Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fort Scott, Kansas (KS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 54Number of bridges
  • 719ft / 219mTotal length
  • $3,504,000Total costs
  • 120,238Total average daily traffic
  • 17,311Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fort Scott
  • No street view available for this location

New bridges in Fort Scott, KS - historical statistics
  • New bridges - historical statistics
  • 71920-1929
  • 51930-1939
  • 11940-1949
  • 31950-1959
  • 121960-1969
  • 31970-1979
  • 131980-1989
  • 41990-1999
  • 52000-2009
  • 12010-2019
Reconstructed bridges in Fort Scott, KS - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 22000-2009
Average Bridge Daily Traffic in Fort Scott, KS
Average Bridge Truck Traffic in Fort Scott, KS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.2%Very good
  • 47.4%Good
  • 21.1%Satisfactory
  • 15.8%Fair
  • 2.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.4%Very good
  • 50.0%Good
  • 18.4%Satisfactory
  • 7.9%Fair
  • 5.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.4%Very good
  • 44.7%Good
  • 18.4%Satisfactory
  • 7.9%Fair
  • 5.3%Poor
  • 5.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.8%Very good
  • 21.9%Good
  • 31.3%Satisfactory
  • 21.9%Fair
  • 3.1%Poor
  • 3.1%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
  • 14.3%Serious
Find on map >>   Show street view

Structure Number: 4083,  Location: 1.0S 1.4W OF ISABEL (Lat: 37.456444,  Lng: -98.581056),  Route carried "on" structure: County highway 2131,  Year Built: 1985,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 60 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 65 (year 2041),  Features Intersected: SAND CREEK,  Facility Carried by Structure: Alcon Road
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 6007,  Location: 6.0N 2.2E OF PAWNEE STA. (Lat: 37.790511,  Lng: -94.756358),  Route carried "on" structure: County highway 50,  Year Built: 1925,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 620 (year 2006),  Truck Traffic: 11%,  Average Future Daily Traffic: 620 (year 2039),  Features Intersected: ROCK CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 18.561,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.8m (25.6ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $53,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $80,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6008,  Location: 6.1N 2.3E OF PAWNEE STA. (Lat: 37.790547,  Lng: -94.755019),  Route carried "on" structure: County highway 50,  Year Built: 1924,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 812 (year 2006),  Truck Traffic: 11%,  Average Future Daily Traffic: 812 (year 2039),  Features Intersected: TRIB. TO ROCK CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 18.673,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $39,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $59,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6019,  Location: 2.5E 3.9S OF FORT SCOTT (Lat: 37.778019,  Lng: -94.658758),  Route carried "on" structure: County highway 55,  Year Built: 1929,  Status: Posted for load,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 315 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 315 (year 2039),  Features Intersected: MOORES BRANCH CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 12.556,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $250,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 602,  Location: 2.5E 3.5S OF FORT SCOTT (Lat: 37.783153,  Lng: -94.658831),  Route carried "on" structure: County highway 55,  Year Built: 1929,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 315 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 315 (year 2039),  Features Intersected: TRIB. MOORES BRA. CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 13.136,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $105,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6022,  Location: 1.5N 1.4E OF FORT SCOTT (Lat: 37.863214,  Lng: -94.678333),  Route carried "on" structure: County highway 57,  Year Built: 1965,  Status: Posted for load,  Structure Length: 10.15m (33.30ft),  Average Daily Traffic: 380 (year 2006),  Truck Traffic: 11%,  Average Future Daily Traffic: 380 (year 2039),  Design Load: H 15,  Features Intersected: MARMATON RIVER
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 2.849,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.2m (131.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 10.15m (33.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $529,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $793,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6039,  Location: 3.0S OF HAMMOND (Lat: 37.892203,  Lng: -94.694978),  Route carried "on" structure: County highway 1196,  Year Built: 1928,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 117 (year 2006),  Truck Traffic: 11%,  Average Future Daily Traffic: 117 (year 2039),  Features Intersected: WOLVERINE CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 1.626,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $135,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $200,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 60512,  Location: S.E. FORT SCOTT (Lat: 37.806572,  Lng: -94.696200),  Route carried "on" structure: County highway 2104,  Year Built: 1935,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,320 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,320 (year 2039),  Features Intersected: TRIB. TO MARMATON RIVER
