Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Phoenix, Arizona (AZ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 1,288Number of bridges
  • 19,341ft / 5,895mTotal length
  • $437,000Total costs
  • 50,743,979Total average daily traffic
  • 3,024,079Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Phoenix
  • No street view available for this location

New bridges in Phoenix, AZ - historical statistics
  • New bridges - historical statistics
  • 51920-1929
  • 141930-1939
  • 121940-1949
  • 191950-1959
  • 781960-1969
  • 891970-1979
  • 2821980-1989
  • 3271990-1999
  • 2882000-2009
  • 1682010-2019
  • 62020-2022
Reconstructed bridges in Phoenix, AZ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21940-1949
  • 41950-1959
  • 81960-1969
  • 181970-1979
  • 151980-1989
  • 181990-1999
  • 242000-2009
  • 32010-2019
  • 162020-2022
Average Bridge Daily Traffic in Phoenix, AZ
Average Bridge Truck Traffic in Phoenix, AZ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.1%Very good
  • 59.2%Good
  • 26.9%Satisfactory
  • 3.5%Fair
  • 0.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.2%Very good
  • 58.1%Good
  • 16.2%Satisfactory
  • 4.4%Fair
  • 0.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.2%Very good
  • 67.0%Good
  • 17.1%Satisfactory
  • 1.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 43.2%Excellent
  • 44.4%Very good
  • 6.9%Good
  • 3.9%Satisfactory
  • 1.6%Fair
  • 0.2%Poor
  • 0.9%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 15.1%Very good
  • 69.2%Good
  • 13.4%Satisfactory
  • 2.0%Fair
  • 0.3%Poor
Find on map >>   Show street view

Structure Number: 2314,  Location: 1.0 mi S Jct SR 74 (Lat: 33.783700,  Lng: -112.132900),  Route carried "under" structure: Interstate 17,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 116,992 (year 2018),  Truck Traffic: 4%,  Features Intersected: I-17,  Facility Carried by Structure: Sonoran Blvd
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 358.835,  Lanes on structure: 5,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 2327,  Location: 3.45 mi E Jct I 10 & (Lat: 33.457200,  Lng: -111.978700),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 6,112 (year 2014),  Truck Traffic: 10%,  Features Intersected: 48th Street,  Facility Carried by Structure: SR 202 WB
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 2372,  Location: 5.6 mi N Jct I-10 (Lat: 33.538300,  Lng: -112.041800),  Route carried "under" structure: State highway 51,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 172,309 (year 2018),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: Glendale Avenue
Minimum Vertical Clearance: 6.76m (22.18ft),  Kilometerpoint: 9.012,  Lanes on structure: 7,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 2414,  Location: SR 51 @ McDowell (Lat: 33.465464,  Lng: -112.038117),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 22,022 (year 2019),  Truck Traffic: 3%,  Features Intersected: McDowell Road,  Facility Carried by Structure: SR 51
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 67.4m (221.1ft)

Find on map >>   Show street view

Structure Number: 2415,  Location: SR 51 @ Oak St (Lat: 33.472900,  Lng: -112.038800),  Route carried "under" structure: State highway 51,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 169,086 (year 2018),  Truck Traffic: 5%,  Features Intersected: SR 51,  Facility Carried by Structure: Oak St Ped OP
Minimum Vertical Clearance: 6.37m (20.90ft),  Kilometerpoint: 1.642,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 2416,  Location: Thomas Rd & SR 51 (Lat: 33.479844,  Lng: -112.038378),  Route carried "under" structure: City street ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 47,425 (year 2019),  Truck Traffic: 3%,  Features Intersected: Thomas Road,  Facility Carried by Structure: SR 51
Minimum Vertical Clearance: 5.37m (17.62ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 55.8m (183.1ft)

