Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Gary, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 309Number of bridges
  • 4,803ft / 1,464mTotal length
  • $5,207,000Total costs
  • 7,885,081Total average daily traffic
  • 1,587,602Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gary
  • No street view available for this location

New bridges in Gary, IN - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 51930-1939
  • 451950-1959
  • 361960-1969
  • 111970-1979
  • 191980-1989
  • 181990-1999
  • 1512000-2009
  • 232010-2019
Reconstructed bridges in Gary, IN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 51970-1979
  • 81980-1989
  • 91990-1999
  • 172000-2009
  • 142010-2019
  • 22020-2022
Average Bridge Daily Traffic in Gary, IN
Average Bridge Truck Traffic in Gary, IN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 23.7%Very good
  • 45.9%Good
  • 27.4%Satisfactory
  • 1.5%Fair
  • 1.5%Poor
  • 0.7%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 36.8%Excellent
  • 32.4%Very good
  • 16.9%Good
  • 8.1%Satisfactory
  • 4.4%Fair
  • 1.5%Poor
  • 0.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 0.7%Excellent
  • 22.1%Very good
  • 61.0%Good
  • 8.1%Satisfactory
  • 4.4%Fair
  • 3.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.6%Excellent
  • 46.2%Very good
  • 33.3%Good
  • 10.3%Satisfactory
  • 5.1%Fair
  • 2.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 85.7%Good
  • 14.3%Satisfactory
Find on map >>   Show street view

Structure Number: 4669,  Location: 00.36 E SR 51 (Lat: 41.592689,  Lng: -87.232544),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 34,670 (year 2014),  Truck Traffic: 14%,  Features Intersected: I-90 WB
Minimum Vertical Clearance: 9.48m (31.10ft),  Kilometerpoint: 33.249,  Lanes on structure: 1,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 4669,  Location: 00.36 E SR 51 (Lat: 41.592689,  Lng: -87.232544),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 5,780 (year 2014),  Truck Traffic: 14%,  Features Intersected: I-90 RAMP D
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 33.249,  Lanes on structure: 1,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 467,  Location: 00.38 E SR 51 (Lat: 41.593031,  Lng: -87.233361),  Route carried "under" structure: Interstate 90,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 34,670 (year 2014),  Truck Traffic: 14%,  Features Intersected: I-90 EB
Minimum Vertical Clearance: 6.25m (20.51ft),  Kilometerpoint: 33.281,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.4m (63.6ft)

Find on map >>   Show street view

Structure Number: 467,  Location: 00.38 E SR 51 (Lat: 41.593031,  Lng: -87.233361),  Route carried "under" structure: Interstate 90,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 34,670 (year 2014),  Truck Traffic: 14%,  Features Intersected: I-90 WB
Minimum Vertical Clearance: 6.25m (20.51ft),  Kilometerpoint: 33.281,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.4m (63.6ft)

Find on map >>   Show street view

Structure Number: 76504,  Location: 01.75 E US-12 (Lat: 41.609131,  Lng: -87.360292),  Route carried "under" structure: Interstate 90,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 40,730 (year 2015),  Truck Traffic: 10%,  Features Intersected: I-90 EBL (ITR)
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 21.404,  Lanes on structure: 2,  Lanes under structure: 7,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 24.8m (81.4ft)

Find on map >>   Show street view

Structure Number: 76504,  Location: 01.75 E US-12 (Lat: 41.609131,  Lng: -87.360292),  Route carried "under" structure: Interstate 90,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 40,730 (year 2015),  Truck Traffic: 10%,  Features Intersected: I-90 WBL (ITR)
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 21.404,  Lanes on structure: 2,  Lanes under structure: 7,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 24.8m (81.4ft)

Find on map >>   Show street view

Structure Number: 76506,  Location: 00.22 E I-65 (Lat: 41.570019,  Lng: -87.296411),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 51,070 (year 2010),  Truck Traffic: 32%,  Features Intersected: RAMPS NED, EB-CD,  Facility Carried by Structure: COLORADO STREET
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 19.264,  Lanes on structure: 2,  Lanes under structure: 13,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 76506,  Location: 00.22 E I-65 (Lat: 41.570019,  Lng: -87.296411),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 51,070 (year 2010),  Truck Traffic: 32%,  Features Intersected: RAMPS WSDIR, WNF,  Facility Carried by Structure: COLORADO STREET
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 19.264,  Lanes on structure: 2,  Lanes under structure: 13,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 76506,  Location: 00.22 E I-65 (Lat: 41.570019,  Lng: -87.296411),  Route carried "under" structure: Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 51,070 (year 2006),  Truck Traffic: 32%,  Features Intersected: I-80 MAINLINE WBL,  Facility Carried by Structure: COLORADO STREET
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 19.264,  Lanes on structure: 2,  Lanes under structure: 13,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 76516,  Location: 00.93 E SR-53 (Lat: 41.567369,  Lng: -87.318603),  Route carried "under" structure: Interstate 80,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 51,933 (year 2004),  Truck Traffic: 25%,  Features Intersected: I-80 EBL,  Facility Carried by Structure: MARTIN LUTHER KING
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 17.413,  Lanes on structure: 4,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 46.9m (153.9ft)

