Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Phoenix, Arizona (AZ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 1,288Number of bridges
  • 19,341ft / 5,895mTotal length
  • $437,000Total costs
  • 50,743,979Total average daily traffic
  • 3,024,079Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Phoenix
  • No street view available for this location

New bridges in Phoenix, AZ - historical statistics
  • New bridges - historical statistics
  • 51920-1929
  • 141930-1939
  • 121940-1949
  • 191950-1959
  • 781960-1969
  • 891970-1979
  • 2821980-1989
  • 3271990-1999
  • 2882000-2009
  • 1682010-2019
  • 62020-2022
Reconstructed bridges in Phoenix, AZ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21940-1949
  • 41950-1959
  • 81960-1969
  • 181970-1979
  • 151980-1989
  • 181990-1999
  • 242000-2009
  • 32010-2019
  • 162020-2022
Average Bridge Daily Traffic in Phoenix, AZ
Average Bridge Truck Traffic in Phoenix, AZ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.1%Very good
  • 59.2%Good
  • 26.9%Satisfactory
  • 3.5%Fair
  • 0.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.2%Very good
  • 58.1%Good
  • 16.2%Satisfactory
  • 4.4%Fair
  • 0.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.2%Very good
  • 67.0%Good
  • 17.1%Satisfactory
  • 1.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 43.2%Excellent
  • 44.4%Very good
  • 6.9%Good
  • 3.9%Satisfactory
  • 1.6%Fair
  • 0.2%Poor
  • 0.9%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 15.1%Very good
  • 69.2%Good
  • 13.4%Satisfactory
  • 2.0%Fair
  • 0.3%Poor
Find on map >>   Show street view

Structure Number: 20112,  Location: 6.9 mi S. of Jct SR 74 (Lat: 33.699700,  Lng: -112.115100),  Route carried "under" structure: Interstate 17,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 116,992 (year 2018),  Truck Traffic: 4%,  Features Intersected: I-17,  Facility Carried by Structure: Pinnacle Peak Rd
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 349.228,  Lanes on structure: 8,  Lanes under structure: 11,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 20115,  Location: I-10 and S Mtn Fwy (Lat: 33.462500,  Lng: -112.188600),  Route carried "under" structure: ServiceInterstate 10,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2019),  Features Intersected: I-10
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 222.926,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.9m (176.8ft)

Find on map >>   Show street view

Structure Number: 20116,  Location: I-10 and 202 S Mtn Fwy (Lat: 33.460400,  Lng: -112.184600),  Route carried "under" structure: Interstate 10,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 200,000 (year 2018),  Truck Traffic: 65%,  Features Intersected: I-10
Minimum Vertical Clearance: 6.30m (20.67ft),  Kilometerpoint: 223.313,  Lanes on structure: 2,  Lanes under structure: 29,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.1m (170.9ft)

Find on map >>   Show street view

Structure Number: 20117,  Location: I-10 and S Mtn Fwy (Lat: 33.461500,  Lng: -112.184500),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 117,000 (year 2018),  Truck Traffic: 4%,  Features Intersected: I-10
Minimum Vertical Clearance: 6.46m (21.19ft),  Kilometerpoint: 223.393,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 20118,  Location: I-10 and 202 S Mtn Fwy (Lat: 33.462100,  Lng: -112.183100),  Route carried "under" structure: Ramp State highway 10,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: I-10
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 223.457,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.8m (107.6ft)

Find on map >>   Show street view

Structure Number: 20119,  Location: I-10 and 202 S Mtn Fwy (Lat: 33.463400,  Lng: -112.182400),  Route carried "under" structure: Interstate 10,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 200,000 (year 2018),  Truck Traffic: 65%,  Features Intersected: I-10
Minimum Vertical Clearance: 7.34m (24.08ft),  Kilometerpoint: 223.377,  Lanes on structure: 2,  Lanes under structure: 14,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 2012,  Location: I-17 at MP 220.35 (Lat: 33.746400,  Lng: -112.125600),  Route carried "under" structure: Interstate 17,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 116,992 (year 2018),  Truck Traffic: 4%,  Features Intersected: I-17,  Facility Carried by Structure: National Rec Trail
Minimum Vertical Clearance: 5.83m (19.13ft),  Kilometerpoint: 354.619,  Lanes under structure: 12,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 20122,  Location: .3 mi south of Frye rd (Lat: 33.292000,  Lng: -111.997500),  Route carried "under" structure: City street ,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: 40th St,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 20123,  Location: 2.8 mi West Jct I 10 (Lat: 33.291300,  Lng: -112.014300),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,050 (year 2020),  Features Intersected: 32nd St,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.22m (17.13ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 20124,  Location: 8.3 mi West Jct I 10 (Lat: 33.291600,  Lng: -112.096900),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,020 (year 2021),  Features Intersected: 24th St,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 20125,  Location: 5.67 Mi West Jct I 10 (Lat: 33.291500,  Lng: -112.063600),  Route carried "under" structure: State highway 202,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,050 (year 2021),  Truck Traffic: 5%,  Features Intersected: SR 202L S Mntn Fwy,  Facility Carried by Structure: Desert Foothills
Minimum Vertical Clearance: 5.50m (18.04ft),  Kilometerpoint: 97.639,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 20126,  Location: 7.61 Mi West Jct I 10 (Lat: 33.291700,  Lng: -112.096900),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2019),  Features Intersected: 17th Ave,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.47m (17.95ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 2013,  Location: 1 Mi SE of 51st Ave (Lat: 33.315300,  Lng: -112.157500),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 5%,  Features Intersected: Ivanhoe St TI OP,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.50m (18.04ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 20133,  Location: 9.62 mi S of I-10/SMF TI (Lat: 33.327000,  Lng: -112.169000),  Route carried "under" structure: ServiceCity street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2019),  Features Intersected: 51st Ave,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 20134,  Location: 12.70 mi north of I-10 (Lat: 33.334100,  Lng: -112.176400),  Route carried "under" structure: ServiceCity street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2019),  Features Intersected: Estrella Drive,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.0m (95.1ft)