Find on map >>   Show street view

Structure Number: 2417,  Location: 20th St & SR 51 (Lat: 33.482436,  Lng: -112.039156),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: 20th St Southbound,  Facility Carried by Structure: SR 51
Minimum Vertical Clearance: 5.29m (17.36ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 2419,  Location: SR 51 @ Osborn (Lat: 33.487222,  Lng: -112.041939),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 18,673 (year 2018),  Truck Traffic: 3%,  Features Intersected: Osborn Road,  Facility Carried by Structure: SR 51
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 242,  Location: SR 51 @ Ind Sch (Lat: 33.494450,  Lng: -112.043917),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 24,000 (year 2018),  Truck Traffic: 5%,  Features Intersected: Indian School Road,  Facility Carried by Structure: SR 51
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 63.7m (209.0ft)

Find on map >>   Show street view

Structure Number: 2421,  Location: SR 51 @ Campbell (Lat: 33.502200,  Lng: -112.044000),  Route carried "under" structure: State highway 51,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 172,309 (year 2018),  Truck Traffic: 5%,  Features Intersected: SR 51,  Facility Carried by Structure: Campbell Ped Br
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 4.925,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 2422,  Location: SR 51 @ Highland (Lat: 33.505600,  Lng: -112.044300),  Route carried "under" structure: State highway 51,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 172,309 (year 2018),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: Highland Avenue
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 5.343,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 2423,  Location: SR 51 @ Camelback (Lat: 33.509200,  Lng: -112.044600),  Route carried "under" structure: State highway 51,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 132,422 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: Camelback Road
Minimum Vertical Clearance: 5.22m (17.13ft),  Kilometerpoint: 5.761,  Lanes on structure: 7,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 2424,  Location: SR 51 & Colter St (Lat: 33.512900,  Lng: -112.044700),  Route carried "under" structure: State highway 51,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 132,422 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: Colter Street
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 6.180,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 2425,  Location: SR 51 & Missouri Ave (Lat: 33.516500,  Lng: -112.044500),  Route carried "under" structure: State highway 51,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 124,847 (year 2018),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: Missouri Ave
Minimum Vertical Clearance: 5.53m (18.14ft),  Kilometerpoint: 6.582,  Lanes on structure: 5,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 2426,  Location: 4.4 mi N Jct I-10 (Lat: 33.523700,  Lng: -112.044000),  Route carried "under" structure: State highway 51,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 166,712 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: Bethany Home Road
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 7.355,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 2429,  Location: 20th Street and SR 51 (Lat: 33.477700,  Lng: -112.038300),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 12,453 (year 2019),  Truck Traffic: 1%,  Features Intersected: 20th Street Northbound,  Facility Carried by Structure: SR 51
Minimum Vertical Clearance: 4.86m (15.94ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 2454,  Location: 10 mi N of Jct I 10 (Lat: 33.589800,  Lng: -112.009900),  Route carried "under" structure: State highway 51,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 134,188 (year 2018),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: Cholla Street
Minimum Vertical Clearance: 5.98m (19.62ft),  Kilometerpoint: 16.142,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 2455,  Location: 10.53 N/I 10 (Lat: 33.597000,  Lng: -112.009800),  Route carried "under" structure: State highway 51,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 134,188 (year 2018),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: Cactus Rd
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 16.946,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 2456,  Location: 11 mi N of I 10 (Lat: 33.604189,  Lng: -112.009508),  Route carried "under" structure: City street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 1,190 (year 2018),  Truck Traffic: 1%,  Features Intersected: Sweetwater Ave,  Facility Carried by Structure: SR 51
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 2457,  Location: 11.54 mi North of I 10 (Lat: 33.611589,  Lng: -112.009547),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 23,225 (year 2018),  Truck Traffic: 1%,  Features Intersected: Thunderbird Road,  Facility Carried by Structure: SR 51
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 246,  Location: 0.25 mi S of Greenway (Lat: 33.623000,  Lng: -112.008700),  Route carried "under" structure: State highway 51,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 120,677 (year 2018),  Truck Traffic: 6%,  Features Intersected: SR 51,  Facility Carried by Structure: Nisbet Rd Ped OP
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 19.875,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 2461,  Location: 12.6 mi North of I 10 (Lat: 33.626300,  Lng: -112.007100),  Route carried "under" structure: State highway 51,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 106,578 (year 2018),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: Greenway Rd
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 20.278,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 2464,  Location: 101L mi 24.66 (Lat: 33.669200,  Lng: -112.091500),  Route carried "under" structure: State highway 101,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 175,675 (year 2017),  Truck Traffic: 7%,  Features Intersected: SR 101L,  Facility Carried by Structure: 15th Avenue
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 39.686,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 34.0m (111.5ft)