Find on map >>   Show street view

Structure Number: 76516,  Location: 00.93 E SR-53 (Lat: 41.567369,  Lng: -87.318603),  Route carried "under" structure: Interstate 80,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 51,933 (year 2004),  Truck Traffic: 25%,  Features Intersected: I-80 WBL,  Facility Carried by Structure: MARTIN LUTHER KING
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 17.413,  Lanes on structure: 4,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 46.9m (153.9ft)

Find on map >>   Show street view

Structure Number: 76516,  Location: 00.93 E SR-53 (Lat: 41.567369,  Lng: -87.318603),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2004),  Truck Traffic: 25%,  Features Intersected: I-80 WBL Ramp from I-65,  Facility Carried by Structure: MARTIN LUTHER KING
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 17.413,  Lanes on structure: 4,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 46.9m (153.9ft)

Find on map >>   Show street view

Structure Number: 76518,  Location: 01.00 W SR-53 (Lat: 41.569031,  Lng: -87.356103),  Route carried "under" structure: Interstate 80,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 96,221 (year 2004),  Truck Traffic: 37%,  Features Intersected: I80 (I94) WBL,  Facility Carried by Structure: GRANT STREET
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 14.307,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 39.4m (129.3ft)

Find on map >>   Show street view

Structure Number: 76518,  Location: 01.00 W SR-53 (Lat: 41.569031,  Lng: -87.356103),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2004),  Truck Traffic: 37%,  Features Intersected: I-80 (I-94) EBL C/D,  Facility Carried by Structure: GRANT STREET
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 14.307,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 39.4m (129.3ft)

Find on map >>   Show street view

Structure Number: 76518,  Location: 01.00 W SR-53 (Lat: 41.569031,  Lng: -87.356103),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2004),  Truck Traffic: 37%,  Features Intersected: I-80 (I-94) WBL C/D,  Facility Carried by Structure: GRANT STREET
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 14.307,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 39.4m (129.3ft)

Find on map >>   Show street view

Structure Number: 76518,  Location: 01.00 W SR-53 (Lat: 41.569031,  Lng: -87.356103),  Route carried "under" structure: Interstate 80,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 96,221 (year 2004),  Truck Traffic: 37%,  Features Intersected: I80 (I94) EBL,  Facility Carried by Structure: GRANT STREET
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 14.307,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 39.4m (129.3ft)

Find on map >>   Show street view

Structure Number: 7652,  Location: 02.40 S US-12 (Lat: 41.567500,  Lng: -87.336686),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2006),  Truck Traffic: 37%,  Features Intersected: I-80 (I-94) EBL C/D,  Facility Carried by Structure: SR 53
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 15.916,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 38.5m (126.3ft)

Find on map >>   Show street view

Structure Number: 7652,  Location: 02.40 S US-12 (Lat: 41.567500,  Lng: -87.336686),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2006),  Truck Traffic: 37%,  Features Intersected: I-80 (I-94) WBL C/D,  Facility Carried by Structure: SR 53
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 15.916,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 38.5m (126.3ft)

Find on map >>   Show street view

Structure Number: 7652,  Location: 02.40 S US-12 (Lat: 41.567500,  Lng: -87.336686),  Route carried "under" structure: Interstate 80,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 95,330 (year 2006),  Truck Traffic: 37%,  Features Intersected: I-80 (I-94) WBL,  Facility Carried by Structure: SR 53
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 15.916,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 38.5m (126.3ft)

Find on map >>   Show street view

Structure Number: 7652,  Location: 02.40 S US-12 (Lat: 41.567500,  Lng: -87.336686),  Route carried "under" structure: Interstate 80,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 95,330 (year 2006),  Truck Traffic: 37%,  Features Intersected: I-80 (I-94) EBL,  Facility Carried by Structure: SR 53
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 15.916,  Lanes on structure: 6,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 38.5m (126.3ft)

Find on map >>   Show street view

Structure Number: 76746,  Location: 06.39 N US-30 (Lat: 41.562231,  Lng: -87.307733),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2008),  Truck Traffic: 25%,  Features Intersected: RAMP I-80-94 W TO I-65 S
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 18.910,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.9m (150.6ft)

