Bridge Statistics for Decatur, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 115Number of bridges
  • 3,763ft / 1,147mTotal length
  • $417,653,000Total costs
  • 1,430,724Total average daily traffic
  • 205,848Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Decatur
  • No street view available for this location

New bridges in Decatur, AL - historical statistics
  • New bridges - historical statistics
  • 51920-1929
  • 51930-1939
  • 131950-1959
  • 231960-1969
  • 231970-1979
  • 151980-1989
  • 181990-1999
  • 82000-2009
  • 52010-2019
Reconstructed bridges in Decatur, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 41950-1959
  • 11960-1969
  • 21970-1979
  • 01980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Decatur, AL
Average Bridge Truck Traffic in Decatur, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.6%Very good
  • 34.0%Good
  • 36.2%Satisfactory
  • 17.0%Fair
  • 2.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.9%Very good
  • 36.2%Good
  • 36.2%Satisfactory
  • 8.5%Fair
  • 4.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.8%Very good
  • 40.4%Good
  • 29.8%Satisfactory
  • 14.9%Fair
  • 2.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.3%Very good
  • 43.8%Good
  • 21.3%Satisfactory
  • 17.5%Fair
  • 1.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.3%Very good
  • 22.2%Good
  • 33.3%Satisfactory
  • 35.2%Fair
Find on map >>   Show street view

Structure Number: 1019,  Location: JCT I 65 & I 565 (Lat: 34.627472,  Lng: -86.901056),  Route carried "on" structure: Interstate 65,  Year Built: 1970,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 17,375 (year 2018),  Truck Traffic: 27%,  Average Future Daily Traffic: 22,013 (year 2033),  Design Load: HS 20,  Features Intersected: I 565
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 547.190,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.5m (136.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.32m (30.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,450,000,  Roadway Improvement Cost: $345,000,  Total Project Cost: $3,795,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10191,  Location: 1 MI N JCT I 65 & I 565 (Lat: 34.645722,  Lng: -86.907233),  Route carried "on" structure: Interstate 65,  Year Built: 1970,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 12,830 (year 2020),  Truck Traffic: 39%,  Average Future Daily Traffic: 16,254 (year 2033),  Design Load: HS 20,  Features Intersected: SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 549.293,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.74m (22.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,986,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $2,185,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10192,  Location: 1 MI N JCT I 65 & I 565 (Lat: 34.645822,  Lng: -86.906994),  Route carried "on" structure: Interstate 65,  Year Built: 1970,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 12,830 (year 2020),  Truck Traffic: 39%,  Average Future Daily Traffic: 16,254 (year 2033),  Design Load: HS 20,  Features Intersected: SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 549.293,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.74m (22.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,986,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $2,185,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10367,  Location: JCT STRATFORD RD*BRUSH CK (Lat: 34.573400,  Lng: -86.970200),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 10,086 (year 2009),  Truck Traffic: 25%,  Average Future Daily Traffic: 12,217 (year 2029),  Design Load: H 15,  Features Intersected: BRUSH CREEK,  Facility Carried by Structure: STRATFORD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 36.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $855,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $941,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10375,  Location: 2 MI N JCT SR 67 & I 65 (Lat: 34.546342,  Lng: -86.932872),  Route carried "on" structure: State highway 67,  Year Built: 1970,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 27,570 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 35,767 (year 2033),  Design Load: HS 20,  Features Intersected: FLINT CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.593,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $2,509,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,760,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10376,  Location: 2.2 MI N JCT SR 67 & I 65 (Lat: 34.547872,  Lng: -86.936481),  Route carried "on" structure: State highway 67,  Year Built: 1970,  Status: Open,  Structure Length: 12.74m (41.80ft),  Average Daily Traffic: 27,570 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 35,767 (year 2033),  Design Load: HS 20,  Features Intersected: FLINT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.786,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.57m (44.52ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $5,490,000,  Roadway Improvement Cost: $549,000,  Total Project Cost: $6,039,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10687,  Location: 2 MI N JCT I 565 & I 65 (Lat: 34.657417,  Lng: -86.912944),  Route carried "on" structure: County highway 45,  Year Built: 1972,  Status: Open,  Structure Length: 11.06m (36.29ft),  Average Daily Traffic: 1,134 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,031 (year 2034),  Design Load: HS 20,  Features Intersected: I 65,  Facility Carried by Structure: GARRETT RD
