Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fort Scott, Kansas (KS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 54Number of bridges
  • 719ft / 219mTotal length
  • $3,504,000Total costs
  • 120,238Total average daily traffic
  • 17,311Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fort Scott
  • No street view available for this location

New bridges in Fort Scott, KS - historical statistics
  • New bridges - historical statistics
  • 71920-1929
  • 51930-1939
  • 11940-1949
  • 31950-1959
  • 121960-1969
  • 31970-1979
  • 131980-1989
  • 41990-1999
  • 52000-2009
  • 12010-2019
Reconstructed bridges in Fort Scott, KS - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 22000-2009
Average Bridge Daily Traffic in Fort Scott, KS
Average Bridge Truck Traffic in Fort Scott, KS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.2%Very good
  • 47.4%Good
  • 21.1%Satisfactory
  • 15.8%Fair
  • 2.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.4%Very good
  • 50.0%Good
  • 18.4%Satisfactory
  • 7.9%Fair
  • 5.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.4%Very good
  • 44.7%Good
  • 18.4%Satisfactory
  • 7.9%Fair
  • 5.3%Poor
  • 5.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.8%Very good
  • 21.9%Good
  • 31.3%Satisfactory
  • 21.9%Fair
  • 3.1%Poor
  • 3.1%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
  • 14.3%Serious
Find on map >>   Show street view

Structure Number: 999906900060551,  Location: 2.59 MI N OF N US-54 JCT (Lat: 37.891944,  Lng: -94.705278),  Route carried "on" structure: County highway 1196,  Year Built: 1985,  Status: Open,  Structure Length: 8.37m (27.46ft),  Average Daily Traffic: 174 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,577 (year 2041),  Design Load: HS 20,  Features Intersected: US69 HWY NB & SB,  Facility Carried by Structure: Poplar Road
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 27.45m (90.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999906900060561,  Location: 3.51 MI N OF N US-54 JCT (Lat: 37.905278,  Lng: -94.703056),  Route carried "on" structure: US 69,  Year Built: 1985,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,996 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 4,452 (year 2041),  Design Load: HS 20,  Features Intersected: WOLVERINE CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 26.010,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 63.6m (208.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 84.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 999906900060701,  Location: 6.57 MI N CRAWFORD COLN (Lat: 37.767778,  Lng: -94.705278),  Route carried "on" structure: US 69,  Year Built: 1998,  Status: Open,  Structure Length: 14.84m (48.69ft),  Average Daily Traffic: 3,152 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 4,503 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: K-7 & BNSF RR
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 10.491,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 48.70m (159.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999906900060711,  Location: 6.58 MI N CRAWFORD COLN (Lat: 37.767778,  Lng: -94.705000),  Route carried "on" structure: US 69,  Year Built: 1996,  Status: Open,  Structure Length: 14.84m (48.69ft),  Average Daily Traffic: 3,152 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 4,503 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: K-7 & BNSF RR
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 10.532,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 81.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 48.70m (159.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999906900060731,  Location: 4.1 MI N OF BOURBON SCOLN (Lat: 37.732500,  Lng: -94.704722),  Route carried "on" structure: US 69,  Year Built: 1998,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 3,152 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 4,503 (year 2041),  Design Load: HS 20,  Features Intersected: BUCK RUN CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 6.624,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 38.1m (125.0ft)

Condition: Channel: Good,  Culverts: Good,  Inventory Rating: 10.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 999906900060091,  Location: S JCT US54&US69 (Lat: 37.841667,  Lng: -94.702222),  Route carried "under" structure: US 54,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 6,982 (year 2020),  Truck Traffic: 8%,  Features Intersected: US-54 EB (WALL STREET),  Facility Carried by Structure: US-69 & K-7 HWYS
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 36.011,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 999906900060171,  Location: 0.48 MI S EJCT US54 (Lat: 37.835833,  Lng: -94.704444),  Route carried "under" structure: US 69,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 6,127 (year 2020),  Truck Traffic: 12%,  Features Intersected: US69, K7 HWY,  Facility Carried by Structure: PED OVERPASS
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 18.211,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Frame,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 999906900060181,  Location: 0.23 MI S EJCT US54 (Lat: 37.838889,  Lng: -94.702778),  Route carried "under" structure: US 69,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 6,127 (year 2020),  Truck Traffic: 12%,  Features Intersected: US69, K7 HWY,  Facility Carried by Structure: PED OVERPASS
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 18.602,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Frame,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 999906900060511,  Location: N. JCT OF US-54 (Lat: 37.854722,  Lng: -94.702500),  Route carried "under" structure: US 54,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 3,192 (year 2020),  Truck Traffic: 16%,  Features Intersected: US-54 HIGHWAY,  Facility Carried by Structure: US-69 SOUTHBOUND
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 0.489,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 999906900060521,  Location: N. JCT OF US-54 NB. (Lat: 37.854722,  Lng: -94.702222),  Route carried "under" structure: US 54,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 3,192 (year 2020),  Truck Traffic: 16%,  Features Intersected: US-54 HIGHWAY,  Facility Carried by Structure: US-69 NORTHBOUND
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 999906900060531,  Location: 0.58 MI N OF N US-54 JCT (Lat: 37.863056,  Lng: -94.703056),  Route carried "under" structure: US 69,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 3,637 (year 2020),  Truck Traffic: 15%,  Features Intersected: US69 HWY NB & SB,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 21.293,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 999906900060541,  Location: 1.57 MI N OF N US-54 JCT (Lat: 37.877222,  Lng: -94.704722),  Route carried "under" structure: US 69,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 3,637 (year 2020),  Truck Traffic: 15%,  Features Intersected: US69 HWY NB & SB,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 22.878,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 999906900060551,  Location: 2.59 MI N OF N US-54 JCT (Lat: 37.891944,  Lng: -94.705278),  Route carried "under" structure: US 69,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 2,996 (year 2020),  Truck Traffic: 18%,  Features Intersected: US69 HWY NB & SB,  Facility Carried by Structure: Poplar Road
Minimum Vertical Clearance: 5.17m (16.96ft),  Kilometerpoint: 24.520,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 999906900060701,  Location: 6.57 MI N CRAWFORD COLN (Lat: 37.767778,  Lng: -94.705278),  Route carried "under" structure: State highway 7,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 608 (year 2020),  Truck Traffic: 15%,  Features Intersected: K-7 & BNSF RR,  Facility Carried by Structure: US-69 HWY SB
Minimum Vertical Clearance: 7.31m (23.98ft),  Kilometerpoint: 17.257,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Discuss Fort Scott, Kansas (KS) on our hugely popular Kansas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.