 12 W (Lat: 38.957742,  Lng: -92.293203),  Route carried "under" structure: City street ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 8,829 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST CONLEY RD,  Facility Carried by Structure: US 63 N
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 0.381,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 3364,  Location: S 8 T 48 N R 12 W (Lat: 38.957406,  Lng: -92.293389),  Route carried "under" structure: US ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 14,395 (year 2021),  Truck Traffic: 8%,  Features Intersected: US 63C,  Facility Carried by Structure: US 63 S
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 1.941,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 34363,  Location: S 7 T 48 N R 11 W (Lat: 38.958667,  Lng: -92.203972),  Route carried "under" structure: Interstate 70,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 18,385 (year 2021),  Truck Traffic: 30%,  Features Intersected: IS 70,  Facility Carried by Structure: RT Z S
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 215.084,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.9m (68.6ft)

Find on map >>   Show street view

Structure Number: 34363,  Location: S 7 T 48 N R 11 W (Lat: 38.958667,  Lng: -92.203972),  Route carried "under" structure: Interstate 70,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 19,089 (year 2021),  Truck Traffic: 32%,  Features Intersected: IS 70,  Facility Carried by Structure: RT Z S
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 187.257,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.9m (68.6ft)

Find on map >>   Show street view

Structure Number: 34762,  Location: S 6 T 48 N R 12 W (Lat: 38.963836,  Lng: -92.311564),  Route carried "under" structure: Business State highway 70,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 10,749 (year 2021),  Truck Traffic: 5%,  Features Intersected: LP 70,  Facility Carried by Structure: RT B S
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 3.729,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 35111,  Location: S 1 T 48 N R 13 W (Lat: 38.968731,  Lng: -92.324936),  Route carried "under" structure: State highway 763,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 9,400 (year 2021),  Truck Traffic: 7%,  Features Intersected: MO 763,  Facility Carried by Structure: IS 70 W
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 6.529,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 35111,  Location: S 1 T 48 N R 13 W (Lat: 38.968731,  Lng: -92.324936),  Route carried "under" structure: State highway 763,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 9,375 (year 2021),  Truck Traffic: 5%,  Features Intersected: MO 763,  Facility Carried by Structure: IS 70 W
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 4.112,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 35115,  Location: S 1 T 48 N R 13 W (Lat: 38.969336,  Lng: -92.338450),  Route carried "under" structure: City street ,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 5,289 (year 2021),  Truck Traffic: 4%,  Features Intersected: CST GARTH AVE,  Facility Carried by Structure: IS 70 W
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 1.579,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.8m (74.8ft)

Find on map >>   Show street view

Structure Number: 35122,  Location: S 2 T 48 N R 13 W (Lat: 38.966592,  Lng: -92.351372),  Route carried "under" structure: Business State highway 70,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 11,848 (year 2021),  Truck Traffic: 5%,  Features Intersected: LP 70
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.259,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>   Show street view

Structure Number: 35148,  Location: S 1 T 48 N R 13 W (Lat: 38.969228,  Lng: -92.338419),  Route carried "under" structure: City street ,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 5,289 (year 2021),  Truck Traffic: 4%,  Features Intersected: CST GARTH AVE,  Facility Carried by Structure: IS 70 E
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 1.590,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 35154,  Location: S 1 T 48 N R 13 W (Lat: 38.968614,  Lng: -92.324889),  Route carried "under" structure: State highway 763,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 9,400 (year 2021),  Truck Traffic: 7%,  Features Intersected: MO 763,  Facility Carried by Structure: IS 70 E
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 6.542,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.9m (45.6ft)

Find on map >>   Show street view

Structure Number: 36,  Location: S 10 T 48 N R 13 W (Lat: 38.968267,  Lng: -92.371136),  Route carried "under" structure: Interstate 70,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 22,268 (year 2021),  Truck Traffic: 24%,  Features Intersected: IS 70,  Facility Carried by Structure: MO 740 E
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 200.211,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 36,  Location: S 10 T 48 N R 13 W (Lat: 38.968267,  Lng: -92.371136),  Route carried "under" structure: Interstate 70,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 31,066 (year 2021),  Truck Traffic: 24%,  Features Intersected: IS 70,  Facility Carried by Structure: MO 740 E
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 202.115,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 574,  Location: S 8 T 48 N R 12 W (Lat: 38.961758,  Lng: -92.292044),  Route carried "under" structure: Interstate 70,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 26,389 (year 2021),  Truck Traffic: 32%,  Features Intersected: IS 70,  Facility Carried by Structure: US 63C S
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 194.906,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 574,  Location: S 8 T 48 N R 12 W (Lat: 38.961758,  Lng: -92.292044),  Route carried "under" structure: Interstate 70,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 25,676 (year 2021),  Truck Traffic: 30%,  Features Intersected: IS 70,  Facility Carried by Structure: US 63C S
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 207.429,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 618,  Location: S 6 T 48 N R 12 W (Lat: 38.967147,  Lng: -92.308303),  Route carried "under" structure: Interstate 70,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 25,242 (year 2021),  Truck Traffic: 24%,  Features Intersected: IS 70,  Facility Carried by Structure: RT B S
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 196.442,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 618,  Location: S 6 T 48 N R 12 W (Lat: 38.967147,  Lng: -92.308303),  Route carried "under" structure: Interstate 70,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 27,946 (year 2021),  Truck Traffic: 24%,  Features Intersected: IS 70,  Facility Carried by Structure: RT B S
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 205.874,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 65,  Location: S 1 T 48 N R 13 W (Lat: 38.969069,  Lng: -92.333669),  Route carried "under" structure: Interstate 70,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 33,755 (year 2021),  Truck Traffic: 24%,  Features Intersected: IS 70,  Facility Carried by Structure: MO 163 S
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 203.660,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 65,  Location: S 1 T 48 N R 13 W (Lat: 38.969069,  Lng: -92.333669),  Route carried "under" structure: Interstate 70,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 32,591 (year 2021),  Truck Traffic: 24%,  Features Intersected: IS 70,  Facility Carried by Structure: MO 163 S
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 198.664,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 6586,  Location: S 10 T 48 N R 12 W (Lat: 38.960119,  Lng: -92.253136),  Route carried "under" structure: Interstate 70,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 21,892 (year 2021),  Truck Traffic: 32%,  Features Intersected: IS 70,  Facility Carried by Structure: ST CHARLES RD E
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 191.528,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 6586,  Location: S 10 T 48 N R 12 W (Lat: 38.960119,  Lng: -92.253136),  Route carried "under" structure: Interstate 70,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 25,676 (year 2021),  Truck Traffic: 30%,  Features Intersected: IS 70,  Facility Carried by Structure: ST CHARLES RD E
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 210.804,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 6599,  Location: S 5 T 48 N R 12 W (Lat: 38.964758,  Lng: -92.302342),  Route carried "under" structure: Interstate 70,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 27,946 (year 2021),  Truck Traffic: 24%,  Features Intersected: IS 70
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 206.463,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Discuss Columbia, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.