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 11.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $68,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $140,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 61097906005,  Location: 1.5S 2.4E OF MARMATON (Lat: 37.811667,  Lng: -94.780000),  Route carried "on" structure: County highway 611,  Year Built: 2007,  Status: Open,  Structure Length: 9.18m (30.12ft),  Average Daily Traffic: 35 (year 2006),  Average Future Daily Traffic: 45 (year 2039),  Design Load: HL 93,  Features Intersected: MARMATON RIVER,  Facility Carried by Structure: MINOR 16.9-P.5
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Other Special Inspection Date: September 2019,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6110130602,  Location: 2.5S 2.7W OF FORT SCOTT (Lat: 37.805175,  Lng: -94.755675),  Route carried "on" structure: County highway ,  Year Built: 1976,  Status: Posted for load,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 40 (year 2006),  Average Future Daily Traffic: 40 (year 2039),  Features Intersected: ROCK CREEK,  Facility Carried by Structure: LOCAL 18.3-Q.0
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 24.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Other Special Inspection Date: September 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 61101805885,  Location: 2.5S 2.2W OF HAMMOND (Lat: 37.899581,  Lng: -94.735167),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 30 (year 2006),  Average Future Daily Traffic: 30 (year 2039),  Features Intersected: TRIB. TO MILL CREEK,  Facility Carried by Structure: LOCAL 18.8-J.5
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Other Special Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 6110320602,  Location: 2.5S 1.9W OF FORT SCOTT (Lat: 37.805169,  Lng: -94.738194),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 50 (year 2006),  Average Future Daily Traffic: 50 (year 2042),  Features Intersected: TRIB. TO MARMATON RIVER,  Facility Carried by Structure: LOCAL 19.2-Q.0
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 27.0 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $135,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $210,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6110330608,  Location: 1.5W 5.5S OF FORT SCOTT (Lat: 37.761400,  Lng: -94.734150),  Route carried "on" structure: County highway ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5 (year 2006),  Average Future Daily Traffic: 30 (year 2042),  Features Intersected: TRIB. TO ROCK CREEK,  Facility Carried by Structure: Local 19.3-T.0
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.6m (11.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Poor,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $225,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 61103605967,  Location: W. EDGE OF FORT SCOTT (Lat: 37.839722,  Lng: -94.719167),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Posted for load,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 100 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 100 (year 2042),  Design Load: H 15,  Features Intersected: MARMATON RIVER,  Facility Carried by Structure: LOCAL 19.6-N.7
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 35.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.62m (25.00ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $650,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6110720592,  Location: 2.5N 0.6E OF FORT SCOTT (Lat: 37.877822,  Lng: -94.691917),  Route carried "on" structure: County highway ,  Year Built: 1920,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 20 (year 2006),  Average Future Daily Traffic: 20 (year 2042),  Features Intersected: TRIB. TO WOLVERINE CREEK,  Facility Carried by Structure: OSAGE RD. 21.2-L.0
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Serious,  Channel: Fair,  Operating Rating: 13.5 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 8.1 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $26,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $39,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 61107505925,  Location: 2.0N 1.0E OF FORT SCOTT (Lat: 37.870611,  Lng: -94.686453),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 100 (year 2006),  Truck Traffic: 15%,  Average Future Daily Traffic: 100 (year 2039),  Features Intersected: WOLVERINE CREEK,  Facility Carried by Structure: Local 21.5-L.5
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $235,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $350,000
Find on map >>   Show street view

Structure Number: 61111006044,  Location: 3.4S 2.0E OF FORT SCOTT (Lat: 37.785042,  Lng: -94.667997),  Route carried "on" structure: County highway ,  Year Built: 1952,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 35 (year 2006),  Average Future Daily Traffic: 35 (year 2039),  Features Intersected: TRIB. MOORES BR. CREEK,  Facility Carried by Structure: Local 23.0-R.4
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 61111006048,  Location: 3.8S 2.0E OF FORT SCOTT (Lat: 37.779264,  Lng: -94.667883),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Posted for load,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 35 (year 2006),  Average Future Daily Traffic: 35 (year 2042),  Features Intersected: MOORES BRANCH CREEK,  Facility Carried by Structure: Local 23.0-R.8
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6111110594,  Location: 1.5N 2.5E OF FORT SCOTT (Lat: 37.863231,  Lng: -94.657756),  Route carried "on" structure: County highway ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 100 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 100 (year 2039),  Features Intersected: TRIB. TO MARMATON RIVER,  Facility Carried by Structure: Local 23.1-M.0
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $44,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $88,000
