Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hermitage, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 55Number of bridges
  • 440ft / 134mTotal length
  • $4,690,000Total costs
  • 363,301Total average daily traffic
  • 87,110Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hermitage
  • No street view available for this location

New bridges in Hermitage, PA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11940-1949
  • 81950-1959
  • 281960-1969
  • 41970-1979
  • 41990-1999
  • 52000-2009
  • 42010-2019
Reconstructed bridges in Hermitage, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31970-1979
  • 41980-1989
  • 21990-1999
  • 22000-2009
  • 12010-2019
  • 42020-2022
Average Bridge Daily Traffic in Hermitage, PA
Average Bridge Truck Traffic in Hermitage, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.4%Excellent
  • 21.9%Very good
  • 28.1%Good
  • 31.3%Satisfactory
  • 6.3%Fair
  • 3.1%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.3%Excellent
  • 37.5%Very good
  • 6.3%Good
  • 21.9%Satisfactory
  • 15.6%Fair
  • 6.3%Poor
  • 3.1%Serious
  • 3.1%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.1%Excellent
  • 15.6%Very good
  • 18.8%Good
  • 28.1%Satisfactory
  • 21.9%Fair
  • 9.4%Poor
  • 3.1%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 38.9%Good
  • 13.9%Satisfactory
  • 16.7%Fair
  • 5.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.1%Very good
  • 18.2%Good
  • 27.3%Satisfactory
  • 27.3%Fair
  • 18.2%Poor
Find on map >>   Show street view

