Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Elkhart, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 171Number of bridges
  • 1,572ft / 479mTotal length
  • $9,028,000Total costs
  • 1,771,725Total average daily traffic
  • 343,210Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Elkhart
  • No street view available for this location

New bridges in Elkhart, IN - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 41920-1929
  • 41930-1939
  • 451950-1959
  • 191960-1969
  • 101970-1979
  • 81980-1989
  • 731990-1999
  • 32000-2009
  • 42010-2019
Reconstructed bridges in Elkhart, IN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 61970-1979
  • 61980-1989
  • 101990-1999
  • 72000-2009
  • 152010-2019
  • 32020-2022
Average Bridge Daily Traffic in Elkhart, IN
Average Bridge Truck Traffic in Elkhart, IN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.1%Excellent
  • 10.9%Very good
  • 41.3%Good
  • 35.9%Satisfactory
  • 8.7%Fair
  • 2.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.0%Excellent
  • 15.6%Very good
  • 39.6%Good
  • 25.0%Satisfactory
  • 11.5%Fair
  • 7.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.0%Excellent
  • 15.6%Very good
  • 45.8%Good
  • 30.2%Satisfactory
  • 7.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.4%Very good
  • 34.3%Good
  • 41.8%Satisfactory
  • 13.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 48076,  Location: 04.42 E SR 19 (Lat: 41.730531,  Lng: -85.884911),  Route carried "under" structure: Interstate 90,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 12,250 (year 2011),  Truck Traffic: 14%,  Features Intersected: I-90
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 154.658,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Steel continuous,  Length of Maximum Span: 35.3m (115.8ft)

Find on map >>   Show street view

Structure Number: 48076,  Location: 04.42 E SR 19 (Lat: 41.730531,  Lng: -85.884911),  Route carried "under" structure: Interstate 90,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 12,250 (year 2011),  Truck Traffic: 14%,  Features Intersected: 1-90 WBL
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 154.658,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Steel continuous,  Length of Maximum Span: 35.3m (115.8ft)

Find on map >>   Show street view

Structure Number: 7511,  Location: 01.14 W SR-19 (Lat: 41.626300,  Lng: -86.023803),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 17,398 (year 2020),  Truck Traffic: 19%,  Features Intersected: US 20 EB,  Facility Carried by Structure: CR 3
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 3.299,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 7511,  Location: 01.14 W SR-19 (Lat: 41.626300,  Lng: -86.023803),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 17,094 (year 2020),  Truck Traffic: 19%,  Features Intersected: US 20 WB,  Facility Carried by Structure: CR 3
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 3.299,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 7514,  Location: 00.58 W SR-19 (Lat: 41.628869,  Lng: -86.013481),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 17,246 (year 2020),  Truck Traffic: 15%,  Features Intersected: US 20 WB,  Facility Carried by Structure: CR 22
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 4.200,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 7514,  Location: 00.58 W SR-19 (Lat: 41.628869,  Lng: -86.013481),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 17,246 (year 2020),  Truck Traffic: 15%,  Features Intersected: US 20 EB,  Facility Carried by Structure: CR 22
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 4.200,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 7515,  Location: 09.15 S of I-90 (Lat: 41.631361,  Lng: -86.002692),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 15,323 (year 2020),  Truck Traffic: 18%,  Features Intersected: US 20 WB,  Facility Carried by Structure: SR 19
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 5.134,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.7m (110.6ft)

Find on map >>   Show street view

Structure Number: 7515,  Location: 09.15 S of I-90 (Lat: 41.631361,  Lng: -86.002692),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 15,323 (year 2020),  Truck Traffic: 18%,  Features Intersected: US 20 EB,  Facility Carried by Structure: SR 19
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 5.134,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.7m (110.6ft)

