Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hoover, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 97Number of bridges
  • 2,034ft / 620mTotal length
  • $298,088,000Total costs
  • 3,091,276Total average daily traffic
  • 361,645Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hoover
  • No street view available for this location

New bridges in Hoover, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 81960-1969
  • 491970-1979
  • 201980-1989
  • 41990-1999
  • 112000-2009
  • 22010-2019
  • 22020-2022
Reconstructed bridges in Hoover, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 21990-1999
Average Bridge Daily Traffic in Hoover, AL
Average Bridge Truck Traffic in Hoover, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.6%Excellent
  • 5.5%Very good
  • 16.4%Good
  • 70.9%Satisfactory
  • 3.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.6%Excellent
  • 10.9%Very good
  • 14.5%Good
  • 63.6%Satisfactory
  • 7.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.8%Excellent
  • 7.3%Very good
  • 29.1%Good
  • 60.0%Satisfactory
  • 1.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.2%Very good
  • 17.2%Good
  • 51.7%Satisfactory
  • 10.3%Fair
  • 3.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 37.5%Satisfactory
  • 37.5%Fair
Find on map >>   Show street view

Structure Number: 198,  Location: 0.1 MI S JCT US 31 (Lat: 33.126539,  Lng: -86.753753),  Route carried "on" structure: County highway 211,  Year Built: 1922,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 50 (year 2021),  Average Future Daily Traffic: 70 (year 2041),  Features Intersected: RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $543,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $597,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 214,  Location: SEC. 2 T11N R20E (Lat: 31.960100,  Lng: -86.017700),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 500 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 600 (year 2035),  Design Load: HS 20,  Features Intersected: BEAMON CREEK,  Facility Carried by Structure: COUNTY ROAD 7707
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.51m (8.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $580,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $638,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6694,  Location: SOUTHLAND DR * PATTON CK (Lat: 33.400000,  Lng: -86.800000),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 7,899 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,086 (year 2040),  Design Load: H 15,  Features Intersected: PATTON CREEK,  Facility Carried by Structure: SOUTHLAND DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7179,  Location: 0.8 MI S AL 150 (HOOVER) (Lat: 33.338656,  Lng: -86.874794),  Route carried "on" structure: County highway 405,  Year Built: 1960,  Status: Open,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 13,170 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,395 (year 2040),  Design Load: H 15,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: SO.SHADES CREST R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.9m (78.4ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.37m (11.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $763,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $839,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8425,  Location: CREEKVIEW DR * PATTON CK (Lat: 33.400000,  Lng: -86.800000),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Posted for load,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 3,796 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,036 (year 2040),  Design Load: H 15,  Features Intersected: PATTON CREEK,  Facility Carried by Structure: CREEKVIEW DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $565,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $622,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8426,  Location: KESTWICK DR * PATTON CK (Lat: 33.400000,  Lng: -86.800000),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 1,564 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,785 (year 2040),  Design Load: H 15,  Features Intersected: PATTON CREEK,  Facility Carried by Structure: KESTWICK DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $867,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8429,  Location: DEODARA DR * STARLAKE DR (Lat: 33.400000,  Lng: -86.800000),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,723 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,881 (year 2040),  Design Load: H 15,  Features Intersected: LAKE DRAINAGE,  Facility Carried by Structure: DEODARA DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $229,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $252,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8472,  Location: 1 MILE SOUTH OF HOOVER (Lat: 33.376500,  Lng: -86.827700),  Route carried "on" structure: County highway 502,  Year Built: 1964,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,530 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,250 (year 2040),  Design Load: H 20,  Features Intersected: HURRICANE BRANCH,  Facility Carried by Structure: AL SEIER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.8m (12.5ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 27.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $272,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $299,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8936,  Location: 1.75 MI E LORNA RD (Lat: 33.393200,  Lng: -86.771817),  Route carried "on" structure: County highway 527,  Year Built: 1965,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 5,776 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,000 (year 2041),  Design Load: H 20,  Features Intersected: LITTLE SHADES CREEK,  Facility Carried by Structure: OLD ROCKY RIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,009,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,110,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 10601,  Location: LOCH HAVEN RD * LOCHHAVEN (Lat: 33.383333,  Lng: -86.783333),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 1,251 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,242 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: LOCH HAVEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $849,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $934,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11743,  Location: I 459 * US 31 (Lat: 33.384800,  Lng: -86.806300),  Route carried "on" structure: Interstate 459,  Year Built: 1977,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 8.72m (28.61ft),  Average Daily Traffic: 54,815 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 69,309 (year 2040),  Design Load: HS 20,  Features Intersected: AL - 3 (US 31)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.370,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.6m (67.6ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.70m (31.