Find on map >>   Show street view

Structure Number: 2465,  Location: 1.7 mi E I-17 (Lat: 33.668400,  Lng: -112.082900),  Route carried "under" structure: State highway 101,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 178,390 (year 2017),  Truck Traffic: 7%,  Features Intersected: SR 101L,  Facility Carried by Structure: 7th Avenue
Minimum Vertical Clearance: 6.65m (21.82ft),  Kilometerpoint: 40.539,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 2468,  Location: between Bell Rd & Greenwa (Lat: 33.633500,  Lng: -112.004500),  Route carried "under" structure: State highway 51,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 106,578 (year 2018),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: Paradise Ln Ped OP
Minimum Vertical Clearance: 5.52m (18.11ft),  Kilometerpoint: 21.115,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 2469,  Location: 1.00 mi E of 7th Avenue (Lat: 33.668900,  Lng: -112.065900),  Route carried "under" structure: City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 31,576 (year 2015),  Truck Traffic: 10%,  Features Intersected: 7th Street,  Facility Carried by Structure: SR 101 EB
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 247,  Location: 1 mi W Cave Cr/Beardsley (Lat: 33.669000,  Lng: -112.049100),  Route carried "under" structure: City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 5,620 (year 2016),  Truck Traffic: 5%,  Features Intersected: 16th Street,  Facility Carried by Structure: SR 101L EB
Minimum Vertical Clearance: 5.45m (17.88ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: 2471,  Location: SE Deer Valley & 16th (Lat: 33.671200,  Lng: -112.035100),  Route carried "under" structure: City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 27,226 (year 2015),  Truck Traffic: 10%,  Features Intersected: Cave Creek Road,  Facility Carried by Structure: SR 101L
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 55.5m (182.1ft)

Find on map >>   Show street view

Structure Number: 2472,  Location: 1 mi E Cave Cr/Beardsley (Lat: 33.672900,  Lng: -112.014000),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 16,048 (year 2014),  Truck Traffic: 5%,  Features Intersected: 32nd Street,  Facility Carried by Structure: SR 101L WB
Minimum Vertical Clearance: 6.49m (21.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 2475,  Location: 1.3 mi E Jct SR 51 (Lat: 33.673100,  Lng: -111.978000),  Route carried "under" structure: City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 31,265 (year 2015),  Truck Traffic: 10%,  Features Intersected: Tatum Blvd,  Facility Carried by Structure: SR 101L WB
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 52.1m (170.9ft)

Find on map >>   Show street view

Structure Number: 2476,  Location: 1.3 mi E Jct SR 51 (Lat: 33.672800,  Lng: -111.978000),  Route carried "under" structure: City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 31,265 (year 2015),  Truck Traffic: 10%,  Features Intersected: Tatum Blvd,  Facility Carried by Structure: SR 101L EB
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 52.1m (170.9ft)

