Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lincoln, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 43Number of bridges
  • 659ft / 201mTotal length
  • $78,990,000Total costs
  • 456,350Total average daily traffic
  • 128,335Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lincoln
  • No street view available for this location

New bridges in Lincoln, AL - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 41940-1949
  • 51950-1959
  • 191960-1969
  • 31970-1979
  • 31980-1989
  • 42000-2009
  • 32010-2019
Reconstructed bridges in Lincoln, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Lincoln, AL
Average Bridge Truck Traffic in Lincoln, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.0%Excellent
  • 10.0%Very good
  • 30.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
  • 5.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.0%Excellent
  • 20.0%Very good
  • 50.0%Good
  • 15.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.0%Excellent
  • 15.0%Very good
  • 50.0%Good
  • 15.0%Satisfactory
  • 15.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.9%Excellent
  • 17.6%Very good
  • 47.1%Good
  • 26.5%Satisfactory
  • 5.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 68.4%Good
  • 31.6%Satisfactory
Find on map >>   Show street view

Structure Number: 204,  Location: 5.9 MI NO JCT SR 34 (Lat: 33.562550,  Lng: -86.126567),  Route carried "on" structure: State highway 77,  Year Built: 1939,  Status: Open,  Structure Length: 18.07m (59.28ft),  Average Daily Traffic: 6,753 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 9,454 (year 2040),  Design Load: H 15,  Features Intersected: CHOCCOLOCCO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 118.892,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 16,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.74m (61.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $3,085,000,  Roadway Improvement Cost: $309,000,  Total Project Cost: $3,394,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2378,  Location: MITCHELLVILLE RD. (Lat: 33.690903,  Lng: -86.080233),  Route carried "on" structure: County highway 50,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 638 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,354 (year 2041),  Features Intersected: CREEK,  Facility Carried by Structure: 1 MI W AL 77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 7.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 5.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $268,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $295,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2871,  Location: 0.4 MI N JONESVIEW ON 280 (Lat: 33.447769,  Lng: -86.217481),  Route carried "on" structure: County highway 280,  Year Built: 1969,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 595 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 870 (year 2038),  Design Load: HS 20,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $235,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $259,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2879,  Location: 0.1 MI NW CO 97 ON CO 433 (Lat: 33.625000,  Lng: -86.048333),  Route carried "on" structure: County highway 433,  Year Built: 1958,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 650 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 890 (year 2038),  Design Load: H 20,  Features Intersected: BLUE EYE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.53m (5.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $407,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $448,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 288,  Location: 0.1 MI S CO 433 PATTON CH (Lat: 33.635000,  Lng: -86.068333),  Route carried "on" structure: County highway 456,  Year Built: 1945,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 694 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 940 (year 2038),  Design Load: H 20,  Features Intersected: BLUE EYE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $374,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $411,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3218,  Location: 0.25 MI S WASH CO LINE (Lat: 31.140947,  Lng: -88.256272),  Route carried "on" structure: US 45,  Year Built: 1948,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 5,297 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 7,946 (year 2038),  Design Load: H 20,  Features Intersected: BENNETTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.765,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.38m (14.37ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $930,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,023,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3933,  Location: 0.3 MI E CO 456 PATTONS C (Lat: 33.636667,  Lng: -86.063333),  Route carried "on" structure: County highway 433,  Year Built: 1950,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 745 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 888 (year 2038),  Design Load: H 20,  Features Intersected: BLUE EYE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.51m (8.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $464,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $510,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4555,  Location: .8 MI.W.OF 78/LINCOLN (Lat: 33.615725,  Lng: -86.119100),  Route carried "on" structure: County highway 433,  Year Built: 1953,  Status: Posted for load,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 1,490 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,530 (year 2038),  Design Load: H 15,  Features Intersected: BLUE EYE CREEK,  Facility Carried by Structure: CO 007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.800,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 35.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,145,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,260,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5241,  Location: 0.6 MI N CO 385 AT MCELDE (Lat: 33.525978,  Lng: -86.125811),  Route carried "on" structure: County highway 47,  Year Built: 1955,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 925 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,275 (year 2036),  Design Load: HS 20,  Features Intersected: CHEAHA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $248,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5598,  Location: 1.2 MI N TALLADEGA CO LIN (Lat: 33.690642,  Lng: -86.070297),  Route carried "on" structure: State highway 77,  Year Built: 1956,  Status: Open,  Structure Length: 1.53m (5.02ft),  Average Daily Traffic: 7,170 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 10,038 (year 2039),  Design Load: HS 20,  Features Intersected: ACKER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 134.535,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 82.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.21m (7.