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.95m (39.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,032,000,  Roadway Improvement Cost: $303,000,  Total Project Cost: $3,335,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10882,  Location: MORGAN-LIMESTONE COLINE (Lat: 34.573389,  Lng: -86.909722),  Route carried "on" structure: Interstate 65,  Year Built: 1973,  Status: Open,  Structure Length: 303.76m (996.59ft),  Average Daily Traffic: 17,375 (year 2021),  Truck Traffic: 27%,  Average Future Daily Traffic: 22,013 (year 2033),  Design Load: HS 20,  Features Intersected: TENNESSEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 540.962,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 17.4m (57.1ft), Horizontal Clearance: 106.7m (350.1ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 13,  Number Of Approach Spans: 141,  Length of Maximum Span: 114.3m (375.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 303.76m (996.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $89,564,000,  Roadway Improvement Cost: $8,956,000,  Total Project Cost: $98,520,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Other
Find on map >>   Show street view

Structure Number: 10883,  Location: MORGAN-LIMESTONE COLINE (Lat: 34.573333,  Lng: -86.909500),  Route carried "on" structure: Interstate 65,  Year Built: 1973,  Status: Open,  Structure Length: 303.76m (996.59ft),  Average Daily Traffic: 17,375 (year 2021),  Truck Traffic: 27%,  Average Future Daily Traffic: 22,013 (year 2033),  Design Load: HS 20,  Features Intersected: TENNESSEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 540.962,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 17.4m (57.1ft), Horizontal Clearance: 106.7m (350.1ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 13,  Number Of Approach Spans: 141,  Length of Maximum Span: 114.3m (375.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 303.76m (996.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $89,564,000,  Roadway Improvement Cost: $8,956,000,  Total Project Cost: $98,520,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Other
Find on map >>   Show street view

Structure Number: 10971,  Location: JCT SANDLIN RD*CLARK SPGS (Lat: 34.565000,  Lng: -86.991667),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 5,625 (year 2009),  Truck Traffic: 20%,  Average Future Daily Traffic: 12,115 (year 2030),  Design Load: H 15,  Features Intersected: CLARK SPRINGS,  Facility Carried by Structure: SANDLIN RD SW
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 46.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $906,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $997,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11272,  Location: 0.1 E JCT CHURCH*GRANT ST (Lat: 34.600800,  Lng: -86.964400),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 16,804 (year 2005),  Truck Traffic: 25%,  Average Future Daily Traffic: 22,660 (year 2030),  Design Load: H 15,  Features Intersected: STREAM,  Facility Carried by Structure: CHURCH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $422,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $464,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11273,  Location: .2 MI E JCT GRANT * 16TH (Lat: 34.601500,  Lng: -86.964100),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 14,717 (year 2005),  Truck Traffic: 20%,  Average Future Daily Traffic: 19,517 (year 2028),  Design Load: H 15,  Features Intersected: STREAM,  Facility Carried by Structure: GRANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $479,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11428,  Location: JCT CLARK SPRINGS *SPG AV (Lat: 34.565222,  Lng: -86.999917),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 11,827 (year 2009),  Truck Traffic: 20%,  Average Future Daily Traffic: 24,126 (year 2029),  Design Load: H 15,  Features Intersected: CLARK SPRINGS,  Facility Carried by Structure: SPRING AVE SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $279,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $307,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11477,  Location: 0.1 MI W CENT PKY *8TH ST (Lat: 34.589400,  Lng: -86.988100),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 20,930 (year 2005),  Truck Traffic: 20%,  Average Future Daily Traffic: 26,313 (year 2028),  Design Load: HS 15,  Features Intersected: BRANCH,  Facility Carried by Structure: 8TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 69.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $441,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11478,  Location: JCT 8TH ST * DRY BRANCH (Lat: 34.589400,  Lng: -86.987200),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 33,034 (year 2009),  Truck Traffic: 20%,  Average Future Daily Traffic: 34,297 (year 2029),  Design Load: H 15,  Features Intersected: DRY BRANCH,  Facility Carried by Structure: 8TH ST SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $675,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $743,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1164,  Location: JCT DANVILLE RD*DRYBRANCH (Lat: 34.585000,  Lng: -87.000000),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 10,782 (year 2009),  Truck Traffic: 20%,  Average Future Daily Traffic: 29,516 (year 2030),  Design Load: H 15,  Features Intersected: DRY BRANCH,  Facility Carried by Structure: DANVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $337,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11671,  Location: JCT BROOKMEAD RD*BRUSH CK (Lat: 34.570900,  Lng: -86.966200),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 5,634 (year 2005),  Truck Traffic: 20%,  Average Future Daily Traffic: 7,995 (year 2028),  Design Load: H 15,  Features Intersected: BRUSH CREEK,  Facility Carried by Structure: BROOKMEAD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,036,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,140,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11685,  Location: JCT COUNTRY CLUB*BRUSH CK (Lat: 34.571300,  Lng: -86.967000),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 14,814 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 19,825 (year 2028),  Design Load: H 15,  Features Intersected: BRUSH CREEK,  Facility Carried by Structure: COUNTRY CLUB RD S
