Bridge Statistics for Manhattan, Kansas (KS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 70Number of bridges
  • 945ft / 288mTotal length
  • $4,947,000Total costs
  • 292,179Total average daily traffic
  • 10,732Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Manhattan
  • No street view available for this location

New bridges in Manhattan, KS - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 21930-1939
  • 11940-1949
  • 61950-1959
  • 61960-1969
  • 71970-1979
  • 61980-1989
  • 81990-1999
  • 152000-2009
  • 142010-2019
  • 22020-2022
Reconstructed bridges in Manhattan, KS - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 51990-1999
  • 12000-2009
  • 32010-2019
Average Bridge Daily Traffic in Manhattan, KS
Average Bridge Truck Traffic in Manhattan, KS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.6%Excellent
  • 25.6%Very good
  • 61.5%Good
  • 2.6%Satisfactory
  • 2.6%Fair
  • 5.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 53.8%Very good
  • 28.2%Good
  • 7.7%Satisfactory
  • 7.7%Fair
  • 2.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 43.6%Very good
  • 43.6%Good
  • 10.3%Satisfactory
  • 2.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 29.1%Very good
  • 27.3%Good
  • 29.1%Satisfactory
  • 14.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 24.0%Very good
  • 44.0%Good
  • 20.0%Satisfactory
  • 12.0%Fair
Find on map >>   Show street view

Structure Number: 999901800810501,  Location: 0.90 MI SE 2ND ST. (MNHT) (Lat: 39.174444,  Lng: -96.554167),  Route carried "on" structure: State highway 18,  Year Built: 1996,  Status: Open,  Structure Length: 42.32m (138.85ft),  Average Daily Traffic: 5,758 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,166 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: KANS R & UPRR & RILEY ST
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 18.335,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 53.3m (174.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 21.4m (70.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 138.84m (455.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999901800810561,  Location: 6.9 MI N K-57/K-18 JCT (Lat: 39.168889,  Lng: -96.603611),  Route carried "on" structure: State highway 18,  Year Built: 2007,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 11,465 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,036 (year 2041),  Design Load: HL 93,  Features Intersected: K-113 HWY
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 13.646,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.59m (77.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999901800810571,  Location: Jct K-113/K18 EB (Lat: 39.168611,  Lng: -96.603611),  Route carried "on" structure: State highway 18,  Year Built: 2004,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 11,465 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,036 (year 2041),  Design Load: HL 93,  Features Intersected: K-113 HWY
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 13.612,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.59m (77.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999901800810751,  Location: 1.56 MI NE OF K-114 (Lat: 39.129722,  Lng: -96.673333),  Route carried "on" structure: ServiceCounty highway 33,  Year Built: 2013,  Status: Open,  Structure Length: 5.99m (19.65ft),  Average Daily Traffic: 534 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,894 (year 2041),  Design Load: HL 93,  Features Intersected: K18 HWY,  Facility Carried by Structure: W 56TH AVE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.164,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 19.65m (64.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999901800810771,  Location: 2.22 MI NE OF K-114 (Lat: 39.136944,  Lng: -96.663889),  Route carried "on" structure: State highway 18,  Year Built: 2013,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 10,549 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,675 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: AIRPORT CHANNEL
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 6.785,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 83.4m (273.6ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 69.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 999901800810781,  Location: 3.39 MI NE OF K-114 (Lat: 39.147222,  Lng: -96.649722),  Route carried "on" structure: State highway 18,  Year Built: 2013,  Status: Open,  Structure Length: 4.95m (16.24ft),  Average Daily Traffic: 10,549 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,675 (year 2041),  Design Load: HL 93,  Features Intersected: EUREKA VALLEY TRIBUTARY
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 8.544,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.25m (53.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999901800810791,  Location: 3.39 MI NE OF K-114 (Lat: 39.146944,  Lng: -96.649444),  Route carried "on" structure: State highway 18,  Year Built: 2013,  Status: Open,  Structure Length: 4.95m (16.24ft),  Average Daily Traffic: 10,549 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,675 (year 2041),  Design Load: HL 93,  Features Intersected: EUREKA VALLEY TRIBUTARY
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 8.536,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.25m (53.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999901800810821,  Location: 3.97 MI E OF K-114 JCT (Lat: 39.154167,  Lng: -96.643611),  Route carried "on" structure: County highway 3828,  Year Built: 2013,  Status: Open,  Structure Length: 11.42m (37.47ft),  Average Daily Traffic: 7,667 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,271 (year 2041),  Design Load: HL 93,  Features Intersected: K18 HWY,  Facility Carried by Structure: SCENIC DRIVE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.349,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 37.48m (122.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999901800810831,  Location: 4.74 MI E OF K-114 JCT (Lat: 39.158333,  Lng: -96.632500),  Route carried "on" structure: State highway 18,  Year Built: 2013,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 10,102 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,011 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: KANSAS RIVER DR