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $777,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $855,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6938,  Location: 0.5 MI S CALHOUN COUNTY (Lat: 33.665000,  Lng: -86.105000),  Route carried "on" structure: County highway 7,  Year Built: 1960,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,290 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,790 (year 2038),  Design Load: HS 20,  Features Intersected: LAKE THAT LEADS TO BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $248,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7852,  Location: 2.2 MI W JCT SR 77 (Lat: 33.591267,  Lng: -86.161931),  Route carried "on" structure: County highway 207,  Year Built: 1963,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 12,363 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,308 (year 2039),  Design Load: HS 20,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 58.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,869,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $2,056,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 809,  Location: 9.0 MI W AL 21 (Lat: 33.551242,  Lng: -86.005206),  Route carried "on" structure: County highway 399,  Year Built: 1963,  Status: Open,  Structure Length: 12.34m (40.49ft),  Average Daily Traffic: 610 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,150 (year 2038),  Design Load: H 20,  Features Intersected: CHOCCOLOCCO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 73.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.18m (43.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,622,000,  Roadway Improvement Cost: $262,000,  Total Project Cost: $2,884,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8145,  Location: 1.8 MI E JCT SR 77 (Lat: 33.587742,  Lng: -86.091931),  Route carried "on" structure: County highway 79,  Year Built: 1964,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 915 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 952 (year 2039),  Design Load: HS 20,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 169.979,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 8.55m (28.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,524,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,676,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8457,  Location: 5.1 MI S I20 (Lat: 33.530053,  Lng: -86.187078),  Route carried "on" structure: County highway 207,  Year Built: 1964,  Status: Posted for load,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 1,275 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,100 (year 2038),  Design Load: H 15,  Features Intersected: POORHOUSE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.098,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Underwater Inspection Date: May 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $1,306,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,437,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8492,  Location: 0.3 MI W CO 5 (Lat: 33.579167,  Lng: -86.034722),  Route carried "on" structure: County highway 399,  Year Built: 1967,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 2,305 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 3,245 (year 2038),  Design Load: H 20,  Features Intersected: EASTABOGA CREEK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,445,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $1,590,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 854,  Location: 2.5 MI E JCT SR 77 (Lat: 33.585822,  Lng: -86.080842),  Route carried "on" structure: Interstate 20,  Year Built: 1965,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 43,201 (year 2019),  Truck Traffic: 38%,  Average Future Daily Traffic: 60,481 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 274.591,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,502,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,652,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8541,  Location: 3.3 MI E JCT SR 77 (Lat: 33.584831,  Lng: -86.067278),  Route carried "on" structure: Interstate 20,  Year Built: 1965,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 43,201 (year 2019),  Truck Traffic: 38%,  Average Future Daily Traffic: 60,481 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 275.908,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 65.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,320,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,452,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8542,  Location: 5.0 MI E JCT SR 77 (Lat: 33.584556,  Lng: -86.039361),  Route carried "on" structure: County highway 97,  Year Built: 1965,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 609 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 853 (year 2038),  Design Load: HS 20,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 173.090,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,620,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $1,782,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8544,  Location: 5.5 MI E JCT SR 77 (Lat: 33.582833,  Lng: -86.029583),  Route carried "on" structure: Interstate 20,  Year Built: 1965,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 43,201 (year 2019),  Truck Traffic: 38%,  Average Future Daily Traffic: 60,481 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 279.429,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.2m (122.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,457,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $1,603,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8925,  Location: 8.0 MI N TALLADEGA (Lat: 33.548225,  Lng: -86.096783),  Route carried "on" structure: County highway 326,  Year Built: 1965,  Status: Posted for load,  Structure Length: 15.18m (49.80ft),  Average Daily Traffic: 915 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,290 (year 2038),  Design Load: H 15,  Features Intersected: CHOCCOLOCCO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 7,  Length of Maximum Span: 79.5m (260.8ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 15.95m (52.33ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Underwater Inspection Date: May 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $3,062,000,  Roadway Improvement Cost: $306,000,  Total Project Cost: $3,368,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9467,  Location: 0.6 MI W CO 005 (Lat: 33.578333,  Lng: -86.031667),  Route carried "on" structure: County highway 399,  Year Built: 1967,  Status: Open,  Structure Length: 2.21m (7.25ft),  Average Daily Traffic: 2,305 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 3,245 (year 2038),  Design Load: H 20,  Features Intersected: EASTABOGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,949,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $2,144,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10838,  Location: 6.7 MI NO JCT SR 34 (Lat: 33.570500,  Lng: -86.127000),  Route carried "on" structure: State highway 77,  Year Built: 1939,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 1.36m (4.46ft),  Average Daily Traffic: 14,878 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 20,829 (year 2039),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 119.980,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.4m (14.4ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.03m (6.