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,655,000,  Roadway Improvement Cost: $466,000,  Total Project Cost: $5,121,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11744,  Location: I459 * US31 (Lat: 33.384200,  Lng: -86.806900),  Route carried "on" structure: Interstate 459,  Year Built: 1977,  Status: Open,  Structure Length: 8.72m (28.61ft),  Average Daily Traffic: 54,815 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 69,309 (year 2040),  Design Load: HS 20,  Features Intersected: AL - 3 (US 31)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.370,  Lanes on structure: 5,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 24.2m (79.4ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.70m (31.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $5,453,000,  Roadway Improvement Cost: $545,000,  Total Project Cost: $5,998,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11745,  Location: LORNA RD * I 459 (Lat: 33.389136,  Lng: -86.796339),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 11.06m (36.29ft),  Average Daily Traffic: 3,500 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,500 (year 2041),  Design Load: HS 20,  Features Intersected: I - 459,  Facility Carried by Structure: LORNA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.95m (39.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $6,719,000,  Roadway Improvement Cost: $672,000,  Total Project Cost: $7,391,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11746,  Location: I 65 * I 459 INTERCHANGE (Lat: 33.393358,  Lng: -86.785736),  Route carried "on" structure: Interstate 459,  Year Built: 1977,  Status: Open,  Structure Length: 21.58m (70.80ft),  Average Daily Traffic: 51,820 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 65,522 (year 2040),  Design Load: HS 20,  Features Intersected: RAMPS C*D
Minimum Vertical Clearance: 7.04m (23.10ft),  Kilometerpoint: 24.538,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.58m (70.80ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Bridge Improvement Cost: $7,990,000,  Roadway Improvement Cost: $799,000,  Total Project Cost: $8,789,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11747,  Location: I 65 * I 459 INTERCHANGE (Lat: 33.392939,  Lng: -86.786092),  Route carried "on" structure: Interstate 459,  Year Built: 1977,  Status: Open,  Structure Length: 24.87m (81.59ft),  Average Daily Traffic: 51,820 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 65,522 (year 2041),  Design Load: HS 20,  Features Intersected: RAMP D
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 24.473,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.87m (81.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $9,209,000,  Roadway Improvement Cost: $921,000,  Total Project Cost: $10,130,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11759,  Location: I 459/I 65 INTERCHANGE (Lat: 33.392100,  Lng: -86.784700),  Route carried "on" structure: Interstate 65,  Year Built: 1977,  Status: Open,  Structure Length: 30.98m (101.64ft),  Average Daily Traffic: 56,815 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 71,980 (year 2040),  Design Load: HS 20,  Features Intersected: I 459
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 402.256,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 40.1m (131.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 30.98m (101.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $12,107,000,  Roadway Improvement Cost: $1,211,000,  Total Project Cost: $13,318,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1176,  Location: I 459/I 65 INTERCHANGE (Lat: 33.392653,  Lng: -86.784511),  Route carried "on" structure: Interstate 65,  Year Built: 1977,  Status: Open,  Structure Length: 32.09m (105.28ft),  Average Daily Traffic: 56,815 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 71,980 (year 2040),  Design Load: HS 20,  Features Intersected: I - 459 & RAMPS
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 402.256,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 40.4m (132.5ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.09m (105.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $12,543,000,  Roadway Improvement Cost: $1,254,000,  Total Project Cost: $13,797,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11761,  Location: I 65 I 459 INTERCHANGE (Lat: 33.393025,  Lng: -86.784036),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 1977,  Status: Open,  Structure Length: 21.43m (70.31ft),  Average Daily Traffic: 11,363 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 14,396 (year 2040),  Design Load: HS 20,  Features Intersected: I 65 I459 AND RAMPS,  Facility Carried by Structure: RAMP 61 TO I459 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 401.710,  Lanes on structure: 2,  Lanes under structure: 14,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 42.4m (139.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 37.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 21.43m (70.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $6,171,000,  Roadway Improvement Cost: $617,000,  Total Project Cost: $6,788,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11762,  Location: I 65 I 459 INTERCHANGE (Lat: 33.393489,  Lng: -86.783531),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 1977,  Status: Open,  Structure Length: 21.85m (71.69ft),  Average Daily Traffic: 11,363 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 14,396 (year 2040),  Design Load: HS 20,  Features Intersected: I 65 HOOVER,  Facility Carried by Structure: RAMPS MP249.62