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 10.543,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 76.5m (251.0ft)

Condition: Channel: Good,  Culverts: Good,  Inventory Rating: 12.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999901800810841,  Location: 5.77 MI NE OF K-114 (Lat: 39.166667,  Lng: -96.616111),  Route carried "on" structure: City street 3856,  Year Built: 2014,  Status: Open,  Structure Length: 6.05m (19.85ft),  Average Daily Traffic: 2,780 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,895 (year 2041),  Design Load: HL 93,  Features Intersected: K18 HWY,  Facility Carried by Structure: MILLER PKWY/DAVIS
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 3.442,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 19.85m (65.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999901800810901,  Location: 0.56 MI E K113 (Lat: 39.170278,  Lng: -96.593889),  Route carried "on" structure: State highway 18,  Year Built: 2021,  Status: Open,  Structure Length: 7.36m (24.15ft),  Average Daily Traffic: 13,132 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 16,024 (year 2041),  Design Load: HL 93,  Features Intersected: WILDCAT CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 14.553,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.1m (102.0ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 0.0m,  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999902400750011,  Location: 1.35 MI E RILEY COLN, WB (Lat: 39.192500,  Lng: -96.537500),  Route carried "on" structure: US 24,  Year Built: 1960,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 12.79m (41.96ft),  Average Daily Traffic: 12,920 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,966 (year 2041),  Design Load: H 20,  Features Intersected: BIG BLUE RIVER
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 2.157,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.8m (160.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 41.95m (137.63ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Underwater Inspection Date: July 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999902400750041,  Location: 4.69 MI E RILEY COLN (Lat: 39.197500,  Lng: -96.475833),  Route carried "on" structure: US 24,  Year Built: 1950,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 5,717 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,835 (year 2041),  Design Load: H 20,  Features Intersected: SAND CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 7.593,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 67.4m (221.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.08m (6.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 999902400750491,  Location: 1.34 MI E RILEY COLN, EB (Lat: 39.192222,  Lng: -96.537500),  Route carried "on" structure: US 24,  Year Built: 1991,  Status: Open,  Structure Length: 12.79m (41.96ft),  Average Daily Traffic: 12,920 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,966 (year 2041),  Design Load: HS 20,  Features Intersected: BIG BLUE RIVER
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 2.166,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.8m (160.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 84.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 41.95m (137.63ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Underwater Inspection Date: July 2018,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999902400810101,  Location: 0.61 MI SE NJCT K-13 (Lat: 39.244444,  Lng: -96.594722),  Route carried "on" structure: US 24,  Year Built: 1958,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 3,554 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,281 (year 2041),  Design Load: HS 20,  Features Intersected: PHIEL CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 41.861,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.25m (33.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999902400810111,  Location: 2.77 MI SE NJCT K13 (Lat: 39.218611,  Lng: -96.578889),  Route carried "on" structure: US 24,  Year Built: 1942,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 3,554 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,281 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: BIG BLUE RIVER DRAINAGE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 45.044,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.8m (124.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.1m (10.2ft),  Curb-To-Curb Width: 32.9m (107.9ft),  Out-to-Out Width: 86.2m (282.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 29.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 999902400810531,  Location: 0.62 MI SE N JCT K-13 (Lat: 39.244444,  Lng: -96.595000),  Route carried "on" structure: US 24,  Year Built: 2001,  Status: Open,  Structure Length: 3.85m (12.63ft),  Average Daily Traffic: 3,554 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,281 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: PHIEL CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 41.853,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 12.63m (41.