Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Morgantown, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 82Number of bridges
  • 994ft / 303mTotal length
  • $32,887,000Total costs
  • 1,022,366Total average daily traffic
  • 126,359Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Morgantown
  • No street view available for this location

New bridges in Morgantown, WV - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 41920-1929
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 111960-1969
  • 331970-1979
  • 51980-1989
  • 71990-1999
  • 92000-2009
  • 72010-2019
  • 12020-2022
Average Bridge Daily Traffic in Morgantown, WV
Average Bridge Truck Traffic in Morgantown, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.7%Very good
  • 37.8%Good
  • 35.1%Satisfactory
  • 10.8%Fair
  • 13.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.0%Very good
  • 50.0%Good
  • 10.0%Satisfactory
  • 18.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Very good
  • 37.5%Good
  • 25.0%Satisfactory
  • 25.0%Fair
  • 6.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.7%Excellent
  • 25.6%Very good
  • 30.2%Good
  • 18.6%Satisfactory
  • 18.6%Fair
  • 2.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 50.0%Satisfactory
  • 16.7%Poor
Find on map >>   Show street view

Structure Number: 31A016,  Location: 0.02 MI WEST WV RT 7 (Lat: 39.628519,  Lng: -79.953981),  Route carried "on" structure: State highway 700,  Year Built: 1979,  Status: Open,  Structure Length: 15.23m (49.97ft),  Average Daily Traffic: 12,000 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,325 (year 2038),  Design Load: HS 20,  Features Intersected: DECKERS CREEK,  Facility Carried by Structure: WV ROUTE 7 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 43.4m (142.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 15.24m (50.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $341,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $511,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A017,  Location: 0.05 MI EAST US ROUTE 119 (Lat: 39.627511,  Lng: -79.955300),  Route carried "on" structure: State highway 700,  Year Built: 1992,  Status: Open,  Structure Length: 16.85m (55.28ft),  Average Daily Traffic: 15,000 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 20,400 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: DECKERS CREEK,  Facility Carried by Structure: WV ROUTE 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.382,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 44.8m (147.0ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 17.07m (56.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,189,000,  Roadway Improvement Cost: $1,537,000,  Total Project Cost: $3,754,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A018,  Location: 0.65 MI WEST CO RT 64 (Lat: 39.624839,  Lng: -79.944811),  Route carried "on" structure: State highway 700,  Year Built: 1991,  Status: Open,  Structure Length: 4.32m (14.17ft),  Average Daily Traffic: 13,000 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,800 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: DECKERS CREEK,  Facility Carried by Structure: WV ROUTE 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.879,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.9m (68.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.64m (18.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $804,000,  Roadway Improvement Cost: $751,000,  Total Project Cost: $1,596,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A051,  Location: 0.01 MI NORTH MON CO 45 (Lat: 39.630831,  Lng: -79.960069),  Route carried "on" structure: US 1900,  Year Built: 1977,  Status: Open,  Structure Length: 23.02m (75.52ft),  Average Daily Traffic: 19,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,190 (year 2041),  Design Load: HS 20,  Features Intersected: Monongahela River, R.R.,  Facility Carried by Structure: US ROUTE 19
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 17.832,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Navigation Control: Yes ( Vertical Clearance: 14.3m (46.9ft), Horizontal Clearance: 91.4m (299.9ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 97.4m (319.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 24.38m (79.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $5,391,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $5,744,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A118,  Location: 0.56 MI WEST I-68 (Lat: 39.578350,  Lng: -79.976200),  Route carried "on" structure: Ramp Interstate 6800,  Year Built: 1970,  Status: Open,  Structure Length: 13.31m (43.67ft),  Average Daily Traffic: 11,800 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 16,870 (year 2041),  Design Load: HS 20,  Features Intersected: I-68 EB Ramp and I-79,  Facility Carried by Structure: I-68 SOUTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 53.3m (174.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.32m (43.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $968,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,068,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 31A119,  Location: 0.20 MI EAST I-79 (Lat: 39.578919,  Lng: -79.975600),  Route carried "on" structure: Interstate 6800,  Year Built: 1970,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 49,600 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 70,930 (year 2041),  Design Load: HS 20,  Features Intersected: BOOTHS CREEK,  Facility Carried by Structure: INTERSTATE 68
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 43.3m (142.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 31A12,  Location: 0.58 MI EAST US RT 119 (Lat: 39.588000,  Lng: -79.941450),  Route carried "on" structure: Interstate 6800,  Year Built: 1971,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 42,100 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 51,400 (year 2041),  Features Intersected: COBUN CREEK,  Facility Carried by Structure: INTERSTATE 68