Find on map >>   Show street view

Structure Number: 7516,  Location: 00.99 E SR-19 (Lat: 41.635811,  Lng: -85.984467),  Route carried "under" structure: US 20,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 15,323 (year 2020),  Truck Traffic: 18%,  Features Intersected: US 20 WB,  Facility Carried by Structure: CR 7
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 6.727,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 7516,  Location: 00.99 E SR-19 (Lat: 41.635811,  Lng: -85.984467),  Route carried "under" structure: US 20,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 15,323 (year 2020),  Truck Traffic: 18%,  Features Intersected: US 20 EB,  Facility Carried by Structure: CR 7
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 6.727,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 7517,  Location: 02.06 E SR-19 (Lat: 41.641181,  Lng: -85.965117),  Route carried "under" structure: County highway ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 2,670 (year 2019),  Truck Traffic: 8%,  Features Intersected: CR 9,  Facility Carried by Structure: US 20 EB
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 7518,  Location: 02.06 E SR-19 (Lat: 41.641331,  Lng: -85.965133),  Route carried "under" structure: County highway ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 3,779 (year 2020),  Truck Traffic: 5%,  Features Intersected: CR 9,  Facility Carried by Structure: US 20 WB
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 7519,  Location: 02.82 E SR 19 (Lat: 41.646611,  Lng: -85.952247),  Route carried "under" structure: County highway ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 9,262 (year 2021),  Truck Traffic: 13%,  Features Intersected: CR 20,  Facility Carried by Structure: US 20 EB
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.6m (64.3ft)

Find on map >>   Show street view

Structure Number: 752,  Location: 02.82 E SR-19 (Lat: 41.646700,  Lng: -85.952414),  Route carried "under" structure: County highway ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 11,403 (year 2015),  Truck Traffic: 5%,  Features Intersected: CR 20,  Facility Carried by Structure: US 20 WB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.6m (64.3ft)

Find on map >>   Show street view

Structure Number: 7521,  Location: 03.51 E SR-19 (Lat: 41.652081,  Lng: -85.940636),  Route carried "under" structure: US 33,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 7,185 (year 2021),  Truck Traffic: 4%,  Features Intersected: US 33 NB,  Facility Carried by Structure: US 20 EB
Minimum Vertical Clearance: 7.77m (25.49ft),  Kilometerpoint: 36.307,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 7521,  Location: 03.51 E SR-19 (Lat: 41.652081,  Lng: -85.940636),  Route carried "under" structure: US 33,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 7,185 (year 2021),  Truck Traffic: 4%,  Features Intersected: US 33 SB,  Facility Carried by Structure: US 20 EB
Minimum Vertical Clearance: 7.77m (25.49ft),  Kilometerpoint: 36.307,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 7522,  Location: 03.51 E SR-19 (Lat: 41.652211,  Lng: -85.940728),  Route carried "under" structure: US 33,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 6,035 (year 2015),  Truck Traffic: 24%,  Features Intersected: US 33 NB,  Facility Carried by Structure: US 20 WB
Minimum Vertical Clearance: 7.77m (25.49ft),  Kilometerpoint: 36.323,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 7522,  Location: 03.51 E SR-19 (Lat: 41.652211,  Lng: -85.940728),  Route carried "under" structure: US 33,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 6,035 (year 2015),  Truck Traffic: 24%,  Features Intersected: US 33 SB,  Facility Carried by Structure: US 20 WB
Minimum Vertical Clearance: 7.77m (25.49ft),  Kilometerpoint: 36.323,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 7523,  Location: 00.13 E US-33 (Lat: 41.652931,  Lng: -85.938806),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 3,467 (year 2021),  Truck Traffic: 7%,  Features Intersected: CR 45,  Facility Carried by Structure: US 20 EB
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 7524,  Location: 00.13 E US-33 (Lat: 41.653039,  Lng: -85.938928),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 3,467 (year 2021),  Truck Traffic: 7%,  Features Intersected: CR 45,  Facility Carried by Structure: US 20 WB
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 7526,  Location: 01.09 E US-33 (Lat: 41.657089,  Lng: -85.921731),  Route carried "under" structure: County highway ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 6,513 (year 2021),  Truck Traffic: 2%,  Features Intersected: CR 13,  Facility Carried by Structure: US 20 EB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.0m (62.3ft)

Find on map >>   Show street view

Structure Number: 75265,  Location: 01.09 E US-33 (Lat: 41.657219,  Lng: -85.921739),  Route carried "under" structure: County highway ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 6,513 (year 2021),  Truck Traffic: 2%,  Features Intersected: CR 13,  Facility Carried by Structure: US 20 WB
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.0m (62.3ft)

Find on map >>   Show street view

Structure Number: 7528,  Location: 01.47 E US-33 (Lat: 41.657281,  Lng: -85.914414),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 10,281 (year 2020),  Truck Traffic: 20%,  Features Intersected: US 20 WB,  Facility Carried by Structure: CR 115
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 13.148,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.3m (112.5ft)