Find on map >>   Show street view

Structure Number: 6111120606,  Location: 4.0S 2.3E OF FORT SCOTT (Lat: 37.775833,  Lng: -94.661028),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 35 (year 2006),  Average Future Daily Traffic: 35 (year 2042),  Features Intersected: TRIB. MOORES BR. CREEK,  Facility Carried by Structure: Local 23.2-S.0
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Channel: Serious,  Culverts: Serious,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $60,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $90,000
Find on map >>   Show street view

Structure Number: 61113005946,  Location: 1.0N 3.8E of Fort Scott (Lat: 37.855972,  Lng: -94.640306),  Route carried "on" structure: County highway 621,  Year Built: 2012,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 30 (year 2006),  Average Future Daily Traffic: 35 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: MARMATON RIVER,  Facility Carried by Structure: Minor 24.0-M.5
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 860431005182,  Location: 4.2S 1.0W OF SCOTT CITY (Lat: 38.420556,  Lng: -100.924722),  Route carried "on" structure: County highway ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 50 (year 2015),  Average Future Daily Traffic: 60 (year 2040),  Features Intersected: WHITE WOMAN CREEK,  Facility Carried by Structure: S. KANSAS RD
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 16.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $225,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 409250061307014,  Location: North of Fort Scott (Lat: 37.846278,  Lng: -94.707333),  Route carried "on" structure: City street 1307,  Year Built: 1933,  Year Reconstructed: 2012,  Status: Posted for load,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 2,865 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,500 (year 2039),  Design Load: H 20,  Features Intersected: Marmaton River,  Facility Carried by Structure: National Avenue
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.9m (29.2ft),  Material/Design: Concrete,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 60.1m (197.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 6.16m (20.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 409250061307024,  Location: North of Fort Scott (Lat: 37.849806,  Lng: -94.707333),  Route carried "on" structure: City street 1307,  Year Built: 1954,  Year Reconstructed: 2007,  Status: Posted for load,  Structure Length: 8.93m (29.30ft),  Average Daily Traffic: 2,865 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,000 (year 2039),  Design Load: H 20,  Features Intersected: Mill Creek,  Facility Carried by Structure: National Avenue
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 999905400060051,  Location: 0.48 MI N EJCT US69 (Lat: 37.848889,  Lng: -94.702222),  Route carried "on" structure: US 54,  Year Built: 1967,  Status: Open,  Structure Length: 10.03m (32.91ft),  Average Daily Traffic: 4,280 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 5,433 (year 2041),  Design Load: HS 20,  Features Intersected: MARMATON RIVER
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 35.198,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.90m (107.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999905400060061,  Location: 0.38 MI N EJCT US69 (Lat: 37.847500,  Lng: -94.702222),  Route carried "on" structure: US 54,  Year Built: 1967,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 4,280 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 5,433 (year 2041),  Design Load: HS 20,  Features Intersected: SYCAMORE ST
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 35.359,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Culverts: Good,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 999905400060071,  Location: 0.30 MI N EJCT US69 (Lat: 37.846111,  Lng: -94.702222),  Route carried "on" structure: US 54,  Year Built: 1967,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 4,280 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 5,433 (year 2041),  Design Load: HS 20,  Features Intersected: MKT ABANDONED RR
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 35.488,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 21 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.61m (47.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999905400060081,  Location: 0.21 MI N EJCT US69 (Lat: 37.844722,  Lng: -94.702222),  Route carried "on" structure: US 54,  Year Built: 1967,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 4,280 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 5,433 (year 2041),  Design Load: HS 20,  Features Intersected: BN RR (Abandoned)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 35.644,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 24.1m (79.1ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.30m (37.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999905400060671,  Location: 1.42 MI E K7 (Lat: 37.862222,  Lng: -94.742500),  Route carried "on" structure: US 54,  Year Built: 1987,  Status: Open,  Structure Length: 6.45m (21.16ft),  Average Daily Traffic: 3,192 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,527 (year 2041),  Design Load: HS 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 31.010,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 21.15m (69.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999905400060751,  Location: 2.75 M E SJCT U54/U69 (Lat: 37.844167,  Lng: -94.651944),  Route carried "on" structure: US 54,  Year Built: 2004,  Status: Open,  Structure Length: 4.58m (15.03ft),  Average Daily Traffic: 3,930 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,609 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: LATH BRANCH CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 40.533,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.01m (49.