Find on map >>   Show street view

Structure Number: 7675,  Location: 06.45 N US 30 (Lat: 41.562461,  Lng: -87.306769),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2008),  Truck Traffic: 24%,  Features Intersected: I-65 SBL TO I-80-94 WBL,  Facility Carried by Structure: I-65 NB
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 18.910,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 75.7m (248.4ft)

Find on map >>   Show street view

Structure Number: 76752,  Location: 06.45 N US-30 (Lat: 41.562669,  Lng: -87.306847),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2008),  Truck Traffic: 24%,  Features Intersected: I-65 NBL TO I-80-94 WBL,  Facility Carried by Structure: I-65 SB
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 18.910,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 72.3m (237.2ft)

Find on map >>   Show street view

Structure Number: 76754,  Location: 01.18 E SR 53 (Lat: 41.567250,  Lng: -87.313850),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2008),  Truck Traffic: 30%,  Features Intersected: I-65 NB TO I-80 WB,  Facility Carried by Structure: I-80/94 EB
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 418.687,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 76756,  Location: 01.18 E SR 53 (Lat: 41.567439,  Lng: -87.314117),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2008),  Truck Traffic: 30%,  Features Intersected: I-65 NB TO I-80 WB,  Facility Carried by Structure: I-80/94 WB
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 418.703,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 76766,  Location: 00.92 E I-65 (Lat: 41.572250,  Lng: -87.283569),  Route carried "under" structure: City street ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 5,200 (year 2008),  Truck Traffic: 12%,  Features Intersected: CENTRAL AVENUE,  Facility Carried by Structure: I-80 EB
Minimum Vertical Clearance: 7.04m (23.10ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 76768,  Location: 00.92 E I-65 (Lat: 41.572400,  Lng: -87.284019),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 5,200 (year 2008),  Truck Traffic: 12%,  Features Intersected: CENTRAL AVE,  Facility Carried by Structure: I-80 WB
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 7677,  Location: 01.18 E I-65 (Lat: 41.573169,  Lng: -87.278747),  Route carried "under" structure: City street ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 1,200 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-80 EB,  Facility Carried by Structure: CLAY STREET
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 76772,  Location: 01.18 E I-65 (Lat: 41.573469,  Lng: -87.278778),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 1,200 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-80 WB,  Facility Carried by Structure: CLAY STREET
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 76774,  Location: 07.00 N US 30 (Lat: 41.569150,  Lng: -87.300392),  Route carried "under" structure: Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2008),  Truck Traffic: 26%,  Features Intersected: I-65 NB RAMP
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 18.926,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 76774,  Location: 07.00 N US 30 (Lat: 41.569150,  Lng: -87.300392),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2008),  Truck Traffic: 26%,  Features Intersected: I-65 NB RAMP
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 18.926,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 76774,  Location: 07.00 N US 30 (Lat: 41.569150,  Lng: -87.300392),  Route carried "under" structure: Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2008),  Truck Traffic: 26%,  Features Intersected: I-65 NB RAMP
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 18.926,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 76776,  Location: 07.00 N US 30 (Lat: 41.569150,  Lng: -87.300736),  Route carried "under" structure: Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2008),  Truck Traffic: 28%,  Features Intersected: I-65
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 18.910,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 76776,  Location: 07.00 N US 30 (Lat: 41.569150,  Lng: -87.300736),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2008),  Truck Traffic: 28%,  Features Intersected: I-65
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 18.910,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 76776,  Location: 07.00 N US 30 (Lat: 41.569150,  Lng: -87.300736),  Route carried "under" structure: Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2008),  Truck Traffic: 28%,  Features Intersected: I-65
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 18.910,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 7678,  Location: 07.00 N US 30 (Lat: 41.569111,  Lng: -87.301094),  Route carried "under" structure: Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2008),  Truck Traffic: 28%,  Features Intersected: I-80/94 EBL,  Facility Carried by Structure: I-65 SB RAMP
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 18.926,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 7678,  Location: 07.00 N US 30 (Lat: 41.569111,  Lng: -87.301094),  Route carried "under" structure: Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2008),  Truck Traffic: 28%,  Features Intersected: I-80/94 WBL,  Facility Carried by Structure: I-65 SB RAMP
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 18.926,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 7678,  Location: 07.00 N US 30 (Lat: 41.569111,  Lng: -87.301094),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2008),  Truck Traffic: 28%,  Features Intersected: I-80 EBL COLLECT-DISTRIB,  Facility Carried by Structure: I-65 SB RAMP
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 18.926,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 76782,  Location: 06.91 N US 30 (Lat: 41.568739,  Lng: -87.302764),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2008),  Truck Traffic: 28%,  Features Intersected: I-80 EBL RAMP SEC,  Facility Carried by Structure: I-65 SB RAMP WSDIR
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 18.733,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.6m (189.0ft)

