Bridge Statistics for Perry, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 52Number of bridges
  • 686ft / 209mTotal length
  • $74,283,000Total costs
  • 765,370Total average daily traffic
  • 159,207Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Perry
  • No street view available for this location

New bridges in Perry, GA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 21950-1959
  • 101960-1969
  • 31970-1979
  • 31980-1989
  • 151990-1999
  • 32000-2009
  • 42010-2019
  • 12020-2022
Reconstructed bridges in Perry, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 71980-1989
  • 11990-1999
  • 22000-2009
Average Bridge Daily Traffic in Perry, GA
Average Bridge Truck Traffic in Perry, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.4%Very good
  • 77.1%Good
  • 11.4%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 45.7%Very good
  • 48.6%Good
  • 5.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 17.1%Very good
  • 80.0%Good
  • 2.9%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 43.8%Very good
  • 34.4%Good
  • 15.6%Satisfactory
  • 6.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 88.9%Good
  • 11.1%Satisfactory
Find on map >>   Show street view

Structure Number: 1530004,  Location: 7 MI SSW OF PERRY (Lat: 32.366728,  Lng: -83.789008),  Route carried "on" structure: US 41,  Year Built: 1927,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,140 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,710 (year 2032),  Design Load: H 15,  Features Intersected: SOUTH PRONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 1530005,  Location: 3.5 MI SW OF PERRY (Lat: 32.416617,  Lng: -83.775531),  Route carried "on" structure: US 41,  Year Built: 1954,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 2,350 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,525 (year 2032),  Design Load: H 20,  Features Intersected: FLAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 43.89m (144.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530006,  Location: PERRY - SW SECTION (Lat: 32.446778,  Lng: -83.754589),  Route carried "on" structure: US 41,  Year Built: 1963,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 10,200 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,300 (year 2032),  Design Load: HS 20,  Features Intersected: I-75 @134.61(EXIT 135)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,449,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $2,174,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530007,  Location: PERRY - CENTER SECTION (Lat: 32.455958,  Lng: -83.739097),  Route carried "on" structure: US 41,  Year Built: 1931,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 8.72m (28.61ft),  Average Daily Traffic: 12,590 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,885 (year 2032),  Design Load: H 15,  Features Intersected: BIG INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,032,000,  Roadway Improvement Cost: $203,000,  Total Project Cost: $3,048,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1530012,  Location: 2.3 MI E OF PERRY (Lat: 32.454319,  Lng: -83.687539),  Route carried "on" structure: US 341,  Year Built: 1928,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,110 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,165 (year 2032),  Design Load: H 15,  Features Intersected: BIG INDIAN CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.47m (24.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1530031,  Location: 2.7 MI N OF PERRY (Lat: 32.511078,  Lng: -83.743111),  Route carried "on" structure: County highway 195,  Year Built: 1962,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: I-75 @ 139.14E,  Facility Carried by Structure: TODD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $805,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,207,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530035,  Location: 6 MI S OF BONAIRE (Lat: 32.462564,  Lng: -83.611978),  Route carried "on" structure: US 129,  Year Built: 1959,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,290 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,935 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MOSSY CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 1530044,  Location: 7 MI S OF PERRY (Lat: 32.364950,  Lng: -83.768167),  Route carried "on" structure: Interstate 75,  Year Built: 1963,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 42,580 (year 2012),  Truck Traffic: 26%,  Average Future Daily Traffic: 63,870 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SOUTH PRONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 207.606,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $229,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $343,000
Find on map >>   Show street view

Structure Number: 1530045,  Location: 7 MI S OF PERRY (Lat: 32.365381,  Lng: -83.768600),  Route carried "on" structure: Interstate 75,  Year Built: 1963,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 42,580 (year 2012),  Truck Traffic: 26%,  Average Future Daily Traffic: 63,870 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SOUTH PRONG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 207.606,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $229,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $343,000
Find on map >>   Show street view

Structure Number: 1530046,  Location: 3 MI SW OF PERRY (Lat: 32.418828,  Lng: -83.761019),  Route carried "on" structure: Interstate 75,  Year Built: 1963,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 42,580 (year 2012),  Truck Traffic: 26%,  Average Future Daily Traffic: 63,870 (year 2032),  Design Load: HS 20,  Features Intersected: FLAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 214.043,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 40.7m (133.5ft),  Out-to-Out Width: 42.5m (139.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $1,046,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,569,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530048,  Location: PERRY - WESTSIDE (Lat: 32.458256,  Lng: -83.750567),  Route carried "on" structure: Interstate 75,  Year Built: 1963,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 7.86m (25.79ft),  Average Daily Traffic: 49,510 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 74,265 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 217.262,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 40.7m (133.5ft),  Out-to-Out Width: 42.4m (139.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $2,108,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $3,162,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530052,  Location: PERRY - NW SECTION (Lat: 32.471647,  Lng: -83.743853),  Route carried "on" structure: Interstate 75,  Year Built: 1962,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 49,200 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 73,800 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 7 (US 341)EXIT136