Find on map >>   Show street view

Structure Number: 2477,  Location: Est 6 mi E/I 17 (Lat: 33.640700,  Lng: -112.003200),  Route carried "under" structure: State highway 51,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 112,075 (year 2018),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: Bell Road
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 21.919,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 2495,  Location: 8.0 mi S 101L/I 17 TI (Lat: 33.553200,  Lng: -112.112700),  Route carried "under" structure: Interstate 17,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 160,372 (year 2018),  Truck Traffic: 4%,  Features Intersected: I 17,  Facility Carried by Structure: Northern Ave
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 333.022,  Lanes on structure: 9,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 2496,  Location: 14.0 mi N Jct I 10 (Lat: 33.567600,  Lng: -112.117600),  Route carried "under" structure: Interstate 17,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 160,372 (year 2018),  Truck Traffic: 4%,  Features Intersected: I 17,  Facility Carried by Structure: Dunlap Ave
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 334.679,  Lanes on structure: 9,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 2528,  Location: 10.0 mi S of I 17/101 TI (Lat: 33.524100,  Lng: -112.112600),  Route carried "under" structure: Interstate 17,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 149,370 (year 2018),  Truck Traffic: 4%,  Features Intersected: I 17,  Facility Carried by Structure: Bethany Home Rd
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 329.803,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 2532,  Location: 11 mi S of I 17/101 TI (Lat: 33.509500,  Lng: -112.112700),  Route carried "under" structure: Interstate 17,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 215,664 (year 2019),  Truck Traffic: 5%,  Features Intersected: I 17,  Facility Carried by Structure: Camelback Rd
Minimum Vertical Clearance: 5.32m (17.45ft),  Kilometerpoint: 328.081,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 2533,  Location: 9.0 mi S 101L/I 17 TI (Lat: 33.538600,  Lng: -112.112600),  Route carried "under" structure: Interstate 17,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 149,370 (year 2018),  Truck Traffic: 4%,  Features Intersected: I 17,  Facility Carried by Structure: Glendale Avenue
Minimum Vertical Clearance: 5.17m (16.96ft),  Kilometerpoint: 331.316,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 254,  Location: 1 mi E Cave Cr/Beardsley (Lat: 33.672800,  Lng: -112.013800),  Route carried "under" structure: City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 11,704 (year 2014),  Truck Traffic: 5%,  Features Intersected: 32nd St,  Facility Carried by Structure: SR 101L
Minimum Vertical Clearance: 6.76m (22.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 2543,  Location: 2.4 mi E Jct SR 51 (Lat: 33.667700,  Lng: -111.960100),  Route carried "under" structure: City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 22,573 (year 2016),  Truck Traffic: 5%,  Features Intersected: 56th Street,  Facility Carried by Structure: SR 101L WB
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 2544,  Location: 2.4 mi E Jct SR 51 (Lat: 33.668100,  Lng: -111.960100),  Route carried "under" structure: City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 22,573 (year 2016),  Truck Traffic: 5%,  Features Intersected: 56 Street,  Facility Carried by Structure: 101L EB
Minimum Vertical Clearance: 6.01m (19.72ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 2552,  Location: 5.00 mi North of I 10 (Lat: 33.508200,  Lng: -112.269300),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 33,700 (year 2018),  Truck Traffic: 3%,  Features Intersected: Camelback Rd,  Facility Carried by Structure: Loop 101 SB
Minimum Vertical Clearance: 5.34m (17.52ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 63.1m (207.0ft)

Find on map >>   Show street view

Structure Number: 2553,  Location: 2.93 mi North / I 10 (Lat: 33.479200,  Lng: -112.264100),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 17,721 (year 2015),  Truck Traffic: 3%,  Features Intersected: Thomas Rd,  Facility Carried by Structure: Loop 101 SB
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 2586,  Location: Maryland Ave & I-17 (Lat: 33.531500,  Lng: -112.112700),  Route carried "under" structure: Interstate 17,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 142,639 (year 2017),  Truck Traffic: 4%,  Features Intersected: I17,  Facility Carried by Structure: Maryland Avenue
Minimum Vertical Clearance: 4.11m (13.48ft),  Kilometerpoint: 330.608,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Truss - Deck,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 2616,  Location: 0.25 mi W of L101/L202 (Lat: 33.291700,  Lng: -111.896500),  Route carried "under" structure: State highway 202,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 115,169 (year 2019),  Truck Traffic: 7%,  Features Intersected: SR 202L, Ramps A, B,  Facility Carried by Structure: Ramp E-N
Minimum Vertical Clearance: 6.66m (21.85ft),  Kilometerpoint: 81.771,  Lanes on structure: 1,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 57.6m (189.0ft)