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.106,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $354,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 31A121,  Location: 1.03 MI WEST WV RT 7 (Lat: 39.599689,  Lng: -79.930500),  Route carried "on" structure: Interstate 6800,  Year Built: 1971,  Status: Open,  Structure Length: 4.38m (14.37ft),  Average Daily Traffic: 21,050 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 30,100 (year 2041),  Design Load: HS 20,  Features Intersected: Mon. Co. Rt. 64/1,  Facility Carried by Structure: INTERSTATE 68 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.182,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $497,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A122,  Location: 2.84 MI EAST US ROUTE 119 (Lat: 39.611531,  Lng: -79.922939),  Route carried "on" structure: Interstate 6800,  Year Built: 1973,  Status: Open,  Structure Length: 22.29m (73.13ft),  Average Daily Traffic: 20,250 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 28,960 (year 2041),  Design Load: HS 20,  Features Intersected: Deckers Ck.& WV Rt.7,  Facility Carried by Structure: INTERSTATE 68 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.727,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 39.5m (129.6ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 31A135,  Location: 0.01 MI NORTH WV 100 (Lat: 39.678869,  Lng: -79.978331),  Route carried "on" structure: County highway 5300,  Year Built: 1921,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 3,000 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,075 (year 2038),  Features Intersected: ROBINSON RUN,  Facility Carried by Structure: MONONGALIA CR 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.1m (26.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $178,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $492,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A136,  Location: 0.12 MI SOUTH CO RT 67/1 (Lat: 39.667500,  Lng: -79.958300),  Route carried "on" structure: County highway 5900,  Year Built: 1985,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 13,800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,390 (year 2041),  Design Load: HS 20,  Features Intersected: WEST RUN,  Facility Carried by Structure: MONONGALIA CR 59
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.320,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.2m (33.5ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A138,  Location: 1.03 MI WEST WV RT 7 (Lat: 39.599631,  Lng: -79.930231),  Route carried "on" structure: Interstate 6800,  Year Built: 1971,  Status: Open,  Structure Length: 4.38m (14.37ft),  Average Daily Traffic: 21,050 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 30,100 (year 2041),  Design Load: HS 20,  Features Intersected: Mon. Co. Rt. 64/1,  Facility Carried by Structure: INTERSTATE 68 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.182,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $497,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A14,  Location: 2.84 MI EAST US RT 119 (Lat: 39.611289,  Lng: -79.922911),  Route carried "on" structure: Interstate 6800,  Year Built: 1973,  Status: Open,  Structure Length: 21.58m (70.80ft),  Average Daily Traffic: 20,250 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 28,960 (year 2041),  Design Load: HS 20,  Features Intersected: WV 7 Deckers Creek,  Facility Carried by Structure: INTERSTATE 68 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.727,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 35.8m (117.5ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Excellent,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 31A144,  Location: 0.11 MI NORTH CO RT 67/1 (Lat: 39.657789,  Lng: -79.932239),  Route carried "on" structure: County highway 6700,  Year Built: 1990,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 3,800 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,175 (year 2038),  Design Load: HS 20,  Features Intersected: WEST RUN,  Facility Carried by Structure: MGL CO RT 67
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.426,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Wood or Timber,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.0m (39.4ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $771,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A151,  Location: 0.03 MI NORTH CO RT 73/7 (Lat: 39.586300,  Lng: -79.976400),  Route carried "on" structure: County highway 7300,  Year Built: 1931,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 2,900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,495 (year 2041),  Features Intersected: BOOTHS CREEK,  Facility Carried by Structure: MONONGALIA CR 73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.633,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $598,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 31A158,  Location: 0.07 MI WEST CO RT 76 (Lat: 39.536100,  Lng: -79.976269),  Route carried "on" structure: County highway 7700,  Year Built: 1993,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 1,600 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,175 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: OWL CREEK,  Facility Carried by Structure: MONONGALIA CR 77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A163,  Location: 0.47 MI SOUTH CO RT 77 (Lat: 39.531781,  Lng: -79.997561),  Route carried "on" structure: Interstate 7900,  Year Built: 1967,  Status: Open,  Structure Length: 3.83m (12.57ft),  Average Daily Traffic: 22,350 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 31,950 (year 2038),  Design Load: HS 20,  Features Intersected: MON CO 79/4,  Facility Carried by Structure: INTERSTATE 79 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 233.645,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.5m (47.6ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $683,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A164,  Location: 0.47 MI SOUTH CO RT 77 (Lat: 39.531919,  Lng: -79.997739),  Route carried "on" structure: Interstate 7900,  Year Built: 1967,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 22,350 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 31,950 (year 2038),  Design Load: HS 20,  Features Intersected: Mon. Co. 79/4,  Facility Carried by Structure: INTERSTATE 79 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 233.645,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.6m (41.3ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $356,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $587,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A165,  