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 218.871,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 40.7m (133.5ft),  Out-to-Out Width: 42.5m (139.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,797,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $2,696,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530056,  Location: 6 MI S OF PERRY (Lat: 32.382269,  Lng: -83.768108),  Route carried "on" structure: County highway 543,  Year Built: 1963,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 15,  Features Intersected: I-75@130.04,  Facility Carried by Structure: FIRETOWER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 24.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,125,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,688,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530058,  Location: PERRY - WESTSIDE (Lat: 32.455150,  Lng: -83.752178),  Route carried "on" structure: County highway 622,  Year Built: 1963,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 240 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 360 (year 2032),  Design Load: H 20,  Features Intersected: I-75 @ 135.17N,  Facility Carried by Structure: GAINES DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $985,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,477,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530068,  Location: 4 MI N OF PERRY (Lat: 32.510397,  Lng: -83.694647),  Route carried "on" structure: County highway 2043,  Year Built: 1984,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 3,940 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,910 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LAKE JOY,  Facility Carried by Structure: LAKE JOY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 1530069,  Location: 4.1 MI N OF PERRY (Lat: 32.511689,  Lng: -83.693758),  Route carried "on" structure: County highway 2043,  Year Built: 1984,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 3,940 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,910 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: JOY LAKE,  Facility Carried by Structure: LAKE JOY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 1530084,  Location: 2 MI N OF PERRY (Lat: 32.493239,  Lng: -83.742639),  Route carried "on" structure: State highway 11,  Year Built: 1988,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 8,250 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,375 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75 (EXIT 138) @ 137.93
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,014,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,522,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1530085,  Location: 2.5 MI SE OF PERRY (Lat: 32.426747,  Lng: -83.714339),  Route carried "on" structure: State highway 224,  Year Built: 1992,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 2,900 (year 2012),  Truck Traffic: 18%,  Average Future Daily Traffic: 4,350 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FLAT CREEK,  Facility Carried by Structure: LARRY WALKER PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530086,  Location: 4 MI SE OF PERRY (Lat: 32.404178,  Lng: -83.645308),  Route carried "on" structure: State highway 224,  Year Built: 1994,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 2,670 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,005 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CONVEYOR BELT,  Facility Carried by Structure: LARRY WALKER PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $606,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $908,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530087,  Location: 4 MI SE OF PERRY (Lat: 32.404258,  Lng: -83.645078),  Route carried "on" structure: State highway 224,  Year Built: 1994,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 2,670 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,005 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CONVEYOR BELT,  Facility Carried by Structure: LARRY WALKER PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $606,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $908,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530088,  Location: 5 MI SE OF PERRY (Lat: 32.403019,  Lng: -83.644369),  Route carried "on" structure: State highway 224,  Year Built: 1994,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 2,670 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,005 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GA SOU & FLA RAILROAD,  Facility Carried by Structure: LARRY WALKER PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $879,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,319,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530089,  Location: 5 MI SE OF PERRY (Lat: 32.402881,  Lng: -83.644525),  Route carried "on" structure: State highway 224,  Year Built: 1994,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 2,670 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,005 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GA SOU & FLA RAILROAD,  Facility Carried by Structure: LARRY WALKER PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $879,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,319,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530091,  Location: 5.7 MI SE OF PERRY (Lat: 32.426753,  Lng: -83.644228),  Route carried "on" structure: US 341,  Year Built: 1995,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 4,330 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,495 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $1,250,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,875,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530092,  Location: 5.4 MI N OF PERRY (Lat: 32.521108,  Lng: -83.722928),  Route carried "on" structure: US 41,  Year Built: 1995,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 5,720 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,580 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MOSSY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $938,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530095,  Location: 7 MI E OF PERRY (Lat: 32.451119,  Lng: -83.624139),  Route carried "on" structure: Spur State highway 247,  Year Built: 1994,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 3,410 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,115 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MOSSY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $1,250,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,875,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1530096,  Location: 5 MI N OF PERRY (Lat: 32.531947,  Lng: -83.743356),  Route carried "on" structure: Interstate 75,  Year Built: 1995,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 52,020 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 78,030 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MOSSY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 226.918,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 87.