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 51.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.08m (10.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $853,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $938,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11901,  Location: JCT WASHINGTON *DRYBRANCH (Lat: 34.613800,  Lng: -86.995200),  Route carried "on" structure: City street ,  Year Built: 1935,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 16,187 (year 2009),  Truck Traffic: 20%,  Average Future Daily Traffic: 19,180 (year 2030),  Design Load: H 15,  Features Intersected: DRY BRANCH,  Facility Carried by Structure: WASHINGTON ST NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 65.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.19m (10.47ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $986,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,085,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12201,  Location: 0.4 MI N JCT SR 67 & SR 3 (Lat: 34.561539,  Lng: -86.981094),  Route carried "on" structure: State highway 67,  Year Built: 1979,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 16,610 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,548 (year 2033),  Design Load: HS 20,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.220,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.98m (22.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,584,000,  Roadway Improvement Cost: $258,000,  Total Project Cost: $2,842,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12409,  Location: JCT 2ND ST * DRY BRANCH (Lat: 34.600400,  Lng: -86.989700),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 11,372 (year 2005),  Truck Traffic: 25%,  Average Future Daily Traffic: 13,221 (year 2028),  Design Load: H 15,  Features Intersected: DRY BRANCH,  Facility Carried by Structure: 2ND ST SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $705,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $776,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12411,  Location: JCT MOULTON ST *DRYBRANCH (Lat: 34.604036,  Lng: -86.991319),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 7,077 (year 2009),  Truck Traffic: 40%,  Average Future Daily Traffic: 24,332 (year 2030),  Design Load: H 20,  Features Intersected: DRY BRANCH,  Facility Carried by Structure: MOULTON ST W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 37.5m (123.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,661,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $1,827,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12568,  Location: 1.4 M W JCT SR 24 & SR 67 (Lat: 34.597278,  Lng: -87.046889),  Route carried "on" structure: State highway 24,  Year Built: 1981,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 14,590 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,343 (year 2033),  Design Load: HS 20,  Features Intersected: BAKERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 110.496,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 83.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,390,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $2,629,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12569,  Location: 0.9 M W JCT SR 24 & SR 67 (Lat: 34.600000,  Lng: -87.041667),  Route carried "on" structure: State highway 24,  Year Built: 1981,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 14,490 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,211 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 110.979,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,550,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $1,705,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12597,  Location: 200 FT OF GORDON DRSW (Lat: 34.601400,  Lng: -86.990300),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 19,388 (year 2009),  Truck Traffic: 20%,  Average Future Daily Traffic: 26,463 (year 2030),  Design Load: H 20,  Features Intersected: DRY BRANCH,  Facility Carried by Structure: CENTRAL PARKWAY
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,420,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $1,562,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12608,  Location: 2.15 MI N OAK RIDGE (Lat: 34.500811,  Lng: -86.985689),  Route carried "on" structure: County highway 39,  Year Built: 1981,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 1,560 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,057 (year 2041),  Design Load: HS 20,  Features Intersected: FLINT CREEK,  Facility Carried by Structure: NORRIS MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1278,  Location: JCT SR 24 & SR 67 (Lat: 34.601717,  Lng: -87.031883),  Route carried "on" structure: State highway 24,  Year Built: 1982,  Status: Open,  Structure Length: 9.63m (31.59ft),  Average Daily Traffic: 5,280 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,650 (year 2029),  Design Load: HS 20,  Features Intersected: SR 67
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 112.029,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.57m (34.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,988,000,  Roadway Improvement Cost: $399,000,  Total Project Cost: $4,387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12781,  Location: JCT SR 24 & SR 67 (Lat: 34.601497,  Lng: -87.031864),  Route carried "on" structure: State highway 24,  Year Built: 1982,  Status: Open,  Structure Length: 9.63m (31.59ft),  Average Daily Traffic: 5,280 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,650 (year 2029),  Design Load: HS 20,  Features Intersected: SR 67
