Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Gadsden, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 78Number of bridges
  • 1,631ft / 497mTotal length
  • $186,487,000Total costs
  • 1,015,532Total average daily traffic
  • 103,189Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gadsden
  • No street view available for this location

New bridges in Gadsden, AL - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 41940-1949
  • 111950-1959
  • 91960-1969
  • 51970-1979
  • 331980-1989
  • 31990-1999
  • 12000-2009
  • 82010-2019
Reconstructed bridges in Gadsden, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 41980-1989
Average Bridge Daily Traffic in Gadsden, AL
Average Bridge Truck Traffic in Gadsden, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.5%Excellent
  • 5.0%Very good
  • 55.0%Good
  • 17.5%Satisfactory
  • 12.5%Fair
  • 2.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 5.0%Very good
  • 50.0%Good
  • 22.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Excellent
  • 5.0%Very good
  • 50.0%Good
  • 32.5%Satisfactory
  • 2.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.3%Excellent
  • 34.8%Very good
  • 34.8%Good
  • 21.7%Satisfactory
  • 4.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 5.3%Excellent
  • 21.1%Very good
  • 36.8%Good
  • 31.6%Satisfactory
  • 5.3%Fair
Find on map >>   Show street view

Structure Number: 741,  Location: FORREST AVE * BLACKCREEK (Lat: 34.019233,  Lng: -86.031497),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 3.95m (12.96ft),  Average Daily Traffic: 8,820 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,769 (year 2041),  Design Load: H 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: FORREST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,748,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $1,923,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1236,  Location: ELMWOOD AVE * NOWLIN BRAN (Lat: 34.008333,  Lng: -85.980000),  Route carried "on" structure: City street ,  Year Built: 1935,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 726 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,003 (year 2041),  Design Load: HS 15,  Features Intersected: NOWLIN BRANCH,  Facility Carried by Structure: ELMWOOD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.749,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $457,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $503,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1241,  Location: E BROAD ST * NOWLINBRANCH (Lat: 34.006200,  Lng: -85.989000),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 12,222 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,264 (year 2041),  Design Load: HS 15,  Features Intersected: NOWLIN BRANCH,  Facility Carried by Structure: EAST BROAD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.749,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 2.8m (9.2ft),  Right: 0.0m,  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $377,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $415,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1352,  Location: 0.5 MI NE US HWY 72 E (Lat: 34.750422,  Lng: -86.441953),  Route carried "on" structure: County highway 306,  Year Built: 1935,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 880 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,260 (year 2035),  Design Load: H 15,  Features Intersected: FLINT RIVER RELIEF,  Facility Carried by Structure: BROWNSBORO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 43.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.56m (18.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,030,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,133,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2054,  Location: 1.5 MI E US HWY 231 NO (Lat: 34.902753,  Lng: -86.539919),  Route carried "on" structure: County highway 137,  Year Built: 1939,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 920 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,255 (year 2035),  Design Load: HS 20,  Features Intersected: SANDIDGE CREEK,  Facility Carried by Structure: WALKER LA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $305,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2237,  Location: S 11TH ST * BLACK CREEK (Lat: 33.997508,  Lng: -86.025825),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 8,256 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 11,558 (year 2041),  Design Load: HS 15,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: S 11TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.99m (6.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $405,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2364,  Location: PARK AVE* RELIEF DITCH (Lat: 34.971667,  Lng: -85.975000),  Route carried "on" structure: City street ,  Year Built: 1940,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 1,254 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,881 (year 2041),  Design Load: HS 15,  Features Intersected: RELIEF DITCH,  Facility Carried by Structure: PARK AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.3m (30.5ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $464,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $510,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2839,  Location: HOKES ST * RELIEF DITCH (Lat: 33.991667,  Lng: -85.968333),  Route carried "on" structure: City street ,  Year Built: 1945,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 4,340 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,270 (year 2041),  Design Load: HS 15,  Features Intersected: RELIEF DITCH,  Facility Carried by Structure: HOKES ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.749,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.9m (32.5ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.32m (4.