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $796,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,193,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1530097,  Location: 5 MI N OF PERRY (Lat: 32.531928,  Lng: -83.743878),  Route carried "on" structure: Interstate 75,  Year Built: 1995,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 52,020 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 78,030 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MOSSY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 226.918,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 87.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $796,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,193,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1535001,  Location: IN CENTERVILLE (Lat: 32.634628,  Lng: -83.679967),  Route carried "on" structure: City street 63,  Year Built: 1960,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 2,490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,735 (year 2032),  Design Load: H 15,  Features Intersected: BAY GALL CREEK TRIB,  Facility Carried by Structure: COLLINS AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 42.09m (138.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $352,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1535006,  Location: PERRY - WESTSIDE (Lat: 32.464419,  Lng: -83.762231),  Route carried "on" structure: County highway 205,  Year Built: 1970,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 600 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2032),  Design Load: H 15,  Features Intersected: BAY CREEK,  Facility Carried by Structure: SMITH DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $586,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1535014,  Location: 4 MI NE OF PERRY (Lat: 32.490539,  Lng: -83.652797),  Route carried "on" structure: County highway 279,  Year Built: 1970,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,300 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,950 (year 2032),  Design Load: H 15,  Features Intersected: MOSSY CREEK TRIB,  Facility Carried by Structure: BEAR BRANCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 1535021,  Location: 2.5 MI N OF PERRY (Lat: 32.520897,  Lng: -83.720536),  Route carried "on" structure: County highway 195,  Year Built: 1995,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MOSSY CREEK,  Facility Carried by Structure: 41 CIRCLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 153503,  Location: 5 MI SE OF ELKO (Lat: 32.315558,  Lng: -83.644528),  Route carried "on" structure: State highway 26,  Year Built: 1996,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,060 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,590 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CATNA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1535031,  Location: SOUTH PERRY (Lat: 32.431592,  Lng: -83.756944),  Route carried "on" structure: City street 835,  Year Built: 1999,  Status: Open,  Structure Length: 10.09m (33.10ft),  Average Daily Traffic: 1,230 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,845 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-75@ 133.60 (EXIT 134),  Facility Carried by Structure: SOUTH PERRY PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 34.2m (112.2ft),  Out-to-Out Width: 35.3m (115.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,351,000,  Roadway Improvement Cost: $235,000,  Total Project Cost: $3,527,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1535032,  Location: SW OF PERRY (Lat: 32.475008,  Lng: -83.777228),  Route carried "on" structure: City street 838,  Year Built: 1999,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 830 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,245 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BAY CREEK,  Facility Carried by Structure: PERRY VET PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1535033,  Location: SW OF PERRY (Lat: 32.475158,  Lng: -83.777408),  Route carried "on" structure: City street 838,  Year Built: 1999,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 830 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,245 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BAY CREEK,  Facility Carried by Structure: PERRY VET PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 12 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1535039,  Location: 4 MI. S OF PERRY (Lat: 32.400706,  Lng: -83.731669),  Route carried "on" structure: County highway 676,  Year Built: 2008,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 1,270 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,905 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OKEETUCK CREEK,  Facility Carried by Structure: ELKO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $164,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $246,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1535043,  Location: 4.5 MILES NE OF PERRY (Lat: 32.498708,  Lng: -83.666639),  Route carried "on" structure: State highway 127,  Year Built: 2009,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 9,550 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,325 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MOSSY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 26.4m (86.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 45.11m (148.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,208,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,812,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1535044,  Location: 2.5 MILES S. PERRY (Lat: 32.422439,  Lng: -83.732486),  Route carried "on" structure: County highway 676,  Year Built: 2009,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 1,270 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,905 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FLAT CREEK,  Facility Carried by Structure: ELKO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1535047,  Location: 2.5 MI N OF PERRY (Lat: 32.530297,  Lng: -83.714150),  Route carried "on" structure: County highway 187,  Year Built: 2011,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: BEULAH BRANCH,  Facility Carried by Structure: SANDEFUR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $597,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1535048,  Location: SE PERRY (Lat: 32.445517,  Lng: -83.728367),  Route carried "on" structure: City street 99999,  Year Built: 2012,  Status: Open,  Structure Length: 13.05m (42.81ft),  Average Daily Traffic: 3,000 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,000 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BIG INDIAN CREEK,  Facility Carried by Structure: BALL STREET EXT.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,672,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $2,508,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1535049,  Location: 6.5 MI NE OF PERRY (Lat: 32.517858,  Lng: -83.644342),  Route carried "on" structure: County highway 2781,  Year Built: 2013,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 6,320 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,480 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: MOSSY CREEK TRIB,  Facility Carried by Structure: MOODY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.3m (56.8ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Discuss Perry, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.