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 401.726,  Lanes on structure: 2,  Lanes under structure: 14,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 42.4m (139.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 21.85m (71.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $6,294,000,  Roadway Improvement Cost: $629,000,  Total Project Cost: $6,923,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11763,  Location: I 65 * ROCKY RIDGE ROAD (Lat: 33.401250,  Lng: -86.787978),  Route carried "on" structure: Interstate 65,  Year Built: 1977,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 59,055 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 74,818 (year 2040),  Design Load: HS 20,  Features Intersected: ROCKY RIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 403.442,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.49m (31.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $5,338,000,  Roadway Improvement Cost: $534,000,  Total Project Cost: $5,872,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11764,  Location: I 65 * ROCKY RIDGE RD (Lat: 33.401414,  Lng: -86.787706),  Route carried "on" structure: Interstate 65,  Year Built: 1977,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 59,055 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 74,818 (year 2040),  Design Load: HS 20,  Features Intersected: ROCKY RIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 403.442,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 24.8m (81.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.49m (31.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $5,273,000,  Roadway Improvement Cost: $527,000,  Total Project Cost: $5,800,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11765,  Location: I 65 * WISTERIA DR (Lat: 33.407036,  Lng: -86.795167),  Route carried "on" structure: Interstate 65,  Year Built: 1977,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 59,055 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 74,818 (year 2040),  Design Load: HS 20,  Features Intersected: WISTERIA DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 404.359,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.52m (31.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,702,000,  Roadway Improvement Cost: $470,000,  Total Project Cost: $5,172,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11766,  Location: I 65 * WISTERIA DR (Lat: 33.407172,  Lng: -86.794908),  Route carried "on" structure: Interstate 65,  Year Built: 1977,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 59,055 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 74,818 (year 2040),  Design Load: HS 20,  Features Intersected: WISTERIA DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 404.359,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 70.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.52m (31.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,702,000,  Roadway Improvement Cost: $470,000,  Total Project Cost: $5,172,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11923,  Location: I459 * LITTLE SHADES CK (Lat: 33.398292,  Lng: -86.777594),  Route carried "on" structure: Interstate 459,  Year Built: 1978,  Status: Open,  Structure Length: 10.52m (34.51ft),  Average Daily Traffic: 51,820 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 65,522 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE SHADES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.600,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 24.0m (78.7ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.42m (37.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $6,423,000,  Roadway Improvement Cost: $642,000,  Total Project Cost: $7,065,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11924,  Location: I459 * LITTLE SHADES CK (Lat: 33.398136,  Lng: -86.777289),  Route carried "on" structure: Interstate 459,  Year Built: 1978,  Status: Open,  Structure Length: 10.52m (34.51ft),  Average Daily Traffic: 51,820 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 65,522 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE SHADES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.600,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.42m (37.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $6,502,000,  Roadway Improvement Cost: $650,000,  Total Project Cost: $7,152,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11932,  Location: I 65 * LOWER ROCKY RIDGE (Lat: 33.386217,  Lng: -86.783800),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 10.55m (34.61ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,000 (year 2040),  Design Load: HS 20,  Features Intersected: I 65,  Facility Carried by Structure: OLD ROCKY RIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 7 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.5m (106.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.46m (37.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,693,000,  Roadway Improvement Cost: $369,000,  Total Project Cost: $4,062,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11933,  Location: I 65 * CAHABA RIVER (Lat: 33.371400,  Lng: -86.778200),  Route carried "on" structure: Interstate 65,  Year Built: 1978,  Status: Open,  Structure Length: 21.42m (70.28ft),  Average Daily Traffic: 56,815 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 71,980 (year 2040),  Design Load: HS 20,  Features Intersected: CAHABA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 399.780,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 31.0m (101.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.42m (70.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $8,666,000,  Roadway Improvement Cost: $867,000,  Total Project Cost: $9,533,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11934,  Location: I 65 * CAHABA RIVER (Lat: 33.369800,  Lng: -86.777500),  Route carried "on" structure: Interstate 65,  Year Built: 1978,  Status: Open,  Structure Length: 21.42m (70.28ft),  Average Daily Traffic: 56,815 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 71,980 (year 2040),  Design Load: HS 20,  Features Intersected: CAHABA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 399.780,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 31.0m (101.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.42m (70.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $8,666,000,  Roadway Improvement Cost: $867,000,  Total Project Cost: $9,533,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12295,  Location: I459* SULPHUR SPRINGS RD (Lat: 33.360600,  Lng: -86.847900),  Route carried "on" structure: Interstate 459,  Year Built: 1980,  Status: Open,  Structure Length: 5.41m (17.75ft),  Average Daily Traffic: 34,985 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 44,236 (year 2040),  Design Load: HS 20,  Features Intersected: PRESERVE PARKWAY