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $707,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $778,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3247,  Location: CHESTNUT ST * NOWLIN BR (Lat: 34.000000,  Lng: -85.966667),  Route carried "on" structure: City street ,  Year Built: 1948,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,170 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,914 (year 2041),  Design Load: HS 15,  Features Intersected: NOWLIN BRANCH,  Facility Carried by Structure: CHESTNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.749,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $358,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3666,  Location: HICKORY ST * BLACK CREEK (Lat: 34.006300,  Lng: -86.029600),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 3.67m (12.04ft),  Average Daily Traffic: 1,764 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 893 (year 2042),  Design Load: HS 15,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: HICKORY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.600,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.2m (30.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 26.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.59m (15.06ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,007,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,108,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4754,  Location: US 431 * US 411 (Lat: 34.013142,  Lng: -85.996158),  Route carried "on" structure: US 431,  Year Built: 1954,  Status: Temporarily open,  Structure Length: 32.19m (105.61ft),  Average Daily Traffic: 35,967 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 50,354 (year 2039),  Design Load: HS 20,  Features Intersected: COOSA RV * US 411
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 419.073,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Navigation Control: Yes ( Vertical Clearance: 10.7m (35.1ft), Horizontal Clearance: 45.7m (149.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 13,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.19m (105.61ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $15,008,000,  Roadway Improvement Cost: $1,501,000,  Total Project Cost: $16,509,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 5068,  Location: .1 MI.SO.COOSA RIVER (Lat: 34.011728,  Lng: -85.992903),  Route carried "on" structure: US 431,  Year Built: 1955,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 32,746 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 45,844 (year 2039),  Design Load: HS 20,  Features Intersected: LAKE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 418.854,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,042,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $2,246,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5392,  Location: @ BLACK CREEK PKWY (Lat: 33.990906,  Lng: -86.045486),  Route carried "on" structure: County highway 129,  Year Built: 1956,  Status: Closed,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 10,500 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,500 (year 2030),  Features Intersected: BIG WILLS CREEK,  Facility Carried by Structure: SUTTON BRIDGE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.56m (18.24ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2011,  Underwater Inspection Date: December 2009,  Other Special Inspection Date: January 2011,  Bridge Improvement Cost: $916,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,008,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6526,  Location: US 431 .6 MI SO.US 278 (Lat: 33.989042,  Lng: -85.966856),  Route carried "on" structure: US 431,  Year Built: 1959,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 9,437 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,211 (year 2040),  Design Load: HS 20,  Features Intersected: ATN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 415.055,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 65.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.35m (27.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,717,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $1,889,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6527,  Location: U S 431 .6 MI. SO. US 278 (Lat: 33.988964,  Lng: -85.966669),  Route carried "on" structure: US 431,  Year Built: 1959,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 9,437 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,211 (year 2040),  Design Load: HS 20,  Features Intersected: ATN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 415.055,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 65.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.35m (27.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,717,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $1,889,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6528,  Location: U S 431 * GOODYEAR AVE (Lat: 34.007139,  Lng: -85.975381),  Route carried "on" structure: US 431,  Year Built: 1959,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 21,000 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 29,400 (year 2039),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 417.202,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $951,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,046,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6529,  Location: US 431 * NOWLIN CREEK (Lat: 34.008333,  Lng: -85.983333),  Route carried "on" structure: US 431,  Year Built: 1959,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 21,748 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 30,447 (year 2039),  Design Load: H 15,  Features Intersected: NOWLIN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 417.969,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 36.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,950,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $2,145,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7545,  Location: I59 * BIG WILLS CK (Lat: 34.011411,  Lng: -86.075822),  Route carried "on" structure: Interstate 59,  Year Built: 1962,  Status: Open,  Structure Length: 18.35m (60.20ft),  Average Daily Traffic: 14,268 (year 2018),  Truck Traffic: 24%,  Average Future Daily Traffic: 19,975 (year 2038),  Design Load: HS 20,  Features Intersected: BIG WILLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 293.461,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 13,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 19.01m (62.37ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $3,910,000,  Roadway Improvement Cost: $391,000,  Total Project Cost: $4,301,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7765,  Location: AL 77 * I 59 (Lat: 33.997081,  Lng: -86.086772),  