Location: 3.16 MI SOUTH I-68 (Lat: 39.537539,  Lng: -79.993069),  Route carried "on" structure: Interstate 7900,  Year Built: 1967,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 24,800 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 35,460 (year 2041),  Design Load: HS 20,  Features Intersected: Mon. Co. Rt. 77,  Facility Carried by Structure: INTERSTATE 79 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 234.401,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.6m (51.2ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $832,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,059,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A166,  Location: 3.16 MI SOUTH I-68 (Lat: 39.537611,  Lng: -79.993311),  Route carried "on" structure: Interstate 7900,  Year Built: 1967,  Status: Open,  Structure Length: 4.43m (14.53ft),  Average Daily Traffic: 24,800 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 35,460 (year 2041),  Design Load: HS 20,  Features Intersected: Mon. Co. Rt. 77,  Facility Carried by Structure: INTERSTATE 79 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 234.401,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.4m (50.5ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.42m (14.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $851,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $1,328,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A167,  Location: 3.16 MI NORTH CO RT 77 (Lat: 39.578600,  Lng: -79.976000),  Route carried "on" structure: Interstate 7900,  Year Built: 1970,  Status: Open,  Structure Length: 5.89m (19.32ft),  Average Daily Traffic: 23,600 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 33,750 (year 2041),  Design Load: HS 20,  Features Intersected: I-68 Eastbound On-Ramp,  Facility Carried by Structure: INTERSTATE 79 NB
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 239.486,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.6m (67.6ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.88m (19.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $884,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,118,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A168,  Location: 3.16 MI NORTH CO RT 77 (Lat: 39.578600,  Lng: -79.976300),  Route carried "on" structure: Interstate 7900,  Year Built: 1970,  Status: Open,  Structure Length: 5.89m (19.32ft),  Average Daily Traffic: 23,600 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 33,750 (year 2041),  Design Load: HS 20,  Features Intersected: I-68 Eastbound On-Ramp,  Facility Carried by Structure: INTERSTATE 79 SB
Minimum Vertical Clearance: 6.91m (22.67ft),  Kilometerpoint: 239.486,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.6m (67.6ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.88m (19.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $884,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,118,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A169,  Location: 0.46 MILES NORTH I-68 (Lat: 39.584700,  Lng: -79.979200),  Route carried "on" structure: Interstate 7900,  Year Built: 1970,  Status: Open,  Structure Length: 3.83m (12.57ft),  Average Daily Traffic: 47,600 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 68,070 (year 2041),  Design Load: HS 20,  Features Intersected: Mon. Co. Rt. 73,  Facility Carried by Structure: INTERSTATE 79
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 240.259,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 32.1m (105.3ft),  Out-to-Out Width: 34.0m (111.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $733,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $941,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A17,  Location: 0.55 MILE NORTH OF I-68 (Lat: 39.588211,  Lng: -79.979250),  Route carried "on" structure: Interstate 7900,  Year Built: 1971,  Status: Open,  Structure Length: 47.23m (154.95ft),  Average Daily Traffic: 47,596 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 64,726 (year 2039),  Design Load: HS 20,  Features Intersected: Monongahela River,  Facility Carried by Structure: INTERSTATE 79
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 240.404,  Lanes on structure: 5,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 27.1m (88.9ft), Horizontal Clearance: 125.0m (410.1ft)),  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 8,  Length of Maximum Span: 146.3m (480.0ft),  Curb-To-Curb Width: 27.2m (89.2ft),  Out-to-Out Width: 29.1m (95.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: September 2021,  Underwater Inspection Date: August 2020,  Other Special Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 31A183,  Location: 0.76 MI WEST CO RT 81 (Lat: 39.592481,  Lng: -79.943850),  Route carried "on" structure: County highway 8101,  Year Built: 1959,  Status: Posted for load,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 10 (year 2018),  Average Future Daily Traffic: 14 (year 2038),  Features Intersected: COBUN CREEK,  Facility Carried by Structure: MONON CO RT 81/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.223,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $148,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $337,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 31A192,  Location: 0.32 MI SOUTH CO RT 19/5 (Lat: 39.684289,  Lng: -79.978889),  Route carried "on" structure: State highway 10000,  Year Built: 1994,  Status: Open,  Structure Length: 1.90m (6.23ft),  Average Daily Traffic: 2,900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,740 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: ROBINSON RUN,  Facility Carried by Structure: WV ROUTE 100
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.017,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A193,  Location: 0.01 MI SOUTH CO RT 54 (Lat: 39.690139,  Lng: -79.982889),  Route carried "on" structure: State highway 10000,  Year Built: 1925,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,900 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,950 (year 2038),  Features Intersected: ROBINSON RUN,  Facility Carried by Structure: WV ROUTE 100