Find on map >>   Show street view

Structure Number: 20135,  Location: 0.16 mi W of 59th Ave (Lat: 33.348400,  Lng: -112.190200),  Route carried "under" structure: State highway 202,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 17,425 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR202L S Mntn Fwy,  Facility Carried by Structure: Elliot Rd
Minimum Vertical Clearance: 5.91m (19.39ft),  Kilometerpoint: 112.316,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.6m (143.0ft)

Find on map >>   Show street view

Structure Number: 20136,  Location: 7mi S of I-10 & S Mtn Fwy (Lat: 33.362900,  Lng: -112.192000),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: SR202L S Mntn Fwy,  Facility Carried by Structure: Dobbins Rd
Minimum Vertical Clearance: 5.73m (18.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 20137,  Location: 6mi S of I-10 & S Mtn Fwy (Lat: 33.377100,  Lng: -112.189700),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: Baseline Rd,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 20142,  Location: 3.4 mi S. I-10/ SMF TI (Lat: 33.414300,  Lng: -112.192300),  Route carried "under" structure: State highway 202,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: SR202L S Mntn Fwy,  Facility Carried by Structure: Ped Pathway@Elwood
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 119.767,  Lanes under structure: 10,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 53.6m (175.9ft)

Find on map >>   Show street view

Structure Number: 20143,  Location: 2.8 mi S. I-10/ SMF TI (Lat: 33.422400,  Lng: -112.189900),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 15,006 (year 2020),  Truck Traffic: 5%,  Features Intersected: Lower Buckeye Rd,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.40m (17.72ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.8m (133.9ft)

Find on map >>   Show street view

Structure Number: 20144,  Location: 2.3 mi S. I-10/ SMF TI (Lat: 33.429600,  Lng: -112.187300),  Route carried "under" structure: Ramp City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2020),  Features Intersected: RID Cnl/Durango Rd,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 20146,  Location: 2.75 mi south of I-10 (Lat: 33.436800,  Lng: -112.187200),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 30,659 (year 2020),  Truck Traffic: 5%,  Features Intersected: Buckeye Rd,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 20147,  Location: 0.75 mi south of I-10 (Lat: 33.451300,  Lng: -112.185900),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 19,743 (year 2020),  Truck Traffic: 5%,  Features Intersected: Van Buren St,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.83m (19.13ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 20148,  Location: 2mi S of I-10 (Lat: 33.458700,  Lng: -112.185200),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 2%,  Features Intersected: Roosevelt St,  Facility Carried by Structure: SR202L S Mntn Fwy
Minimum Vertical Clearance: 5.35m (17.55ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 20149,  Location: 0.5 mil south of I-10 (Lat: 33.458800,  Lng: -112.184800),  Route carried "under" structure: ServiceCity street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2020),  Features Intersected: Roosevelt St,  Facility Carried by Structure: SR202L Rp 202N-10W
Minimum Vertical Clearance: 6.69m (21.95ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 20155,  Location: 5mi S of I-10 & S Mtn Fwy (Lat: 33.391800,  Lng: -112.192200),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: Southern Ave,  Facility Carried by Structure: EB 202L S.Mountain
Minimum Vertical Clearance: 5.52m (18.11ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 20156,  Location: 5mi S of I-10 & S Mtn Fwy (Lat: 33.391700,  Lng: -112.191900),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: Southern Ave,  Facility Carried by Structure: WB 202L S.Mountain
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 20157,  Location: 3.8 mi S I-10/ SMF TI (Lat: 33.407900,  Lng: -112.192100),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 41,993 (year 2020),  Truck Traffic: 1%,  Features Intersected: Broadway Rd,  Facility Carried by Structure: EB 202L S.Mountain
Minimum Vertical Clearance: 5.50m (18.04ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 20158,  Location: 3.8 mi S I-10/ SMF TI (Lat: 33.407900,  Lng: -112.191600),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 41,993 (year 2020),  Truck Traffic: 1%,  Features Intersected: Broadway Rd,  Facility Carried by Structure: WB 202L S.Mountain
Minimum Vertical Clearance: 5.50m (18.04ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 20161,  Location: .9 mi E.of Pinnacle Rd. (Lat: 33.712900,  Lng: -112.117900),  Route carried "under" structure: Interstate 17,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 116,992 (year 2018),  Truck Traffic: 4%,  Features Intersected: I-17,  Facility Carried by Structure: Happy Valley Rd
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 350.837,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 20174,  Location: 0.3 mi N of Vee Quiva Way (Lat: 33.319100,  Lng: -112.161400),  Route carried "under" structure: City street ,  Year Built: 2019,  Structure Length: 0. m,  Features Intersected: Ray Rd,  Facility Carried by Structure: SR202L S.Mnt Fwy
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 20182,  Location: Central Avenue (Lat: 33.428500,  Lng: -112.073700),  Route carried "under" structure: City street ,  Year Built: 2021,  Structure Length: 0. m,  Average Daily Traffic: 19,701 (year 2020),  Truck Traffic: 5%,  Features Intersected: Central Avenue,  Facility Carried by Structure: I-17
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Discuss Phoenix, Arizona (AZ) on our hugely popular Arizona forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.