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,484,000,  Roadway Improvement Cost: $248,000,  Total Project Cost: $2,732,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11472,  Location: 5.9 MI NORTH JCT SR 34 (Lat: 33.560475,  Lng: -86.126819),  Route carried "on" structure: State highway 77,  Year Built: 1975,  Status: Open,  Structure Length: 19.78m (64.90ft),  Average Daily Traffic: 6,753 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 9,454 (year 2040),  Design Load: HS 20,  Features Intersected: CHOCCOLOCCO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 118.892,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 6,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.33m (66.70ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $5,575,000,  Roadway Improvement Cost: $558,000,  Total Project Cost: $6,133,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11549,  Location: JCT I-20 AND SR-77 (Lat: 33.589906,  Lng: -86.124389),  Route carried "on" structure: State highway 77,  Year Built: 1964,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 13,842 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,377 (year 2038),  Design Load: HS 20,  Features Intersected: I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 122.119,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,675,000,  Roadway Improvement Cost: $368,000,  Total Project Cost: $4,043,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13457,  Location: COUNTY LINE RD. (Lat: 33.677906,  Lng: -86.080381),  Route carried "on" structure: County highway 100,  Year Built: 1940,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 1993),  Average Future Daily Traffic: 150 (year 2040),  Features Intersected: BRANCH,  Facility Carried by Structure: COUNTY LINE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $274,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $301,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13643,  Location: 0.1 MI E JCT CO 61 (Lat: 33.516556,  Lng: -86.165667),  Route carried "on" structure: State highway 34,  Year Built: 1985,  Status: Open,  Structure Length: 2.85m (9.35ft),  Average Daily Traffic: 2,934 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,108 (year 2039),  Design Load: HS 20,  Features Intersected: POOR HOUSE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.486,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.77m (12.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,872,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $2,059,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13644,  Location: JCT CO 61 (Lat: 33.516861,  Lng: -86.167639),  Route carried "on" structure: State highway 34,  Year Built: 1984,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,934 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,108 (year 2039),  Design Load: HS 20,  Features Intersected: POOR HOUSE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.358,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $430,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14189,  Location: 0.2 MILES NORTH I20 (Lat: 33.578333,  Lng: -86.030000),  Route carried "on" structure: County highway 5,  Year Built: 1987,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 3,575 (year 2018),  Truck Traffic: 32%,  Average Future Daily Traffic: 4,330 (year 2038),  Design Load: HS 20,  Features Intersected: EASTABOGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.76m (9.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $717,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $789,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15261,  Location: .01 MI. N. HWY 34 (Lat: 33.518333,  Lng: -86.170000),  Route carried "on" structure: County highway 366,  Year Built: 1967,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 472 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 657 (year 2036),  Design Load: HS 20,  Features Intersected: POORHOUSE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 85.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $754,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $829,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17696,  Location: 3.6 MI E OF COOSA RIVER (Lat: 33.604139,  Lng: -86.134861),  Route carried "on" structure: US 4,  Year Built: 2001,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 10,090 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,126 (year 2040),  Design Load: HS 20,  Features Intersected: BLUE EYE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 228.839,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.2m (82.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.73m (31.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $5,470,000,  Roadway Improvement Cost: $547,000,  Total Project Cost: $6,017,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17697,  Location: .5 MILE SOUTH OF US 78 (Lat: 33.601667,  Lng: -86.161667),  Route carried "on" structure: County highway 207,  Year Built: 2002,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 4,870 (year 2018),  Truck Traffic: 33%,  Average Future Daily Traffic: 5,895 (year 2038),  Design Load: HS 20,  Features Intersected: BLUE EYE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Toll: Toll bridge is a segment,  Owner: County Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.73m (31.92ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $5,470,000,  Roadway Improvement Cost: $547,000,  Total Project Cost: $6,017,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17698,  Location: .7 MI. NORTH U.S. HWY. 78 (Lat: 33.618908,  Lng: -86.156003),  Route carried "on" structure: County highway 207,  Year Built: 2001,  Status: Open,  Structure Length: 1.41m (4.63ft),  Average Daily Traffic: 2,870 (year 2018),  Truck Traffic: 22%,  Average Future Daily Traffic: 3,450 (year 2038),  Design Load: HS 20,  Features Intersected: LOGAN MARTIN BACKWATER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.1m (46.3ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 25.2m (82.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.08m (6.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,171,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,288,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17881,  Location: .5 MI.NORTH OF U.S.78 (Lat: 33.609347,  Lng: -86.162456),  Route carried "on" structure: County highway 207,  Year Built: 2001,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 3,950 (year 2018),  Truck Traffic: 35%,  Average Future Daily Traffic: 4,430 (year 2038),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN R.R.
