Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Perry, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 52Number of bridges
  • 686ft / 209mTotal length
  • $74,283,000Total costs
  • 765,370Total average daily traffic
  • 159,207Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Perry
  • No street view available for this location

New bridges in Perry, GA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11930-1939
  • 21950-1959
  • 101960-1969
  • 31970-1979
  • 31980-1989
  • 151990-1999
  • 32000-2009
  • 42010-2019
  • 12020-2022
Reconstructed bridges in Perry, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 71980-1989
  • 11990-1999
  • 22000-2009
Average Bridge Daily Traffic in Perry, GA
Average Bridge Truck Traffic in Perry, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.4%Very good
  • 77.1%Good
  • 11.4%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 45.7%Very good
  • 48.6%Good
  • 5.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 17.1%Very good
  • 80.0%Good
  • 2.9%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 43.8%Very good
  • 34.4%Good
  • 15.6%Satisfactory
  • 6.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 88.9%Good
  • 11.1%Satisfactory
Find on map >>   Show street view

Structure Number: 153505,  Location: 0.5 MI W OF BONAIRE (Lat: 32.551981,  Lng: -83.598567),  Route carried "on" structure: State highway 96,  Year Built: 2016,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 7,830 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,745 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NORFOLK SOUTHERN RAILWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $8,510,000,  Roadway Improvement Cost: $851,000,  Total Project Cost: $12,765,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1535054,  Location: PERRY - WESTSIDE (Lat: 32.455586,  Lng: -83.779106),  Route carried "on" structure: County highway 206,  Year Built: 2020,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 100 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 150 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BIG INDIAN CREEK,  Facility Carried by Structure: MOSS OAKS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $8,880,000,  Roadway Improvement Cost: $888,000,  Total Project Cost: $13,320,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2255001,  Location: 6.5 MI SE OF FT VALLEY (Lat: 32.460408,  Lng: -83.816978),  Route carried "on" structure: County highway 5,  Year Built: 1979,  Status: Posted for load,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 15,  Features Intersected: BIG INDIAN CREEK,  Facility Carried by Structure: CLOPINE LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $821,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1530006,  Location: PERRY - SW SECTION (Lat: 32.446778,  Lng: -83.754589),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 46,590 (year 2009),  Truck Traffic: 40%,  Features Intersected: SR 7 (US 41),  Facility Carried by Structure: US 41- SR 127
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 217.262,  Lanes on structure: 5,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1530031,  Location: 2.7 MI N OF PERRY (Lat: 32.511078,  Lng: -83.743111),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 57,490 (year 1998),  Truck Traffic: 40%,  Features Intersected: CR 195 TODD ROAD,  Facility Carried by Structure: TODD ROAD
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 223.699,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1530052,  Location: PERRY - NW SECTION (Lat: 32.471647,  Lng: -83.743853),  Route carried "under" structure: US 341,  Structure Length: 0. m,  Average Daily Traffic: 18,260 (year 1998),  Truck Traffic: 1%,  Features Intersected: I-75 (EXIT136),  Facility Carried by Structure: I-75
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 24.140,  Lanes on structure: 6,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1530056,  Location: 6 MI S OF PERRY (Lat: 32.382269,  Lng: -83.768108),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 43,400 (year 1998),  Truck Traffic: 40%,  Features Intersected: CR 543 FIRETOWER ROAD,  Facility Carried by Structure: FIRETOWER ROAD
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 209.215,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1530058,  Location: PERRY - WESTSIDE (Lat: 32.455150,  Lng: -83.752178),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 46,590 (year 1998),  Truck Traffic: 40%,  Features Intersected: CS 622 JULIANN DRIVE,  Facility Carried by Structure: GAINES DRIVE
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 217.262,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1530079,  Location: 7 MI SE OF PERRY (Lat: 32.410689,  Lng: -83.635350),  Route carried "under" structure: US 341,  Structure Length: 0. m,  Average Daily Traffic: 4,330 (year 2012),  Truck Traffic: 1%,  Features Intersected: SR 11 (US 341)-CONYVER,  Facility Carried by Structure: MATL CONVEYOR BELT
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 9.656,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1530084,  Location: 2 MI N OF PERRY (Lat: 32.493239,  Lng: -83.742639),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 57,490 (year 1998),  Truck Traffic: 45%,  Features Intersected: SR 11 CONNECTOR,  Facility Carried by Structure: S.R. 11 CONNECTOR
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 222.090,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1535031,  Location: SOUTH PERRY (Lat: 32.431592,  Lng: -83.756944),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 43,400 (year 1998),  Truck Traffic: 40%,  Features Intersected: CS00835,  Facility Carried by Structure: SOUTH PERRY PKWY
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 215.652,  Lanes on structure: 5,  Length of Maximum Span: 0.0m

Discuss Perry, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.