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.838,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $181,000,  Roadway Improvement Cost: $153,000,  Total Project Cost: $511,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 31A194,  Location: 0.45 MI NORTH CO RT 54 (Lat: 39.695761,  Lng: -79.986611),  Route carried "on" structure: State highway 10000,  Year Built: 1925,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 2,900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,740 (year 2041),  Features Intersected: ROBINSON RUN,  Facility Carried by Structure: WV ROUTE 100
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.578,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Superstructure: Poor,  Channel: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $307,000,  Roadway Improvement Cost: $243,000,  Total Project Cost: $651,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 31A195,  Location: 0.25 MI NORTH CO RT 76 (Lat: 39.584031,  Lng: -79.953719),  Route carried "on" structure: US 11900,  Year Built: 1971,  Status: Open,  Structure Length: 9.70m (31.82ft),  Average Daily Traffic: 18,800 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 25,575 (year 2038),  Design Load: HS 20,  Features Intersected: I-68 EB & WB,  Facility Carried by Structure: US ROUTE 119
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.496,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 27.0m (88.6ft),  Out-to-Out Width: 28.2m (92.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.69m (31.79ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $882,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,138,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A196,  Location: 0.40 MI NORTH CO RT 857 (Lat: 39.610339,  Lng: -79.969500),  Route carried "on" structure: US 11900,  Year Built: 1964,  Status: Open,  Structure Length: 5.74m (18.83ft),  Average Daily Traffic: 23,100 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 29,100 (year 2041),  Design Load: HS 20,  Features Intersected: COBUN CREEK,  Facility Carried by Structure: US ROUTE 119
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.052,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 25 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $564,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31A197,  Location: 0.21 MI SOUTH US RT 19 (Lat: 39.627619,  Lng: -79.960139),  Route carried "on" structure: US 11900,  Year Built: 1993,  Status: Open,  Structure Length: 8.82m (28.94ft),  Average Daily Traffic: 25,300 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 34,400 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Deckers Creek, Trail,  Facility Carried by Structure: US ROUTE 119
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.177,  Lanes on structure: 5,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,033,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $2,251,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A199,  Location: 0.08 MI NORTH CO RT 81/2 (Lat: 39.581469,  Lng: -79.938950),  Route carried "on" structure: County highway 11906,  Year Built: 1988,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 200 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 275 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: COBUN CREEK,  Facility Carried by Structure: MON CO RT 119/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.269,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A2,  Location: 0.22 MI NORTH CO RT 81/2 (Lat: 39.582719,  Lng: -79.941400),  Route carried "on" structure: County highway 11906,  Year Built: 1988,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 200 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 275 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: COBUN CREEK,  Facility Carried by Structure: MON CO RT 119/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.494,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.6m (31.5ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $228,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $524,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A203,  Location: 0.07 MI SOUTH CO RT 64/1 (Lat: 39.611961,  Lng: -79.933289),  Route carried "on" structure: County highway 85700,  Year Built: 1966,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 10,100 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 13,725 (year 2038),  Design Load: HS 20,  Features Intersected: AARON CREEK,  Facility Carried by Structure: MONONGALIA CR 857
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.476,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 31A212,  Location: 0.09 MI WEST CO RT 76 (Lat: 39.535319,  Lng: -79.977050),  Route carried "on" structure: County highway 7700,  Year Built: 1993,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 1,600 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,175 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BOOTHS CREEK,  Facility Carried by Structure: MONONGALIA CR 77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.851,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A248,  Location: 0.05 MI SOUTH CO RT 81/2 (Lat: 39.580500,  Lng: -79.937811),  Route carried "on" structure: County highway 11906,  Year Built: 1987,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 300 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 400 (year 2038),  Design Load: HS 20,  Features Intersected: COBUN CREEK,  Facility Carried by Structure: MON CO RT 119/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.060,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A262,  Location: 0.04 MI SOUTH CO RT 67/1 (Lat: 39.667900,  Lng: -79.948200),  Route carried "on" structure: County highway 6104,  Year Built: 1970,  Status: Open,  Structure Length: 1.87m (6.14ft),  Average Daily Traffic: 5,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,060 (year 2041),  Design Load: HS 20,  Features Intersected: WEST RUN,  Facility Carried by Structure: MONONGALIA CR 64/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A267,  Location: 0.01 MI SOUTH CO RT 68/7 (Lat: 39.623150,  Lng: -79.922931),  Route carried "on" structure: County highway 740,  Year Built: 1912,  Status: Posted for load,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 390 (year 2041),  Features Intersected: KNOCKING RUN,  Facility Carried by Structure: MON CO Rt 7/40
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $418,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Morgantown, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.