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999905400060761,  Location: 2.86 MI E SJCT U54/U69 (Lat: 37.844167,  Lng: -94.650000),  Route carried "on" structure: US 54,  Year Built: 2004,  Status: Open,  Structure Length: 3.58m (11.75ft),  Average Daily Traffic: 3,930 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,609 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: LATH BRANCH CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 40.702,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.73m (38.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999905400060871,  Location: 0.57 MI N SJCT US69, EB (Lat: 37.850000,  Lng: -94.702222),  Route carried "on" structure: US 54,  Year Built: 2003,  Status: Open,  Structure Length: 8.18m (26.84ft),  Average Daily Traffic: 4,280 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 5,433 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: MARMATON RIVER OVERFLOW
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 35.061,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.82m (87.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999905400060881,  Location: 0.57 MI N SJCT US69 WB (Lat: 37.850000,  Lng: -94.702500),  Route carried "on" structure: US 54,  Year Built: 2003,  Status: Open,  Structure Length: 8.18m (26.84ft),  Average Daily Traffic: 4,280 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 5,433 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: MARMATON RIVER OVERFLOW
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 35.306,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.82m (87.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999906900060091,  Location: S JCT US54&US69 (Lat: 37.841667,  Lng: -94.702222),  Route carried "on" structure: US 69,  Year Built: 1967,  Status: Open,  Structure Length: 16.82m (55.18ft),  Average Daily Traffic: 4,280 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 5,433 (year 2041),  Design Load: HS 20,  Features Intersected: US-54 EB (WALL STREET)
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 18.947,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 21.6m (70.9ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 55.20m (181.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999906900060151,  Location: 1.52 MI S EJCT US54, SB (Lat: 37.821389,  Lng: -94.704167),  Route carried "on" structure: US 69,  Year Built: 1967,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 6,222 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,380 (year 2041),  Design Load: HS 20,  Features Intersected: URB1304, NATIONAL AVE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 16.497,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 14.60m (47.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999906900060161,  Location: 1.51 MI S EJCT US54, NB (Lat: 37.821389,  Lng: -94.703889),  Route carried "on" structure: US 69,  Year Built: 1967,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 6,222 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,380 (year 2041),  Design Load: HS 20,  Features Intersected: URB1304, NATIONAL AVE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 16.505,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 14.60m (47.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999906900060511,  Location: N. JCT OF US-54 (Lat: 37.854722,  Lng: -94.702500),  Route carried "on" structure: US 69,  Year Built: 1985,  Status: Open,  Structure Length: 7.21m (23.65ft),  Average Daily Traffic: 3,637 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,404 (year 2041),  Design Load: HS 20,  Features Intersected: US-54 HIGHWAY
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 20.371,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.65m (77.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999906900060521,  Location: N. JCT OF US-54 NB. (Lat: 37.854722,  Lng: -94.702222),  Route carried "on" structure: US 69,  Year Built: 1985,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 7.21m (23.65ft),  Average Daily Traffic: 3,637 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 5,404 (year 2041),  Design Load: HS 20,  Features Intersected: US-54 HIGHWAY
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 20.376,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.65m (77.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999906900060531,  Location: 0.58 MI N OF N US-54 JCT (Lat: 37.863056,  Lng: -94.703056),  Route carried "on" structure: ServiceCounty highway 365,  Year Built: 1985,  Status: Open,  Structure Length: 8.37m (27.46ft),  Average Daily Traffic: 25 (year 2020),  Average Future Daily Traffic: 5,213 (year 2041),  Design Load: HS 20,  Features Intersected: US69 HWY NB & SB,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.645,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 27.45m (90.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999906900060541,  Location: 1.57 MI N OF N US-54 JCT (Lat: 37.877222,  Lng: -94.704722),  Route carried "on" structure: ServiceCounty highway 376,  Year Built: 1985,  Status: Open,  Structure Length: 8.37m (27.46ft),  Average Daily Traffic: 25 (year 2020),  Average Future Daily Traffic: 5,213 (year 2041),  Design Load: HS 20,  Features Intersected: US69 HWY NB & SB,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 7.849,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 27.45m (90.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Fort Scott, Kansas (KS) on our hugely popular Kansas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.