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999911300810371,  Location: 1.55 MI N K18 (Lat: 39.189444,  Lng: -96.611667),  Route carried "on" structure: State highway 113,  Year Built: 1968,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 4.86m (15.94ft),  Average Daily Traffic: 16,163 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 24,017 (year 2041),  Design Load: HS 20,  Features Intersected: ANDERSON AVE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 2.977,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 15.95m (52.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 999911300810401,  Location: 2.56 MI N K18 (Lat: 39.203611,  Lng: -96.615833),  Route carried "on" structure: State highway 113,  Year Built: 1972,  Status: Open,  Structure Length: 6.24m (20.47ft),  Average Daily Traffic: 8,081 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,008 (year 2041),  Design Load: HS 20,  Features Intersected: KIMBALL AVE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 4.424,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.48m (67.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 999911300810491,  Location: 1.21 MI N K-18 (Lat: 39.184444,  Lng: -96.610556),  Route carried "on" structure: State highway 113,  Year Built: 1993,  Status: Open,  Structure Length: 8.13m (26.67ft),  Average Daily Traffic: 19,093 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 28,371 (year 2041),  Design Load: HS 20,  Features Intersected: WILDCAT CREEK
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 2.414,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 26.66m (87.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999911300810511,  Location: 2.55 MI N K-18 (Lat: 39.203611,  Lng: -96.615556),  Route carried "on" structure: State highway 113,  Year Built: 1996,  Status: Open,  Structure Length: 6.26m (20.54ft),  Average Daily Traffic: 4,783 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,107 (year 2041),  Design Load: HS 20,  Features Intersected: KIMBALL AVE
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 4.598,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.4m (60.4ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.55m (67.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: CEPMRKKS0000004,  Location: MANHATTAN, KS. (Lat: 39.263494,  Lng: -96.577789),  Route carried "on" structure: State highway 13,  Year Built: 1960,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 25.56m (83.86ft),  Average Daily Traffic: 1,770 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,000 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: TUTTLE CREEK LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 18,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Excellent,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 34.79m (114.14ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $1,935,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $2,903,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: CEPNWKKS0000055,  Location: MANHATTAN, KS (Lat: 39.248644,  Lng: -96.598461),  Route carried "on" structure: ServiceOther road ,  Year Built: 1950,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 300 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 300 (year 2040),  Design Load: HS 20,  Features Intersected: TUTTLE-WOLF CREEK-BOX,  Facility Carried by Structure: SERVICE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 42.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $93,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $140,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 999901800810501,  Location: 0.90 MI SE 2ND ST. (MNHT) (Lat: 39.174444,  Lng: -96.554167),  Route carried "under" structure: State highway 18,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 10,886 (year 2020),  Truck Traffic: 2%,  Features Intersected: KANS R & UPRR & RILEY ST
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.161,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 999901800810561,  Location: 6.9 MI N K-57/K-18 JCT (Lat: 39.168889,  Lng: -96.603611),  Route carried "under" structure: State highway 113,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 9,655 (year 2020),  Truck Traffic: 2%,  Features Intersected: K-113 HWY,  Facility Carried by Structure: K-18 HWY, WB
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 0.486,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 999901800810571,  Location: Jct K-113/K18 EB (Lat: 39.168611,  Lng: -96.603611),  Route carried "under" structure: State highway 113,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 9,655 (year 2020),  Truck Traffic: 2%,  Features Intersected: K-113 HWY,  Facility Carried by Structure: K-18 HWY, EB
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.459,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 999901800810751,  Location: 1.56 MI NE OF K-114 (Lat: 39.129722,  Lng: -96.673333),  Route carried "under" structure: State highway 18,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 9,445 (year 2020),  Truck Traffic: 3%,  Features Intersected: K18 HWY,  Facility Carried by Structure: W 56TH AVE
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 5.726,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 999901800810821,  Location: 3.97 MI E OF K-114 JCT (Lat: 39.154167,  Lng: -96.643611),  Route carried "under" structure: State highway 18,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 10,102 (year 2020),  Truck Traffic: 3%,  Features Intersected: K18 HWY,  Facility Carried by Structure: SCENIC DRIVE
Minimum Vertical Clearance: 5.71m (18.73ft),  Kilometerpoint: 9.503,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 999901800810841,  Location: 5.77 MI NE OF K-114 (Lat: 39.166667,  Lng: -96.616111),  Route carried "under" structure: State highway 18,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 10,102 (year 2020),  Truck Traffic: 3%,  Features Intersected: K18 HWY,  Facility Carried by Structure: MILLER PKWY/DAVIS
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 12.492,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)