Structure Number: 25692,  Location: SHENANGO TOWNSHIP (Lat: 41.184589,  Lng: -80.443267),  Route carried "on" structure: Interstate 376,  Year Built: 1966,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 10.88m (35.70ft),  Average Daily Traffic: 7,530 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 11,700 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 60,NB BEAVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.80m (38.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $56,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $757,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 25695,  Location: SHENANGO TOWNSHIP (Lat: 41.184589,  Lng: -80.443644),  Route carried "on" structure: Interstate 376,  Year Built: 1966,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 10.79m (35.40ft),  Average Daily Traffic: 10,107 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 11,747 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 60,SB BEAVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.70m (38.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $163,000,  Total Project Cost: $747,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 25697,  Location: SHENANGO TOWNSHIP (Lat: 41.187314,  Lng: -80.455858),  Route carried "on" structure: State highway 760,  Year Built: 1966,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 7,406 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 7,816 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SR 18,S HERMITAGE,  Facility Carried by Structure: SR 60,NB/SB BEAVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.046,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $161,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 25704,  Location: CITY OF HERMITAGE (Lat: 41.231017,  Lng: -80.496222),  Route carried "on" structure: US 62,  Year Built: 1955,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 12,338 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,495 (year 2032),  Design Load: H 20,  Features Intersected: OVER PINE RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.914,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 25 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 25705,  Location: CITY OF HERMITAGE (Lat: 41.230297,  Lng: -80.492864),  Route carried "on" structure: US 62,  Year Built: 1955,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10,058 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,416 (year 2032),  Design Load: H 20,  Features Intersected: OVER PINE RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.914,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 25707,  Location: CITY OF HERMITAGE (Lat: 41.232144,  Lng: -80.446692),  Route carried "on" structure: US 62,  Year Built: 1955,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 6,392 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,401 (year 2032),  Design Load: H 20,  Features Intersected: OVER PINE HOLLOW CK BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.737,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Inventory Rating: 85.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 25708,  Location: CITY OF HERMITAGE (Lat: 41.237553,  Lng: -80.391186),  Route carried "on" structure: US 62,  Year Built: 1948,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,904 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,535 (year 2032),  Design Load: H 20,  Features Intersected: OVER SHENANGO RIVER TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.389,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $62,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 25769,  Location: SHENANGO TOWNSHIP (Lat: 41.182944,  Lng: -80.471142),  Route carried "on" structure: Interstate 80,  Year Built: 1966,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 18.87m (61.91ft),  Average Daily Traffic: 15,099 (year 2021),  Truck Traffic: 42%,  Average Future Daily Traffic: 17,350 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER ABANDON RR &SHNGO R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.044,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.50m (63.98ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $476,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25774,  Location: SHENANGO TOWNSHIP (Lat: 41.184661,  Lng: -80.440847),  Route carried "on" structure: Interstate 80,  Year Built: 1966,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 32,903 (year 2021),  Truck Traffic: 34%,  Average Future Daily Traffic: 36,244 (year 2032),  Design Load: HS 20,  Features Intersected: OVER HOGBACK RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.465,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 54.9m (180.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 25776,  Location: SHENANGO TOWNSHIP (Lat: 41.183361,  Lng: -80.422431),  Route carried "on" structure: Interstate 80,  Year Built: 1966,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 15,835 (year 2021),  Truck Traffic: 32%,  Average Future Daily Traffic: 17,657 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 318,W MDDSX-MER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.077,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $477,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 25777,  Location: SHENANGO TOWNSHIP (Lat: 41.183528,  Lng: -80.421681),  Route carried "on" structure: Interstate 80,  Year Built: 1966,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 15,595 (year 2021),  Truck Traffic: 37%,  Average Future Daily Traffic: 16,802 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 318,W MDDSX-MER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.052,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $19,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $257,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 25778,  Location: SHENANGO TOWNSHIP (Lat: 41.182964,  Lng: -80.388439),  Route carried "on" structure: Interstate 80,  Year Built: 1965,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 15,835 (year 2021),  Truck Traffic: 32%,  Average Future Daily Traffic: 17,657 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER NESHANNOCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.475,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25779,  Location: SHENANGO TOWNSHIP (Lat: 41.183267,  Lng: -80.388478),  Route carried "on" structure: Interstate 80,  Year Built: 1965,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 15,595 (year 2021),  Truck Traffic: 37%,  Average Future Daily Traffic: 16,802 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER NESHANNOCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.406,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.70m (15.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25781,  Location: LACKAWANNOCK TOWNSHIP (Lat: 41.185506,  Lng: -80.364131),  Route carried "on" structure: Interstate 80,  Year Built: 1965,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 15,595 (year 2021),  Truck Traffic: 37%,  Average Future Daily Traffic: 16,802 (year 2032),  Design Load: HS 20,  Features Intersected: OVER T300,GREENFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.873,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25887,  Location: SHENANGO TOWNSHIP (Lat: 41.188892,  Lng: -80.492014),  Route carried "on" structure: Spur State highway 718,  Year Built: 1962,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 3,374 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,781 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SHENANGO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.820,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.60m (21.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 25896,  Location: CITY OF HERMITAGE (Lat: 41.262992,  Lng: -80.495411),  Route carried "on" structure: State highway 846,  Year Built: 1997,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,053 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,847 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER MCCULLOUGH RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.795,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25981,  Location: CITY OF HERMITAGE (Lat: 41.191944,  Lng: -80.468003),  Route carried "on" structure: State highway 760,  Year Built: 1950,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 7,405 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 7,815 (year 2032),  Design Load: HL 93,  Features Intersected: OVER SHENANGO RIVER TR,  Facility Carried by Structure: SR 60,BROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.157,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Poor,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $9,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $124,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25989,  Location: CITY OF HERMITAGE (Lat: 41.233406,  Lng: -80.446953),  Route carried "on" structure: Business US 62B,  Year Built: 1996,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10,021 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,572 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER SHENANGO RIVER TRIB,  Facility Carried by Structure: SR 3008,E.STATE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.434,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,232,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 2599,  Location: LACKAWANNOCK TOWNSHIP (Lat: 41.163769,  Lng: -80.378300),  Route carried "on" structure: State highway ,  Year Built: 1954,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 315 (year 2022),  Truck Traffic: 13%,  Average Future Daily Traffic: 588 (year 2032),  Design Load: H 20,  Features Intersected: OVER LT NESHANNOCK CK,  Facility Carried by Structure: SR 3009,BUCKWATER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.940,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $36,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $483,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25992,  Location: SHENANGO TOWNSHIP (Lat: 41.182989,  Lng: -80.394214),  Route carried "on" structure: State highway ,  Year Built: 1965,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 860 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,123 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 3011,BETHEL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.478,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.90m (25.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $73,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $987,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 26004,  Location: CITY OF HERMITAGE (Lat: 41.260239,  Lng: -80.514875),  Route carried "on" structure: State highway ,  Year Built: 1957,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 397 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 591 (year 2032),  Design Load: HL 93,  Features Intersected: OVER TOWEL WORKS RUN,  Facility Carried by Structure: SR 3019,ORANGEVILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.455,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 26022,  Location: MUNICIPALITY OF HERMITAGE (Lat: 41.253031,  Lng: -80.456119),  Route carried "on" structure: State highway ,  Year Built: 1973,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 4,872 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,283 (year 2032),  Design Load: HS 20,  Features Intersected: OVER PINE HOLLOW RUN,  Facility Carried by Structure: SR 3035,DUTCH LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.668,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $156,000
Find on map >>   Show street view

Structure Number: 26163,  Location: HASSEL RD,JEFFERSON TWP (Lat: 41.267683,  Lng: -80.385489),  Route carried "on" structure: City street 7211,  Year Built: 1975,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 152 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 210 (year 2039),  Design Load: HS 20,  Features Intersected: OVER MAGARGEE RUN,  Facility Carried by Structure: BRIDGE 1916,T-547
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Poor,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26165,  Location: CLAY FURNACE,JEFFERSON (Lat: 41.270472,  Lng: -80.385347),  Route carried "on" structure: City street 7211,  Year Built: 1973,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 85 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 120 (year 2039),  Design Load: HS 20,  Features Intersected: OVER MAGARGEE RUN,  Facility Carried by Structure: BRIDGE 1915,T-549
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Fair,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $128,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26258,  Location: LONGVIEW RD,SHENANGO TWP. (Lat: 41.186436,  Lng: -80.436936),  Route carried "on" structure: City street 7224,  Year Built: 1966,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 850 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,190 (year 2039),  Design Load: HS 20,  Features Intersected: OVER HOG BACK RUN,  Facility Carried by Structure: BRIDGE 2813,T-412
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 26264,  Location: ORANGEVLE OVER TOWEL WRK (Lat: 41.269300,  Lng: -80.519103),  Route carried "on" structure: City street 7225,  Year Built: 1964,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 704 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 990 (year 2039),  Design Load: HS 20,  Features Intersected: OVER TOWEL WORKS RUN,  Facility Carried by Structure: BRIDGE 1851
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Poor,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $1,000
Find on map >>   Show street view