Find on map >>   Show street view

Structure Number: 2618,  Location: 1 mi S of Chandler Blvd (Lat: 33.293000,  Lng: -111.891900),  Route carried "under" structure: State highway 101,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 13,425 (year 2021),  Truck Traffic: 7%,  Features Intersected: NB Frontage Road,  Facility Carried by Structure: Ramp W-N
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 97.896,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 61.6m (202.1ft)

Find on map >>   Show street view

Structure Number: 262,  Location: 1mi S of Chandler Blvd. (Lat: 33.294100,  Lng: -111.894300),  Route carried "under" structure: State highway 202,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 115,169 (year 2019),  Truck Traffic: 7%,  Features Intersected: 202 loop,  Facility Carried by Structure: Ramp S- E from 101
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 82.077,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 62.2m (204.1ft)

Find on map >>   Show street view

Structure Number: 269,  Location: 0.5 m W I-17/1.2 m N I-10 (Lat: 33.480700,  Lng: -112.116200),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 41,487 (year 2017),  Truck Traffic: 5%,  Features Intersected: Thomas Road,  Facility Carried by Structure: Grand Av/US60
Minimum Vertical Clearance: 6.96m (22.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 2717,  Location: 0.7 mi S Chandler Blvrd (Lat: 33.296600,  Lng: -111.971900),  Route carried "under" structure: State highway 202,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 97,193 (year 2017),  Truck Traffic: 7%,  Features Intersected: SR 202,  Facility Carried by Structure: I 10 WB
Minimum Vertical Clearance: 5.93m (19.46ft),  Kilometerpoint: 88.965,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 2721,  Location: 6.0 mi S Jct SR 60 (Lat: 33.305353,  Lng: -111.972197),  Route carried "under" structure: Interstate 10,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 161,753 (year 2017),  Truck Traffic: 4%,  Features Intersected: I10, Ramps WN & SE,  Facility Carried by Structure: Chandler Blvd
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 258.734,  Lanes on structure: 9,  Lanes under structure: 13,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 2723,  Location: 0.5 m W I-17/1.2 m N I-10 (Lat: 33.482100,  Lng: -112.118300),  Route carried "under" structure: Ramp US 60,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2017),  Truck Traffic: 5%,  Features Intersected: Street Connector C
Minimum Vertical Clearance: 6.69m (21.95ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 9.4m (30.8ft)

Find on map >>   Show street view

Structure Number: 2728,  Location: West of I 10 (Lat: 33.294583,  Lng: -111.980417),  Route carried "under" structure: State highway 202,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 37,802 (year 2018),  Truck Traffic: 7%,  Features Intersected: L202 & Ramps S-W & E-N,  Facility Carried by Structure: 48th Street
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 89.850,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 60.4m (198.2ft)

Find on map >>   Show street view

Structure Number: 2729,  Location: 0.5 m W I-17/1.2 m N I-10 (Lat: 33.481300,  Lng: -112.116900),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 21,048 (year 2017),  Truck Traffic: 5%,  Features Intersected: 27th Avenue,  Facility Carried by Structure: Grand Ave/US60
Minimum Vertical Clearance: 9.04m (29.66ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 43.0m (141.1ft)

Find on map >>   Show street view

Structure Number: 2745,  Location: 1.25mi Eof SosmanRd &US60 (Lat: 33.387164,  Lng: -111.648539),  Route carried "under" structure: US 202,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 76,097 (year 2020),  Truck Traffic: 7%,  Features Intersected: US60 202L Ramp E-N,  Facility Carried by Structure: US 60
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 49.165,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 64.9m (212.9ft)

Find on map >>   Show street view

Structure Number: 2772,  Location: 500' N I-10 @ Van Bur (Lat: 33.452700,  Lng: -112.036600),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 3,440 (year 2019),  Truck Traffic: 4%,  Features Intersected: Ramp WJ-D
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 237.427,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 62.5m (205.1ft)