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 112.028,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.57m (34.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,118,000,  Roadway Improvement Cost: $312,000,  Total Project Cost: $3,430,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13031,  Location: 400 FT S OF 3RD ST SW (Lat: 34.596036,  Lng: -86.989297),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 16,487 (year 2009),  Truck Traffic: 25%,  Average Future Daily Traffic: 20,291 (year 2029),  Design Load: H 20,  Features Intersected: DRY BRANCH,  Facility Carried by Structure: CENTRAL PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 25.1m (82.3ft),  Out-to-Out Width: 35.3m (115.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,297,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,427,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13331,  Location: JCT. CENTRAL PKY * BRANCH (Lat: 34.566667,  Lng: -86.981667),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 25,162 (year 2009),  Truck Traffic: 25%,  Average Future Daily Traffic: 47,883 (year 2033),  Design Load: H 20,  Features Intersected: CLARK SPRINGS BRANCH,  Facility Carried by Structure: CENTRAL PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 38.0m (124.7ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 41.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $705,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $776,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15043,  Location: JCT I 65 & I 565 (Lat: 34.627750,  Lng: -86.900861),  Route carried "on" structure: Spur Interstate 565,  Year Built: 1990,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 26,590 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 35,183 (year 2033),  Design Load: HS 20,  Features Intersected: I 565,  Facility Carried by Structure: I 65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 547.190,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 41.8m (137.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.32m (30.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,939,000,  Roadway Improvement Cost: $294,000,  Total Project Cost: $3,233,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15219,  Location: 3.0 MI E LAWRENCE CO LINE (Lat: 34.513875,  Lng: -87.051906),  Route carried "on" structure: County highway 89,  Year Built: 1990,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 80 (year 1995),  Average Future Daily Traffic: 176 (year 2041),  Features Intersected: MUD TAVERN CREEK,  Facility Carried by Structure: MUD TAVERN ROAD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $435,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15244,  Location: 0.5 MI W US 31 (Lat: 34.489014,  Lng: -86.967181),  Route carried "on" structure: County highway 193,  Year Built: 1990,  Status: Open,  Structure Length: 11.46m (37.60ft),  Average Daily Traffic: 800 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,571 (year 2040),  Design Load: HS 20,  Features Intersected: FLINT CREEK,  Facility Carried by Structure: BOWLES BRIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 9,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.33m (40.45ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $2,368,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $2,605,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15478,  Location: 1.75 MI E SR 31 (Lat: 34.506381,  Lng: -86.956072),  Route carried "on" structure: County highway 201,  Year Built: 1991,  Status: Open,  Structure Length: 7.26m (23.82ft),  Average Daily Traffic: 330 (year 1990),  Truck Traffic: 5%,  Average Future Daily Traffic: 881 (year 2040),  Design Load: HS 20,  Features Intersected: FLINT CREEK,  Facility Carried by Structure: RED BANK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $1,477,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $1,625,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15669,  Location: JCT I 565 & I 65 (Lat: 34.629806,  Lng: -86.901889),  Route carried "on" structure: Ramp Interstate 565,  Year Built: 1990,  Status: Open,  Structure Length: 10.58m (34.71ft),  Average Daily Traffic: 5,318 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 7,036 (year 2033),  Design Load: HS 20,  Features Intersected: I 65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.49m (37.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,150,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $3,465,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Membrane: Epoxy,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 1567,  Location: JCT I 65 & I 565 (Lat: 34.627331,  Lng: -86.903619),  Route carried "on" structure: Ramp Interstate 565,  Year Built: 1990,  Status: Open,  Structure Length: 9.88m (32.41ft),  Average Daily Traffic: 5,318 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 7,036 (year 2033),  Design Load: HS 20,  Features Intersected: I 565,  Facility Carried by Structure: I 65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 547.190,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.81m (35.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,040,000,  Roadway Improvement Cost: $304,000,  Total Project Cost: $3,344,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Membrane: Epoxy,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 15673,  Location: JCT SPRINGVIEW*CLARK SPGS (Lat: 34.563953,  Lng: -86.995033),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 2,753 (year 2005),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,165 (year 2028),  Design Load: H 15,  Features Intersected: CLARK SPRINGS,  Facility Carried by Structure: SPRINGVIEW ST SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 46.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $632,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $695,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15674,  Location: JCT. CORSBIE BRUSCH CK. (Lat: 34.575800,  Lng: -86.972200),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,346 (year 2009),  Truck Traffic: 20%,  Average Future Daily Traffic: 4,989 (year 2030),  Design Load: H 15,  Features Intersected: BRUSH CREEK,  Facility Carried by Structure: CORSBIE ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 49.4m (162.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,216,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,338,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous