Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hoover, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 97Number of bridges
  • 2,034ft / 620mTotal length
  • $298,088,000Total costs
  • 3,091,276Total average daily traffic
  • 361,645Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hoover
  • No street view available for this location

New bridges in Hoover, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 81960-1969
  • 491970-1979
  • 201980-1989
  • 41990-1999
  • 112000-2009
  • 22010-2019
  • 22020-2022
Reconstructed bridges in Hoover, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 21990-1999
Average Bridge Daily Traffic in Hoover, AL
Average Bridge Truck Traffic in Hoover, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.6%Excellent
  • 5.5%Very good
  • 16.4%Good
  • 70.9%Satisfactory
  • 3.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 3.6%Excellent
  • 10.9%Very good
  • 14.5%Good
  • 63.6%Satisfactory
  • 7.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.8%Excellent
  • 7.3%Very good
  • 29.1%Good
  • 60.0%Satisfactory
  • 1.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.2%Very good
  • 17.2%Good
  • 51.7%Satisfactory
  • 10.3%Fair
  • 3.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 37.5%Satisfactory
  • 37.5%Fair
Find on map >>   Show street view

Structure Number: 12913,  Location: SOU RR * I459 (Lat: 33.343533,  Lng: -86.877644),  Route carried "on" structure: Interstate 459,  Year Built: 1983,  Status: Open,  Structure Length: 13.75m (45.11ft),  Average Daily Traffic: 27,200 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 34,392 (year 2041),  Design Load: HS 20,  Features Intersected: SCL RR * ACCESS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.305,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.55m (47.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $5,688,000,  Roadway Improvement Cost: $569,000,  Total Project Cost: $6,257,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14022,  Location: SHELBY/JEFFCO.LINE (Lat: 33.363169,  Lng: -86.813119),  Route carried "on" structure: County highway 275,  Year Built: 1986,  Status: Open,  Structure Length: 14.08m (46.19ft),  Average Daily Traffic: 16,877 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 23,630 (year 2041),  Design Load: HS 20,  Features Intersected: CAHABA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 56.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.88m (48.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,876,000,  Roadway Improvement Cost: $388,000,  Total Project Cost: $4,264,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14421,  Location: I 65 * BLUE RIDGE BLVD (Lat: 33.427603,  Lng: -86.820875),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 58,955 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 74,691 (year 2040),  Design Load: HS 20,  Features Intersected: BLUE RIDGE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 407.768,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.95m (19.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,020,000,  Roadway Improvement Cost: $302,000,  Total Project Cost: $3,322,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14422,  Location: I 65 * BLUE RIDGE BLVD (Lat: 33.427881,  Lng: -86.820242),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 58,955 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 74,691 (year 2040),  Design Load: HS 20,  Features Intersected: BLUE RIDGE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 407.768,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.74m (22.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,048,000,  Roadway Improvement Cost: $305,000,  Total Project Cost: $3,353,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14423,  Location: I 65 * FORREST BROOK DR (Lat: 33.438908,  Lng: -86.823414),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 60,340 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 76,446 (year 2040),  Design Load: HS 20,  Features Intersected: FORREST BROOK DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 409.135,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.31m (27.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,534,000,  Roadway Improvement Cost: $353,000,  Total Project Cost: $3,887,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14424,  Location: I 65 * FORREST BROOK DR (Lat: 33.438992,  Lng: -86.823100),  Route carried "on" structure: Interstate 65,  Year Built: 1972,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 60,340 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 76,446 (year 2040),  Design Load: HS 20,  Features Intersected: FORREST BROOK DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 409.135,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.35m (24.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,124,000,  Roadway Improvement Cost: $312,000,  Total Project Cost: $3,436,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17312,  Location: AL 150 OVER PATTON CREEK (Lat: 33.366700,  Lng: -86.821900),  Route carried "on" structure: State highway 150,  Year Built: 1998,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 29,710 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 36,252 (year 2040),  Design Load: HS 20,  Features Intersected: PATTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.054,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.0m (65.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 79.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.14m (23.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,425,000,  Roadway Improvement Cost: $343,000,  Total Project Cost: $3,768,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17655,  Location: .8 KM W JCT CO RD 275 (Lat: 33.358056,  Lng: -86.809167),  Route carried "on" structure: City street 275,  Year Built: 1975,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 2,500 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,500 (year 2040),  Features Intersected: BRANCH,  Facility Carried by Structure: RIVERCHASE PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $485,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $534,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17656,  Location: .5 KM NW JCT CO RD 17 (Lat: 33.376944,  Lng: -86.775278),  Route carried "on" structure: City street 17,  Year Built: 1986,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 700 (year 2040),  Design Load: H 15,  Features Intersected: SOUTHLAKE,  Facility Carried by Structure: SOUTHLAKE PARKWAY
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.76m (12.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,301,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,431,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17739,  Location: LAKE CYRUS PKWY/ AL150 (Lat: 33.357722,  Lng: -86.879333),  Route carried "on" structure: Alternate City street ,  Year Built: 1999,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 800 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 600 (year 2040),  Design Load: HS 20,  Features Intersected: SHADES CREEK,  Facility Carried by Structure: LAKE CYRUS PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.25m (17.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,367,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,504,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17783,  Location: .1 MI. SO. US 31 (Lat: 33.380147,  Lng: -86.813939),  Route carried "on" structure: Interstate 459,  Year Built: 2002,  Status: Open,  Structure Length: 28.03m (91.96ft),  Average Daily Traffic: 69,970 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 88,472 (year 2040),  Design Load: HS 20,  Features Intersected: I-459 AND RAMP B,  Facility Carried by Structure: FLYOVER RAMP A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.646,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 11.2m (36.7ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 84.8m (278.2ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 28.03m (91.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $7,496,000,  Roadway Improvement Cost: $750,000,  Total Project Cost: $8,246,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17784,  Location: .1 MI. SO. US 31 (Lat: 33.380447,  Lng: -86.813358),  Route carried "on" structure: Ramp Interstate 459,  Year Built: 2002,  Status: Open,  Structure Length: 21.33m (69.98ft),  Average Daily Traffic: 6,997 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 8,847 (year 2040),  Design Load: HS 20,  Features Intersected: RAMP C,  Facility Carried by Structure: FLYOVER RAMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.726,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 91.3m (299.5ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 21.33m (69.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $5,850,000,  Roadway Improvement Cost: $585,000,  Total Project Cost: $6,435,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17887,  Location: CULVERT @ FLYOVER (Lat: 33.380583,  Lng: -86.815283),  Route carried "on" structure: Ramp Interstate 459,  Year Built: 2001,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 6,997 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 8,847 (year 2041),  Design Load: HS 20,  Features Intersected: PATTON CK,  Facility Carried by Structure: FLYOVER B
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 21.581,  Lanes on structure: 4,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 4.5m (14.8ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 304.5m (999.0ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $13,923,000,  Roadway Improvement Cost: $1,392,000,  Total Project Cost: $15,315,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19453,  Location: .1 MI. FROM AL 119 (Lat: 33.411300,  Lng: -86.675100),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 6,500 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,100 (year 2040),  Design Load: H 15,  Features Intersected: CAHABA VALLEY CREEK,  Facility Carried by Structure: DOUG BAKER BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $822,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $904,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1979,  Location: 1 MILE FROM CR 17 (Lat: 33.383069,  Lng: -86.756814),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,800 (year 2040),  Design Load: HS 20,  Features Intersected: INDIAN VALLEY LAKE,  Facility Carried by Structure: INDIAN VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $839,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $923,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 198,  Location: ROSS BRIDGE (Lat: 33.374572,  Lng: -86.860033),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 2.54m (8.33ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,680 (year 2040),  Design Load: HS 20,  Features Intersected: UT TO SHADES CREEK,  Facility Carried by Structure: ORCHARD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.4m (83.3ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.43m (11.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,081,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,189,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19892,  Location: ROSS BRIDGE (Lat: 33.373972,  Lng: -86.861722),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 13.87m (45.51ft),  Average Daily Traffic: 4,700 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,580 (year 2040),  Design Load: HS 20,  Features Intersected: SHADES CREEK,  Facility Carried by Structure: ROSS BRIDGE PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.6m (110.2ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 70.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.67m (48.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $5,131,000,  Roadway Improvement Cost: $513,000,  Total Project Cost: $5,644,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20158,  Location: ROSS BRIDGE (Lat: 33.394389,  Lng: -86.872889),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 4.26m (13.98ft),  Average Daily Traffic: 4,700 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,580 (year 2040),  Design Load: HS 20,  Features Intersected: CSX RR,  Facility Carried by Structure: ROSS BRIDGE PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 28.4m (93.2ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 57.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.23m (17.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,828,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $2,011,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20486,  Location: 1.25 MI W. of US 31 (Lat: 33.388967,  Lng: -86.827267),  Route carried "on" structure: County highway 512,  Year Built: 2020,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,680 (year 2040),  Design Load: HS 20,  Features Intersected: Patton Creek,  Facility Carried by Structure: Patton Chapel Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.1m (36.4ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,411,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $1,552,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20814,  Location: 0.4 MILES FROM GALLERIA (Lat: 33.366844,  Lng: -86.821608),  Route carried "on" structure: City street ,  Year Built: 2013,  Status: Open,  Structure Length: 36.27m (119.00ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: HS 20,  Features Intersected: PATTON CREEK,  Facility Carried by Structure: CHAPEL LANE
Minimum Vertical Clearance: 8.15m (26.74ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 13,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 36.27m (119.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $13,182,000,  Roadway Improvement Cost: $1,318,000,  Total Project Cost: $14,500,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20989,  Location: 0.3 MILE FROM AL 119 (Lat: 33.425292,  Lng: -86.663667),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,800 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,520 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: GREYSTONE WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.57m (5.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $508,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $559,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21075,  Location: _creekside subdivision (Lat: 33.334867,  Lng: -86.868417),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 560 (year 2040),  Design Load: HS 20,  Features Intersected: _Black Creek,  Facility Carried by Structure: _Creekside drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 86.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.89m (12.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,014,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,115,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 214,  Location: _Stadium Trace / CSX RR (Lat: 33.325972,  Lng: -86.868750),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,300 (year 2040),  Design Load: HS 20,  Features Intersected: CSX RR,  Facility Carried by Structure: STADIUM TRACE PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.44m (14.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,157,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,273,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2164,  Location: Elvira road over CSX (Lat: 33.306189,  Lng: -86.879694),  Route carried "on" structure: City street ,  Year Built: 2021,  Status: Open,  Structure Length: 4.89m (16.04ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 420 (year 2041),  Design Load: HS 20,  Features Intersected: CSX Railroad,  Facility Carried by Structure: Blackridge Dr.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.9m (160.4ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.91m (19.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,539,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $1,693,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 11743,  Location: I 459 * US 31 (Lat: 33.384800,  Lng: -86.806300),  Route carried "under" structure: US 31,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 35,670 (year 2020),  Truck Traffic: 5%,  Features Intersected: AL - 3 (US 31),  Facility Carried by Structure: I - 459 SOUTH
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 426.478,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 11744,  Location: I459 * US31 (Lat: 33.384200,  Lng: -86.806900),  Route carried "under" structure: US 31,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 35,670 (year 2020),  Truck Traffic: 5%,  Features Intersected: AL - 3 (US 31),  Facility Carried by Structure: I - 459 NORTH
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 426.476,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 11745,  Location: LORNA RD * I 459 (Lat: 33.389136,  Lng: -86.796339),  Route carried "under" structure: Interstate 459,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 109,630 (year 2021),  Truck Traffic: 11%,  Features Intersected: I - 459,  Facility Carried by Structure: LORNA RD
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 23.508,  Lanes on structure: 5,  Lanes under structure: 10,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 11746,  Location: I 65 * I 459 INTERCHANGE (Lat: 33.393358,  Lng: -86.785736),  Route carried "under" structure: Ramp Interstate 459,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 10,364 (year 2020),  Truck Traffic: 10%,  Features Intersected: RAMPS C*D
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 24.538,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>   Show street view

Structure Number: 11747,  Location: I 65 * I 459 INTERCHANGE (Lat: 33.392939,  Lng: -86.786092),  Route carried "under" structure: Ramp Interstate 459,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 10,364 (year 2021),  Truck Traffic: 10%,  Features Intersected: RAMP D
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 24.473,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>   Show street view

Structure Number: 11747,  Location: I 65 * I 459 INTERCHANGE (Lat: 33.392939,  Lng: -86.786092),  Route carried "under" structure: Interstate 459,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 103,640 (year 2021),  Truck Traffic: 10%,  Features Intersected: RAMP D
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 24.731,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>   Show street view

Structure Number: 11759,  Location: I 459/I 65 INTERCHANGE (Lat: 33.392100,  Lng: -86.784700),  Route carried "under" structure: Interstate 459,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 103,640 (year 2020),  Truck Traffic: 10%,  Features Intersected: I 459,  Facility Carried by Structure: I - 65 SOUTH
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 25.328,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.1m (131.6ft)

Find on map >>   Show street view

Structure Number: 11759,  Location: I 459/I 65 INTERCHANGE (Lat: 33.392100,  Lng: -86.784700),  Route carried "under" structure: Ramp Interstate 459,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 10,364 (year 2020),  Truck Traffic: 10%,  Features Intersected: I 459,  Facility Carried by Structure: I - 65 SOUTH
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 25.328,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.1m (131.6ft)

Find on map >>   Show street view

Structure Number: 1176,  Location: I 459/I 65 INTERCHANGE (Lat: 33.392653,  Lng: -86.784511),  Route carried "under" structure: Interstate 459,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 103,640 (year 2020),  Truck Traffic: 10%,  Features Intersected: I - 459 & RAMPS,  Facility Carried by Structure: I - 65 NORTH
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 25.328,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.4m (132.5ft)

Find on map >>   Show street view

Structure Number: 1176,  Location: I 459/I 65 INTERCHANGE (Lat: 33.392653,  Lng: -86.784511),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 11,363 (year 2020),  Truck Traffic: 13%,  Features Intersected: I - 459 & RAMPS
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 401.710,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.4m (132.5ft)

Find on map >>   Show street view

Structure Number: 1176,  Location: I 459/I 65 INTERCHANGE (Lat: 33.392653,  Lng: -86.784511),  Route carried "under" structure: Ramp Interstate 65,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 11,363 (year 2020),  Truck Traffic: 13%,  Features Intersected: I - 459 & RAMPS
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 402.352,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.4m (132.5ft)

Find on map >>   Show street view

Structure Number: 11761,  Location: I 65 I 459 INTERCHANGE (Lat: 33.393025,  Lng: -86.784036),  Route carried "under" structure: Interstate 65,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 113,630 (year 2020),  Truck Traffic: 13%,  Features Intersected: I 65 I459 AND RAMPS,  Facility Carried by Structure: RAMP 61 TO I459 SB
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 401.710,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 11761,  Location: I 65 I 459 INTERCHANGE (Lat: 33.393025,  Lng: -86.784036),  Route carried "under" structure: Ramp Interstate 459,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 10,364 (year 2020),  Truck Traffic: 10%,  Features Intersected: I 65 I459 AND RAMPS
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 25.328,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 11761,  Location: I 65 I 459 INTERCHANGE (Lat: 33.393025,  Lng: -86.784036),  Route carried "under" structure: Interstate 459,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 103,640 (year 2020),  Truck Traffic: 10%,  Features Intersected: I 65 I459 AND RAMPS
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 25.328,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 11762,  Location: I 65 I 459 INTERCHANGE (Lat: 33.393489,  Lng: -86.783531),  Route carried "under" structure: Interstate 65,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 113,630 (year 2020),  Truck Traffic: 13%,  Features Intersected: I 65 HOOVER,  Facility Carried by Structure: RAMPS MP249.62
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 401.710,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 11762,  Location: I 65 I 459 INTERCHANGE (Lat: 33.393489,  Lng: -86.783531),  Route carried "under" structure: Interstate 459,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 103,640 (year 2020),  Truck Traffic: 10%,  Features Intersected: I 65 HOOVER,  Facility Carried by Structure: RAMPS MP249.62
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 25.328,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 11762,  Location: I 65 I 459 INTERCHANGE (Lat: 33.393489,  Lng: -86.783531),  Route carried "under" structure: Ramp Interstate 459,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 10,364 (year 2020),  Truck Traffic: 10%,  Features Intersected: I 65 HOOVER,  Facility Carried by Structure: RAMPS MP249.62
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 25.328,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: 11763,  Location: I 65 * ROCKY RIDGE ROAD (Lat: 33.401250,  Lng: -86.787978),  Route carried "under" structure: City street ,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2002),  Truck Traffic: 1%,  Features Intersected: ROCKY RIDGE ROAD,  Facility Carried by Structure: I - 65 SOUTH
Minimum Vertical Clearance: 5.70m (18.70ft),  Kilometerpoint: 0.161,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 11764,  Location: I 65 * ROCKY RIDGE RD (Lat: 33.401414,  Lng: -86.787706),  Route carried "under" structure: City street ,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2002),  Truck Traffic: 1%,  Features Intersected: ROCKY RIDGE RD,  Facility Carried by Structure: I - 65 NORTH
Minimum Vertical Clearance: 5.70m (18.70ft),  Kilometerpoint: 0.161,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 11765,  Location: I 65 * WISTERIA DR (Lat: 33.407036,  Lng: -86.795167),  Route carried "under" structure: City street ,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 9%,  Features Intersected: WISTERIA DR,  Facility Carried by Structure: I 65
Minimum Vertical Clearance: 12.19m (39.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 11766,  Location: I 65 * WISTERIA DR (Lat: 33.407172,  Lng: -86.794908),  Route carried "under" structure: Alternate City street ,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Features Intersected: WISTERIA DR,  Facility Carried by Structure: I 65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 11932,  Location: I 65 * LOWER ROCKY RIDGE (Lat: 33.386217,  Lng: -86.783800),  Route carried "under" structure: Interstate 65,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 113,630 (year 2020),  Truck Traffic: 13%,  Features Intersected: I 65,  Facility Carried by Structure: OLD ROCKY RIDGE RD
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 401.853,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.5m (106.6ft)

Find on map >>   Show street view

Structure Number: 12295,  Location: I459* SULPHUR SPRINGS RD (Lat: 33.360600,  Lng: -86.847900),  Route carried "under" structure: City street ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 10%,  Features Intersected: PRESERVE PARKWAY,  Facility Carried by Structure: I - 459 SOUTH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.161,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 12296,  Location: I459 * PRESERVE PKWY (Lat: 33.359700,  Lng: -86.847000),  Route carried "under" structure: City street ,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 10%,  Features Intersected: PRESERVE PARKWAY,  Facility Carried by Structure: I - 459 NORTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 12326,  Location: I 65 * VALLEYDALE RD (Lat: 33.353333,  Lng: -86.779444),  Route carried "under" structure: County highway 17,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2021),  Truck Traffic: 14%,  Features Intersected: CO RD 17,  Facility Carried by Structure: I 65 SOUTH
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.4m (109.6ft)

Find on map >>   Show street view

Structure Number: 12327,  Location: I 65 * VALLEYDALE RD (Lat: 33.353500,  Lng: -86.779700),  Route carried "under" structure: County highway 17,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2018),  Truck Traffic: 14%,  Features Intersected: CO RD 17,  Facility Carried by Structure: I - 65 NORTH
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.7m (110.6ft)

Find on map >>   Show street view

Structure Number: 12714,  Location: SHADES CREST RD (Lat: 33.345294,  Lng: -86.870914),  Route carried "under" structure: Interstate 459,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 54,400 (year 2019),  Truck Traffic: 20%,  Features Intersected: I 459,  Facility Carried by Structure: SHADES CREST RD
Minimum Vertical Clearance: 14.99m (49.18ft),  Kilometerpoint: 14.981,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 12715,  Location: I459 * AL 150 (Lat: 33.356736,  Lng: -86.852083),  Route carried "under" structure: State highway 150,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 29,900 (year 2020),  Truck Traffic: 7%,  Features Intersected: AL 150,  Facility Carried by Structure: I 459
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 13.935,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 14421,  Location: I 65 * BLUE RIDGE BLVD (Lat: 33.427603,  Lng: -86.820875),  Route carried "under" structure: ServiceCity street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 8%,  Features Intersected: BLUE RIDGE BLVD,  Facility Carried by Structure: I - 65 SOUTH
Minimum Vertical Clearance: 5.85m (19.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 14422,  Location: I 65 * BLUE RIDGE BLVD (Lat: 33.427881,  Lng: -86.820242),  Route carried "under" structure: ServiceCity street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 8%,  Features Intersected: BLUE RIDGE BLVD,  Facility Carried by Structure: I - 65 NORTH
Minimum Vertical Clearance: 7.50m (24.61ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 14424,  Location: I 65 * FORREST BROOK DR (Lat: 33.438992,  Lng: -86.823100),  Route carried "under" structure: ServiceCity street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 8%,  Features Intersected: FORREST BROOK DRIVE,  Facility Carried by Structure: I 65
Minimum Vertical Clearance: 5.52m (18.11ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 17783,  Location: .1 MI. SO. US 31 (Lat: 33.380147,  Lng: -86.813939),  Route carried "under" structure: Interstate 459,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 69,970 (year 2020),  Truck Traffic: 17%,  Features Intersected: I-459 AND RAMP B,  Facility Carried by Structure: FLYOVER RAMP A
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 21.613,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: Toll bridge,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 84.8m (278.2ft)

Find on map >>   Show street view

Structure Number: 17783,  Location: .1 MI. SO. US 31 (Lat: 33.380147,  Lng: -86.813939),  Route carried "under" structure: Ramp Interstate 459,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 6,997 (year 2020),  Truck Traffic: 17%,  Features Intersected: I-459 AND RAMP B,  Facility Carried by Structure: FLYOVER RAMP A
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 21.630,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: Toll bridge is a segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 84.8m (278.2ft)

Find on map >>   Show street view

Structure Number: 17784,  Location: .1 MI. SO. US 31 (Lat: 33.380447,  Lng: -86.813358),  Route carried "under" structure: Interstate 459,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 69,970 (year 2020),  Truck Traffic: 17%,  Features Intersected: RAMP C,  Facility Carried by Structure: FLYOVER RAMP B
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 21.758,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: Toll bridge is a segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 91.3m (299.5ft)

Discuss Hoover, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.