Find on map >>   Show street view

Structure Number: 2773,  Location: 1.12 mi S Jct SL 202 (Lat: 33.451600,  Lng: -112.036700),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 16,397 (year 2016),  Truck Traffic: 9%,  Features Intersected: Van Buren Street,  Facility Carried by Structure: I-10
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 2774,  Location: 3.4 mi E Jct SR 51 (Lat: 33.661800,  Lng: -111.942600),  Route carried "under" structure: State highway 101,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 160,835 (year 2017),  Truck Traffic: 5%,  Features Intersected: SR 101L,  Facility Carried by Structure: 64th Street
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 53.913,  Lanes on structure: 5,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 2775,  Location: 300' East of 20th St (Lat: 33.451400,  Lng: -112.036400),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 16,397 (year 2016),  Truck Traffic: 9%,  Features Intersected: Van Buren St,  Facility Carried by Structure: I-10
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 2776,  Location: 200 ft east of 20th St (Lat: 33.451200,  Lng: -112.037300),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 16,722 (year 2019),  Truck Traffic: 9%,  Features Intersected: Van Buren Street,  Facility Carried by Structure: I-10/HOV Lanes
Minimum Vertical Clearance: 12.98m (42.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.6m (143.0ft)

Find on map >>   Show street view

Structure Number: 2778,  Location: 500 ft N I-10 @ Washing (Lat: 33.451700,  Lng: -112.037300),  Route carried "under" structure: Interstate 10,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 81,555 (year 2018),  Truck Traffic: 4%,  Features Intersected: I-10 WB,  Facility Carried by Structure: SR 51 HOV Ramp
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 237.233,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 2795,  Location: 202L / US60 (Lat: 33.385408,  Lng: -111.643839),  Route carried "under" structure: Ramp State highway 202,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 4,916 (year 2018),  Truck Traffic: 3%,  Features Intersected: Ellsworth Road Ramp B
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 49.198,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 2845,  Location: I-17/SR 74 Interchange (Lat: 33.798200,  Lng: -112.136100),  Route carried "under" structure: Interstate 17,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 110,542 (year 2019),  Truck Traffic: 4%,  Features Intersected: I-17,  Facility Carried by Structure: SR 74
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 360.493,  Lanes on structure: 7,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.6m (143.0ft)

Find on map >>   Show street view

Structure Number: 2872,  Location: I-17 at Jomax Road (Lat: 33.725667,  Lng: -112.120139),  Route carried "under" structure: Interstate 17,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 124,901 (year 2018),  Truck Traffic: 4%,  Features Intersected: I-17,  Facility Carried by Structure: Jomax Rd EB
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 352.301,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 2874,  Location: 3 mi S Jct SR 74 (Lat: 33.754600,  Lng: -112.126700),  Route carried "under" structure: Interstate 17,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 116,992 (year 2018),  Truck Traffic: 4%,  Features Intersected: I-17,  Facility Carried by Structure: Dixileta Drive
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 355.568,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 2875,  Location: 1.9 mi S Jct SR 74 (Lat: 33.771300,  Lng: -112.129600),  Route carried "under" structure: Ramp Interstate 17,  Year Built: 2009,  Structure Length: 0. m,  Features Intersected: Ramp EN
Minimum Vertical Clearance: 7.21m (23.65ft),  Kilometerpoint: 357.274,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 51.5m (169.0ft)