Find on map >>   Show street view

Structure Number: 76782,  Location: 06.91 N US 30 (Lat: 41.568739,  Lng: -87.302764),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 2008),  Truck Traffic: 10%,  Features Intersected: I-80/94 WB RAMP SW,  Facility Carried by Structure: I-65 SB RAMP WSDIR
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 18.733,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.6m (189.0ft)

Find on map >>   Show street view

Structure Number: 76782,  Location: 06.91 N US 30 (Lat: 41.568739,  Lng: -87.302764),  Route carried "under" structure: Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 44,620 (year 2014),  Truck Traffic: 28%,  Features Intersected: I-80/94 EB,  Facility Carried by Structure: I-65 SB RAMP WSDIR
Minimum Vertical Clearance: 7.24m (23.75ft),  Kilometerpoint: 18.733,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.6m (189.0ft)

Find on map >>   Show street view

Structure Number: 76782,  Location: 06.91 N US 30 (Lat: 41.568739,  Lng: -87.302764),  Route carried "under" structure: Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 44,620 (year 2014),  Truck Traffic: 28%,  Features Intersected: I-80/94 WB,  Facility Carried by Structure: I-65 SB RAMP WSDIR
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 18.733,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.6m (189.0ft)

Find on map >>   Show street view

Structure Number: 76782,  Location: 06.91 N US 30 (Lat: 41.568739,  Lng: -87.302764),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2000),  Truck Traffic: 28%,  Features Intersected: I-80/94 EB-CD RAMP,  Facility Carried by Structure: I-65 SB RAMP WSDIR
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 18.733,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.6m (189.0ft)

Find on map >>   Show street view

Structure Number: 76784,  Location: 07.10 N US 30 (Lat: 41.570269,  Lng: -87.299706),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2008),  Truck Traffic: 9%,  Features Intersected: I80 WBL TO I65 SBL RAMP
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 18.910,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 769,  Location: 00.50 E SR 53 (Lat: 41.567419,  Lng: -87.327081),  Route carried "under" structure: Interstate 80,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 80,363 (year 2014),  Truck Traffic: 35%,  Features Intersected: I-80 WB,  Facility Carried by Structure: GEORGIA STREET
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 16.721,  Lanes on structure: 4,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 769,  Location: 00.50 E SR 53 (Lat: 41.567419,  Lng: -87.327081),  Route carried "under" structure: Interstate 80,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 80,363 (year 2014),  Truck Traffic: 35%,  Features Intersected: I-80 EB,  Facility Carried by Structure: GEORGIA STREET
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 16.721,  Lanes on structure: 4,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 76948,  Location: 02.03 W SR 53 (Lat: 41.569719,  Lng: -87.375817),  Route carried "under" structure: Interstate 80,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 88,412 (year 2015),  Truck Traffic: 28%,  Features Intersected: I-80/94 EB,  Facility Carried by Structure: CHASE STREET
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 12.649,  Lanes on structure: 4,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 76948,  Location: 02.03 W SR 53 (Lat: 41.569719,  Lng: -87.375817),  Route carried "under" structure: Interstate 80,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 88,412 (year 2015),  Truck Traffic: 28%,  Features Intersected: I-80/94 WB,  Facility Carried by Structure: CHASE STREET
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 12.649,  Lanes on structure: 4,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 4500158,  Location: 00.30 N US 12 (Lat: 41.614161,  Lng: -87.222550),  Route carried "under" structure: ServiceFederal lands road ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 2,251 (year 2012),  Truck Traffic: 5%,  Features Intersected: NATIONAL PARK ROAD,  Facility Carried by Structure: COUNTY LINE RD
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 4500209,  Location: 00.70 E. of SR 912 (Lat: 41.639169,  Lng: -87.418556),  Route carried "under" structure: ServiceOther road ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 20 (year 2010),  Truck Traffic: 2%,  Features Intersected: ACCESS ROAD,  Facility Carried by Structure: BUFFINGTON HRBR DR
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 450021,  Location: 00.70 E. of SR 912 (Lat: 41.639419,  Lng: -87.418944),  Route carried "under" structure: Alternate City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2010),  Truck Traffic: 2%,  Features Intersected: ACCESS ROAD,  Facility Carried by Structure: ACCESS ROAD RAMP
Minimum Vertical Clearance: 7.44m (24.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.6m (97.1ft)

Discuss Gary, Indiana (IN) on our hugely popular Indiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.