Route carried "on" structure: State highway 77,  Year Built: 1962,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 21,897 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 30,656 (year 2040),  Design Load: HS 20,  Features Intersected: I 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 173.080,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,140,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $2,354,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 78,  Location: AL 211 * AR (Lat: 34.076433,  Lng: -86.027500),  Route carried "on" structure: State highway 211,  Year Built: 1965,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 4,143 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,800 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.100,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,417,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $1,559,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8902,  Location: AL 211 * LITTLE WILLS CK (Lat: 34.075006,  Lng: -86.026722),  Route carried "on" structure: State highway 211,  Year Built: 1965,  Status: Open,  Structure Length: 8.90m (29.20ft),  Average Daily Traffic: 4,143 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,800 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE WILLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.972,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.87m (32.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,031,000,  Roadway Improvement Cost: $203,000,  Total Project Cost: $2,234,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10073,  Location: AL 77 * I 59 (Lat: 33.996897,  Lng: -86.086825),  Route carried "on" structure: State highway 77,  Year Built: 1969,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 21,897 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 30,656 (year 2040),  Design Load: HS 20,  Features Intersected: I 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 172.758,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 83.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,995,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $3,295,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10567,  Location: US 411 * TOWN CREEK (Lat: 34.015092,  Lng: -85.995511),  Route carried "on" structure: US 411,  Year Built: 1971,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 18,520 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,998 (year 2038),  Design Load: HS 20,  Features Intersected: TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 351.415,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 67.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $863,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $949,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11233,  Location: GEO WALLACE DR (Lat: 33.999800,  Lng: -85.993000),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 1.47m (4.82ft),  Average Daily Traffic: 28,512 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 39,204 (year 2041),  Design Load: HS 15,  Features Intersected: NOWLIN BRANCH,  Facility Carried by Structure: GEORGE WALLACEDR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.749,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $822,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $904,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12875,  Location: 3 RD ST * TOWN CK (Lat: 34.008333,  Lng: -86.015000),  Route carried "on" structure: City street ,  Year Built: 1950,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 1.75m (5.74ft),  Average Daily Traffic: 5,580 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,420 (year 2041),  Design Load: H 20,  Features Intersected: TOWN CK,  Facility Carried by Structure: 3RD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.999,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 28.3m (92.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,319,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,451,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1299,  Location: TUSCALOOSA AVE * TOWN CK (Lat: 34.033333,  Lng: -86.016667),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 10,788 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,877 (year 2041),  Design Load: H 20,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: TUSCALOOSA AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.499,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.1m (36.4ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $534,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $587,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12998,  Location: 6TH STREET * TOWN CREEK (Lat: 33.999806,  Lng: -86.000014),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 5,828 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 8,037 (year 2041),  Design Load: H 20,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: 6TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.800,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $648,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $713,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13004,  Location: 4TH ST * TOWN CK (Lat: 34.000261,  Lng: -86.000236),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 1,364 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 684 (year 2041),  Design Load: H 20,  Features Intersected: TOWN CK,  Facility Carried by Structure: 4TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.899,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.1m (26.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $745,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $820,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13159,  Location: I 759 * I 59 INTR (Lat: 34.006039,  Lng: -86.081742),  Route carried "on" structure: Spur Interstate 759,  Year Built: 1984,  Status: Open,  Structure Length: 11.46m (37.60ft),  Average Daily Traffic: 3,949 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,529 (year 2039),  Design Load: HS 20,  Features Intersected: I 59 SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.33m (40.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $4,567,000,  Roadway Improvement Cost: $457,000,  Total Project Cost: $5,024,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1316,  Location: RAMP B OVER I59 (Lat: 34.007656,  Lng: -86.077528),  Route carried "on" structure: Ramp Interstate 759,  Year Built: 1984,  Status: Open,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 7,054 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,876 (year 2039),  Design Load: HS 20,  Features Intersected: I 59 NBL *