Find on map >>   Show street view

Structure Number: 7528,  Location: 01.47 E US-33 (Lat: 41.657281,  Lng: -85.914414),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 10,281 (year 2020),  Truck Traffic: 20%,  Features Intersected: US 20 EB,  Facility Carried by Structure: CR 115
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 13.148,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.3m (112.5ft)

Find on map >>   Show street view

Structure Number: 7529,  Location: 02.06 E US-33 (Lat: 41.659539,  Lng: -85.903825),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 14,010 (year 2020),  Truck Traffic: 20%,  Features Intersected: US 20 WB,  Facility Carried by Structure: CR 18
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 14.098,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.5m (152.6ft)

Find on map >>   Show street view

Structure Number: 7529,  Location: 02.06 E US-33 (Lat: 41.659539,  Lng: -85.903825),  Route carried "under" structure: US 20,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 14,010 (year 2020),  Truck Traffic: 20%,  Features Intersected: US 20 EB,  Facility Carried by Structure: CR 18
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 14.098,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.5m (152.6ft)

Find on map >>   Show street view

Structure Number: 753,  Location: 02.74 E US 33 (Lat: 41.666431,  Lng: -85.894653),  Route carried "under" structure: US 20,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 11,647 (year 2021),  Truck Traffic: 18%,  Features Intersected: US 20 EB
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 15.192,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.5m (165.7ft)

Find on map >>   Show street view

Structure Number: 753,  Location: 02.74 E US 33 (Lat: 41.666431,  Lng: -85.894653),  Route carried "under" structure: US 20,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 11,647 (year 2021),  Truck Traffic: 18%,  Features Intersected: US 20 WB
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 15.192,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.5m (165.7ft)

Find on map >>   Show street view

Structure Number: 753,  Location: 02.74 E US 33 (Lat: 41.666431,  Lng: -85.894653),  Route carried "under" structure: Ramp US 20,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 4,307 (year 2021),  Truck Traffic: 12%,  Features Intersected: US 20 WB RAMP
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 15.192,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.5m (165.7ft)

Find on map >>   Show street view

Structure Number: 7531,  Location: 02.88 E US-33 (Lat: 41.667792,  Lng: -85.892881),  Route carried "under" structure: Ramp County highway ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 3,798 (year 2020),  Truck Traffic: 25%,  Features Intersected: CR 17 NW RAMP,  Facility Carried by Structure: US 20 NW CONNECTOR
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 15.418,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 7532,  Location: 03.10 E US-33 (Lat: 41.666681,  Lng: -85.887483),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 12,267 (year 2021),  Truck Traffic: 11%,  Features Intersected: CR 17 NBL,  Facility Carried by Structure: US 20 EB RAMP
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)

Find on map >>   Show street view

Structure Number: 7532,  Location: 03.10 E US-33 (Lat: 41.666681,  Lng: -85.887483),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 12,267 (year 2021),  Truck Traffic: 11%,  Features Intersected: CR 17 SBL,  Facility Carried by Structure: US 20 EB RAMP
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)

Find on map >>   Show street view

Structure Number: 7533,  Location: 03.10 E US-33 (Lat: 41.666811,  Lng: -85.887489),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 12,267 (year 2021),  Truck Traffic: 11%,  Features Intersected: CR 17 NBL,  Facility Carried by Structure: US 20 EB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)

Find on map >>   Show street view

Structure Number: 7533,  Location: 03.10 E US-33 (Lat: 41.666811,  Lng: -85.887489),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 12,267 (year 2021),  Truck Traffic: 11%,  Features Intersected: CR 17 SBL,  Facility Carried by Structure: US 20 EB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)

Find on map >>   Show street view

Structure Number: 75335,  Location: 03.10 E US-33 (Lat: 41.666961,  Lng: -85.887497),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 12,267 (year 2021),  Truck Traffic: 11%,  Features Intersected: CR 17 NBL,  Facility Carried by Structure: US 20 WB
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)

Find on map >>   Show street view

Structure Number: 75335,  Location: 03.10 E US-33 (Lat: 41.666961,  Lng: -85.887497),  Route carried "under" structure: County highway ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 12,267 (year 2021),  Truck Traffic: 11%,  Features Intersected: CR 17 SBL,  Facility Carried by Structure: US 20 WB
Minimum Vertical Clearance: 3.18m (10.43ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.1m (95.5ft)

Discuss Elkhart, Indiana (IN) on our hugely popular Indiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.