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.04m (42.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $6,438,000,  Roadway Improvement Cost: $644,000,  Total Project Cost: $7,082,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19645,  Location: .8 MI. N JCT US78 (Lat: 33.615361,  Lng: -86.105111),  Route carried "on" structure: State highway 77,  Year Built: 2012,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 15,298 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,417 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 125.638,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,631,000,  Roadway Improvement Cost: $263,000,  Total Project Cost: $2,894,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20025,  Location: .1 MI N OF CO 005 (Lat: 33.567844,  Lng: -86.039569),  Route carried "on" structure: County highway 460,  Year Built: 1970,  Status: Open,  Structure Length: 1.94m (6.36ft),  Average Daily Traffic: 285 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 440 (year 2038),  Design Load: HS 20,  Features Intersected: EASTABOGA CREEK,  Facility Carried by Structure: WALLACE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $542,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $596,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20077,  Location: .2 MI NORTH OF CO 005 (Lat: 33.568225,  Lng: -86.039750),  Route carried "on" structure: County highway 460,  Year Built: 1970,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 265 (year 2014),  Truck Traffic: 3%,  Average Future Daily Traffic: 400 (year 2036),  Design Load: HS 20,  Features Intersected: EASTABOGA CREEK,  Facility Carried by Structure: WALLACE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 33.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.75m (5.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $343,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $377,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20763,  Location: 1.5 mi. S of JCT INTST 20 (Lat: 33.568414,  Lng: -86.168239),  Route carried "on" structure: County highway 2070,  Year Built: 2018,  Status: Open,  Structure Length: 14.33m (47.01ft),  Average Daily Traffic: 3,080 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,578 (year 2037),  Design Load: HS 20,  Features Intersected: Choccolocco Creek,  Facility Carried by Structure: County Hwy 207
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.381,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 47.9m (157.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.11m (49.57ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: December 2021,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $3,938,000,  Roadway Improvement Cost: $394,000,  Total Project Cost: $4,332,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21161,  Location: 1.6 MI N JCT US78 (Lat: 33.626500,  Lng: -86.102139),  Route carried "on" structure: State highway 77,  Year Built: 2019,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 15,298 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,417 (year 2040),  Design Load: HS 20,  Features Intersected: BLUE EYE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 126.924,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 59.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.14m (23.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,251,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $2,476,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7852,  Location: 2.2 MI W JCT SR 77 (Lat: 33.591267,  Lng: -86.161931),  Route carried "under" structure: Interstate 20,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 51,810 (year 2019),  Truck Traffic: 35%,  Features Intersected: I-20
Minimum Vertical Clearance: 4.99m (16.37ft),  Kilometerpoint: 267.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 8145,  Location: 1.8 MI E JCT SR 77 (Lat: 33.587742,  Lng: -86.091931),  Route carried "under" structure: Interstate 20,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 43,201 (year 2019),  Truck Traffic: 38%,  Features Intersected: I-20,  Facility Carried by Structure: CO79/DRY VALLEY RD
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 273.508,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 20.7m (67.9ft)

Discuss Lincoln, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.