Structure Number: 26325,  Location: KELLY ROAD,HERMITAGE (Lat: 41.267658,  Lng: -80.470397),  Route carried "on" structure: City street 7303,  Year Built: 1967,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 668 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 940 (year 2039),  Design Load: HS 20,  Features Intersected: OVER SHENANGO RIVER,  Facility Carried by Structure: BRIDGE 2303,T-388
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $454,000,  Total Project Cost: $1,000,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 26326,  Location: KELLY ROAD, HERMITAGE (Lat: 41.267594,  Lng: -80.470264),  Route carried "on" structure: City street ,  Year Built: 1897,  Status: Closed,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 412 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 580 (year 2030),  Features Intersected: OVER SHENANGO RIVER,  Facility Carried by Structure: BRIDGE 2304,T-388
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 54.6m (179.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Critical,  Superstructure: Failed,  Substructure: Fair,  Channel: Very good,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $134,000,  Roadway Improvement Cost: $389,000,  Total Project Cost: $1,000,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 26328,  Location: WISE ROAD,HERMITAGE (Lat: 41.205181,  Lng: -80.394808),  Route carried "on" structure: US 425,  Year Built: 1975,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 75 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 110 (year 2039),  Design Load: HS 20,  Features Intersected: OVER W. BR. LT.NESHANNOC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 21.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2019,  Other Special Inspection Date: September 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26329,  Location: ROBERTSON RD.HERMITAGE (Lat: 41.261769,  Lng: -80.422225),  Route carried "on" structure: City street 7303,  Year Built: 1956,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 371 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 520 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: OVER GOLDEN RUN,  Facility Carried by Structure: BRIDGE 2310,T-446
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Poor,  Channel: Satisfactory,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2633,  Location: ROMBOLD RD.,HERMITAGE (Lat: 41.215275,  Lng: -80.463278),  Route carried "on" structure: City street 7303,  Year Built: 1958,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,056 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,480 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: OVER BOBBY RUN,  Facility Carried by Structure: BRIDGE 2325,T-461
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 39487,  Location: CITY OF HERMITAGE (Lat: 41.201953,  Lng: -80.458186),  Route carried "on" structure: State highway 518,  Year Built: 1997,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 5,651 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,562 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER BOBBY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Poor,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40538,  Location: SOUTH PYMATUNING TOWNSHIP (Lat: 41.272731,  Lng: -80.492289),  Route carried "on" structure: State highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 2,280 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,673 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: OVER MCCULLOUGH RUN,  Facility Carried by Structure: SR 3018,BUCKEYE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41683,  Location: CLAYFURNACE RD JEFFERSON (Lat: 41.262575,  Lng: -80.383736),  Route carried "on" structure: City street 7211,  Year Built: 2002,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 141 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 200 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: OVER MAGARGEE RUN,  Facility Carried by Structure: BRIDGE 1917,T-496
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 42111,  Location: LYNNWOOD RD.,HERMITAGE (Lat: 41.193481,  Lng: -80.464700),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,572 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,200 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: OVER BOBBY RUN,  Facility Carried by Structure: BRIDGE 2324,T-307
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 42875,  Location: CITY OF HERMITAGE (Lat: 41.257783,  Lng: -80.456903),  Route carried "on" structure: State highway 518,  Year Built: 2006,  Status: Open,  Structure Length: 11.25m (36.91ft),  Average Daily Traffic: 8,155 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,185 (year 2032),  Design Load: HL 93,  Features Intersected: PINE HOLLOW RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.487,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44256,  Location: HOGBACK RD., HERMITAGE (Lat: 41.194061,  Lng: -80.434350),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 201 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 280 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: OVER HOGBACK RUN,  Facility Carried by Structure: BRIDGE 2323
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft)

Condition: Channel: Good,  Culverts: Very good,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 47049,  Location: JEFFERSON TWP (Lat: 41.249778,  Lng: -80.366758),  Route carried "on" structure: State highway ,  Year Built: 2011,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 846 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,287 (year 2032),  Design Load: HL 93,  Features Intersected: TR TO MAGARGEE RUN,  Facility Carried by Structure: SR 3020. Lamor Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.258,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 47912,  Location: SOUTH PYMATUNING TWP (Lat: 41.301575,  Lng: -80.505503),  Route carried "on" structure: State highway 718,  Year Built: 2013,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1,624 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,503 (year 2032),  Design Load: HL 93,  Features Intersected: MCCULLOUGH RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.295,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Hermitage, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.