Find on map >>   Show street view

Structure Number: 2876,  Location: 1.9 mi S Jct SR 74 (Lat: 33.770800,  Lng: -112.129900),  Route carried "under" structure: Ramp Interstate 17,  Year Built: 2009,  Structure Length: 0. m,  Features Intersected: Ramp EN
Minimum Vertical Clearance: 9.50m (31.17ft),  Kilometerpoint: 357.274,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 2877,  Location: 2.0 mi S Jct SR 74 (Lat: 33.768942,  Lng: -112.129039),  Route carried "under" structure: State highway 303,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 25,990 (year 2018),  Truck Traffic: 7%,  Features Intersected: Lone Mountain Rd (L303),  Facility Carried by Structure: I-17 NB
Minimum Vertical Clearance: 5.50m (18.04ft),  Kilometerpoint: 223.699,  Lanes on structure: 5,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 2878,  Location: 2.0 mi S Jct SR 74 (Lat: 33.768900,  Lng: -112.129500),  Route carried "under" structure: State highway 303,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 25,990 (year 2018),  Truck Traffic: 7%,  Features Intersected: Lone Mountain RD (L303),  Facility Carried by Structure: I-17 SB
Minimum Vertical Clearance: 5.29m (17.36ft),  Kilometerpoint: 223.699,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 2879,  Location: 1.9 mi S Jct SR 74 (Lat: 33.770600,  Lng: -112.130400),  Route carried "under" structure: Ramp Interstate 17,  Year Built: 2009,  Structure Length: 0. m,  Features Intersected: Ramp EN,  Facility Carried by Structure: SB Frontage Road
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 357.274,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 2882,  Location: Jct L101 (Lat: 33.671003,  Lng: -111.998403),  Route carried "under" structure: State highway 101,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 59,792 (year 2018),  Truck Traffic: 4%,  Features Intersected: L101 EB,  Facility Carried by Structure: HOV SR 51 Ramp N-E
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 48.280,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 2883,  Location: Jct L101 (Lat: 33.670892,  Lng: -111.998675),  Route carried "under" structure: State highway 101,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 59,792 (year 2018),  Truck Traffic: 4%,  Features Intersected: L101 EB,  Facility Carried by Structure: HOV SR 51 Ramp W-S
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 48.280,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 2924,  Location: 400 ft W Jct I-17 (Lat: 33.769428,  Lng: -112.132419),  Route carried "under" structure: Ramp State highway 303,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 2018),  Features Intersected: Ramp E-N
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 2927,  Location: 1.73 mi N of Jct I-10 (Lat: 33.436300,  Lng: -111.979200),  Route carried "under" structure: State highway 143,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 100,168 (year 2018),  Truck Traffic: 9%,  Features Intersected: SR143/Sky Harbor Blvd
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 2.784,  Lanes on structure: 1,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 76,  Location: 0.12 mi S Of Madison St (Lat: 33.444225,  Lng: -112.075053),  Route carried "under" structure: City street ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 5,999 (year 2007),  Truck Traffic: 1%,  Features Intersected: 1st Avenue,  Facility Carried by Structure: UPRR
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.3m (76.4ft)

Find on map >>   Show street view

Structure Number: 7601,  Location: 0.07 mi S of Madison St (Lat: 33.445039,  Lng: -112.075044),  Route carried "under" structure: City street ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 4,453 (year 2020),  Truck Traffic: 1%,  Features Intersected: 1st Avenue,  Facility Carried by Structure: Jackson Street
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.1m (75.8ft)

Find on map >>   Show street view

Structure Number: 777,  Location: 0.13 mi S of Madison St (Lat: 33.443992,  Lng: -112.095883),  Route carried "under" structure: City street ,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 2,800 (year 2005),  Truck Traffic: 1%,  Features Intersected: 17th Avenue,  Facility Carried by Structure: UPRR/BNSF
Minimum Vertical Clearance: 3.73m (12.24ft),  Kilometerpoint: 311.505,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 6.7m (22.0ft)