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,467,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,614,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13161,  Location: I 59 * I 759 INTR (Lat: 34.011175,  Lng: -86.075369),  Route carried "on" structure: Ramp Interstate 759,  Year Built: 1984,  Status: Open,  Structure Length: 20.39m (66.90ft),  Average Daily Traffic: 4,378 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,129 (year 2039),  Design Load: HS 20,  Features Intersected: BIG WILLS CK,  Facility Carried by Structure: RAMP TO I 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 11,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 20.39m (66.90ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $3,775,000,  Roadway Improvement Cost: $378,000,  Total Project Cost: $4,153,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13162,  Location: I 759 * I59 INTR (Lat: 34.005658,  Lng: -86.079078),  Route carried "on" structure: Spur Interstate 759,  Year Built: 1984,  Status: Open,  Structure Length: 11.58m (37.99ft),  Average Daily Traffic: 20,970 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 29,358 (year 2039),  Design Load: HS 20,  Features Intersected: I 59 NBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.45m (40.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $3,670,000,  Roadway Improvement Cost: $367,000,  Total Project Cost: $4,037,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13163,  Location: I 759 * BROOK AVE (Lat: 34.004417,  Lng: -86.069167),  Route carried "on" structure: Spur Interstate 759,  Year Built: 1984,  Status: Open,  Structure Length: 38.50m (126.31ft),  Average Daily Traffic: 10,485 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,679 (year 2039),  Design Load: HS 20,  Features Intersected: BROOK AVE * BIG WILLS CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 25,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 38.50m (126.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $11,351,000,  Roadway Improvement Cost: $1,135,000,  Total Project Cost: $12,486,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13164,  Location: I 759 * BROOK AVE (Lat: 34.004472,  Lng: -86.071361),  Route carried "on" structure: Spur Interstate 759,  Year Built: 1984,  Status: Open,  Structure Length: 38.51m (126.35ft),  Average Daily Traffic: 10,485 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,629 (year 2039),  Design Load: HS 20,  Features Intersected: BROOK AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 26,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 38.51m (126.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $11,353,000,  Roadway Improvement Cost: $1,135,000,  Total Project Cost: $12,488,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13165,  Location: I-759 * BIG WILLS CK REL (Lat: 34.003556,  Lng: -86.064306),  Route carried "on" structure: Spur Interstate 759,  Year Built: 1984,  Status: Open,  Structure Length: 11.25m (36.91ft),  Average Daily Traffic: 20,970 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 29,358 (year 2039),  Design Load: HS 20,  Features Intersected: BIG WILLS CK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.320,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.13m (39.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,578,000,  Roadway Improvement Cost: $358,000,  Total Project Cost: $3,936,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13166,  Location: I 759 * BIG WILLS CK REL (Lat: 34.003361,  Lng: -86.064583),  Route carried "on" structure: Spur Interstate 759,  Year Built: 1984,  Status: Open,  Structure Length: 11.25m (36.91ft),  Average Daily Traffic: 10,485 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,679 (year 2039),  Design Load: HS 20,  Features Intersected: BIG WILLS CK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.320,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.13m (39.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,578,000,  Roadway Improvement Cost: $358,000,  Total Project Cost: $3,936,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13167,  Location: I 759 * BLK CK PKWAY (Lat: 33.992056,  Lng: -86.037556),  Route carried "on" structure: Spur Interstate 759,  Year Built: 1984,  Status: Open,  Structure Length: 12.13m (39.80ft),  Average Daily Traffic: 10,485 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 14,679 (year 2039),  Design Load: HS 20,  Features Intersected: BLACK CK PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.142,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.98m (42.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,827,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $4,210,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13168,  Location: I 759 * BLK CK PKWAY (Lat: 33.991778,  Lng: -86.038139),  Route carried "on" structure: Spur Interstate 759,  Year Built: 1984,  Status: Open,  Structure Length: 12.13m (39.80ft),  Average Daily Traffic: 13,236 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,531 (year 2039),  Design Load: HS 20,  Features Intersected: BLACK CREEK PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.142,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.98m (42.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,827,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $4,210,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13303,  Location: 5TH ST * TOWN CK (Lat: 33.999856,  Lng: -85.999789),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 1,612 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 684 (year 2041),  Design Load: H 20,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: 5TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.700,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.45m (8.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,173,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,290,000 ( Estimate for 2022)
Discuss Gadsden, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.