Bridge Statistics for Fairbanks, Alaska (AK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- New bridges - historical statistics
- 11950-1959
- 81960-1969
- 11970-1979
- 131980-1989
- 101990-1999
- 92000-2009
- 22010-2019
- 22020-2022
- Bridge Condition - Deck
- 2.9%Excellent
- 34.3%Very good
- 37.1%Good
- 14.3%Satisfactory
- 5.7%Fair
- 5.7%Poor
- Bridge Condition - Superstructure
- 5.7%Excellent
- 17.1%Very good
- 42.9%Good
- 20.0%Satisfactory
- 11.4%Fair
- 2.9%Poor
- Bridge Condition - Substructure
- 2.9%Excellent
- 20.0%Very good
- 57.1%Good
- 17.1%Satisfactory
- 2.9%Poor
- Bridge Condition - Channel
- 21.4%Excellent
- 25.0%Very good
- 35.7%Good
- 7.1%Satisfactory
- 3.6%Fair
- 7.1%Poor
- Bridge Condition - Culverts
- 50.0%Good
- 50.0%Satisfactory
Find on map >> Show street view
Structure Number: 2059, Location: MILE POINT 20.1 (Lat: 65.042508, Lng: -147.447264), Route carried "under" structure: ServiceOther road , Year Built: 2001, Structure Length: 0. m, Average Daily Traffic: 103 (year 2018), Truck Traffic: 90%, Features Intersected: FAIRBANKS MINING RD U.C., Facility Carried by Structure: STEESE HIGHWAY
Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 35.9m (117.8ft)
Structure Number: 2059, Location: MILE POINT 20.1 (Lat: 65.042508, Lng: -147.447264), Route carried "under" structure: ServiceOther road , Year Built: 2001, Structure Length: 0. m, Average Daily Traffic: 103 (year 2018), Truck Traffic: 90%, Features Intersected: FAIRBANKS MINING RD U.C., Facility Carried by Structure: STEESE HIGHWAY
Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Tee Beam, Length of Maximum Span: 35.9m (117.8ft)