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 17.751,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.44m (21.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,606,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $2,867,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12296,  Location: I459 * PRESERVE PKWY (Lat: 33.359700,  Lng: -86.847000),  Route carried "on" structure: Interstate 459,  Year Built: 1980,  Status: Open,  Structure Length: 5.26m (17.26ft),  Average Daily Traffic: 34,985 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 44,236 (year 2040),  Design Load: HS 20,  Features Intersected: PRESERVE PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.751,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.29m (20.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,020,000,  Roadway Improvement Cost: $302,000,  Total Project Cost: $3,322,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12297,  Location: I 459 * PATTON CK (Lat: 33.379167,  Lng: -86.818056),  Route carried "on" structure: Interstate 459,  Year Built: 1980,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 18.78m (61.61ft),  Average Daily Traffic: 34,985 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 44,236 (year 2040),  Design Load: HS 20,  Features Intersected: PATTON CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.287,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.6m (67.6ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 20.6m (67.6ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.41m (63.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $9,317,000,  Roadway Improvement Cost: $932,000,  Total Project Cost: $10,249,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12298,  Location: I459 * PATTON CK (Lat: 33.379167,  Lng: -86.818056),  Route carried "on" structure: Interstate 459,  Year Built: 1980,  Status: Open,  Structure Length: 15.51m (50.89ft),  Average Daily Traffic: 34,985 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 44,236 (year 2040),  Design Load: HS 20,  Features Intersected: PATTON CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.287,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.28m (53.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $6,585,000,  Roadway Improvement Cost: $659,000,  Total Project Cost: $7,244,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12299,  Location: I 459 * ROCKY RIDGE ROAD (Lat: 33.406508,  Lng: -86.764753),  Route carried "on" structure: Interstate 459,  Year Built: 1980,  Status: Open,  Structure Length: 9.29m (30.48ft),  Average Daily Traffic: 51,820 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 65,522 (year 2040),  Design Load: HS 20,  Features Intersected: LOWER ROCKY RIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.129,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.25m (33.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,218,000,  Roadway Improvement Cost: $422,000,  Total Project Cost: $4,640,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12301,  Location: 0.2 MI. S. ACTON RD (Lat: 33.410192,  Lng: -86.760556),  Route carried "on" structure: Interstate 459,  Year Built: 1980,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 103,640 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 131,045 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.613,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 42.7m (140.1ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $5,629,000,  Roadway Improvement Cost: $563,000,  Total Project Cost: $6,192,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12326,  Location: I 65 * VALLEYDALE RD (Lat: 33.353333,  Lng: -86.779444),  Route carried "on" structure: Interstate 65,  Year Built: 1980,  Status: Open,  Structure Length: 12.16m (39.90ft),  Average Daily Traffic: 47,910 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 60,698 (year 2041),  Design Load: HS 20,  Features Intersected: CO RD 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 397.830,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.4m (109.6ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.01m (42.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,979,000,  Roadway Improvement Cost: $598,000,  Total Project Cost: $6,577,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12327,  Location: I 65 * VALLEYDALE RD (Lat: 33.353500,  Lng: -86.779700),  Route carried "on" structure: Interstate 65,  Year Built: 1980,  Status: Open,  Structure Length: 12.27m (40.26ft),  Average Daily Traffic: 47,910 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 60,698 (year 2040),  Design Load: HS 20,  Features Intersected: CO RD 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 397.830,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.7m (110.6ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.11m (43.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $5,395,000,  Roadway Improvement Cost: $540,000,  Total Project Cost: $5,935,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12347,  Location: 300' W MORGAN RD (GENERY) (Lat: 33.308233,  Lng: -86.904833),  Route carried "on" structure: County highway 2,  Year Built: 1980,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 2,828 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,925 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RR,  Facility Carried by Structure: SO SHADES CREST RD
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.5m (116.5ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.61m (15.12ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: December 2020,  Bridge Improvement Cost: $949,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,044,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12714,  Location: SHADES CREST RD (Lat: 33.345294,  Lng: -86.870914),  Route carried "on" structure: Alternate County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 16.16m (53.02ft),  Average Daily Traffic: 14,069 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 25,411 (year 2041),  Design Load: HS 20,  Features Intersected: I 459,  Facility Carried by Structure: SHADES CREST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.91m (55.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $5,334,000,  Roadway Improvement Cost: $533,000,  Total Project Cost: $5,867,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12912,  Location: I459* SOU RR (Lat: 33.343761,  Lng: -86.877697),  Route carried "on" structure: Interstate 459,  Year Built: 1983,  Status: Open,  Structure Length: 13.75m (45.11ft),  Average Daily Traffic: 27,200 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 34,392 (year 2041),  Design Load: HS 20,  Features Intersected: SCL RR SOU RR *ACCESS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.305,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.55m (47.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $5,786,000,  Roadway Improvement Cost: $579,000,  Total Project Cost: $6,365,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Hoover, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.