Find on map >>   Show street view

Structure Number: 7955,  Location: NORTH SIDE OF TERMINAL 4 (Lat: 33.435828,  Lng: -112.000219),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 14,300 (year 2019),  Truck Traffic: 1%,  Features Intersected: ARRIVAL LEVEL ROAD,  Facility Carried by Structure: DEP LEVEL ROAD
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 7956,  Location: Security Checkpoint A (Lat: 33.436128,  Lng: -111.999250),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 5,200 (year 2019),  Features Intersected: E Sky Harbor Blvd N,  Facility Carried by Structure: Pedestrian Walkway
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 7958,  Location: Security Checkpoint B (Lat: 33.436111,  Lng: -111.996667),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 1995),  Truck Traffic: 5%,  Features Intersected: E Sky Harbor Blvd N,  Facility Carried by Structure: Pedestrian Walkway
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 7958,  Location: Security Checkpoint B (Lat: 33.436111,  Lng: -111.996667),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 1999),  Truck Traffic: 1%,  Features Intersected: E Sky Harbor Blvd N,  Facility Carried by Structure: Pedestrian Walkway
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 796,  Location: SOUTH SIDE OF TERMINAL 4 (Lat: 33.435161,  Lng: -112.000222),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 13,400 (year 2019),  Truck Traffic: 1%,  Features Intersected: ARRIVAL LEVEL ROAD,  Facility Carried by Structure: DEP LEVEL ROAD
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 7961,  Location: Security Checkpoint C (Lat: 33.434775,  Lng: -111.996842),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 1996),  Truck Traffic: 5%,  Features Intersected: E Sky Harbor Blvd S,  Facility Carried by Structure: Pedestrian Walkway
Minimum Vertical Clearance: 10.52m (34.51ft),  Kilometerpoint: 0.000,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 7963,  Location: East of Terminal 4 (Lat: 33.435889,  Lng: -111.992283),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 1999),  Truck Traffic: 1%,  Features Intersected: E Sky Harbor Blvd N,  Facility Carried by Structure: Taxiway R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 7964,  Location: East of Terminal 4 (Lat: 33.434864,  Lng: -111.992281),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 1996),  Truck Traffic: 1%,  Features Intersected: E Sky Harbor Blvd S,  Facility Carried by Structure: Taxiway R
Minimum Vertical Clearance: 4.46m (14.63ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 7965,  Location: East of Terminal 4 (Lat: 33.435894,  Lng: -111.991636),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 42,614 (year 2020),  Truck Traffic: 1%,  Features Intersected: EB Sky Harbor Boulevard,  Facility Carried by Structure: W Service Road
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 7966,  Location: East of Terminal 4 (Lat: 33.434869,  Lng: -111.991633),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 36,109 (year 2020),  Truck Traffic: 1%,  Features Intersected: Sky Harbor Boulevard WB,  Facility Carried by Structure: West Service Road
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 7967,  Location: East of Terminal 4 (Lat: 33.435811,  Lng: -111.991242),  Route carried "under" structure: Ramp City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 1%,  Features Intersected: Airport Return Ramp,  Facility Carried by Structure: West Service Ramp
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 7968,  Location: East of Terminal 4 (Lat: 33.435728,  Lng: -111.987778),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 42,614 (year 2020),  Truck Traffic: 1%,  Features Intersected: Sky Harbor Boulevard EB,  Facility Carried by Structure: East Service Road
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 7968,  Location: East of Terminal 4 (Lat: 33.435728,  Lng: -111.987778),  Route carried "under" structure: Ramp City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 1,942 (year 2020),  Truck Traffic: 1%,  Features Intersected: Sky Harbor Boulevard EB,  Facility Carried by Structure: East Service Road
Minimum Vertical Clearance: 5.47m (17.95ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 7969,  Location: East of Terminal 4 (Lat: 33.434975,  Lng: -111.987772),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 36,109 (year 2020),  Truck Traffic: 1%,  Features Intersected: Sky Harbor Boulevard WB,  Facility Carried by Structure: East Service Road
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 797,  Location: TERMINAL 4 (Lat: 33.435844,  Lng: -111.993839),  Route carried "under" structure: Ramp City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: WB SKY HARBOR BLVD,  Facility Carried by Structure: AIRPORT UPPER ROAD
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.6m (143.0ft)

Find on map >>   Show street view

Structure Number: 797,  Location: TERMINAL 4 (Lat: 33.435844,  Lng: -111.993839),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 4,900 (year 2019),  Truck Traffic: 1%,  Features Intersected: WB SKY HARBOR BLVD,  Facility Carried by Structure: AIRPORT UPPER ROAD
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.6m (143.0ft)

Discuss Phoenix, Arizona (AZ) on our hugely popular Arizona forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.