Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Phoenixville, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 48Number of bridges
  • 564ft / 172mTotal length
  • $6,934,000Total costs
  • 489,462Total average daily traffic
  • 42,950Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Phoenixville
  • No street view available for this location

New bridges in Phoenixville, PA - historical statistics
  • New bridges - historical statistics
  • 5Before 1900
  • 31910-1919
  • 11920-1929
  • 21930-1939
  • 31940-1949
  • 31950-1959
  • 61960-1969
  • 151970-1979
  • 21980-1989
  • 11990-1999
  • 22000-2009
  • 52010-2019
Reconstructed bridges in Phoenixville, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 31980-1989
  • 41990-1999
  • 22000-2009
  • 92010-2019
Average Bridge Daily Traffic in Phoenixville, PA
Average Bridge Truck Traffic in Phoenixville, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.5%Very good
  • 51.4%Good
  • 10.8%Satisfactory
  • 21.6%Fair
  • 2.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.1%Very good
  • 23.7%Good
  • 21.1%Satisfactory
  • 26.3%Fair
  • 7.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.6%Very good
  • 42.1%Good
  • 28.9%Satisfactory
  • 21.1%Fair
  • 5.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 19.4%Good
  • 19.4%Satisfactory
  • 38.7%Fair
  • 22.6%Poor
Find on map >>   Show street view

Structure Number: 5433,  Location: Lower Swatara Twp. (Lat: 40.209922,  Lng: -76.722708),  Route carried "on" structure: Interstate 76,  Year Built: 2016,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 24,423 (year 2001),  Truck Traffic: 24%,  Average Future Daily Traffic: 31,579 (year 2030),  Design Load: HL 93,  Features Intersected: LR22016, SR2003
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 403.607,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 38.5m (126.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55089,  Location: 1/2M Twnshp Rd. 3252-C7 (Lat: 40.144389,  Lng: -75.545389),  Route carried "on" structure: City street ,  Year Built: 2018,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 500 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 750 (year 2038),  Design Load: HL 93,  Features Intersected: Branch of French Creek,  Facility Carried by Structure: Crossover Blvd.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020
Find on map >>   Show street view

Structure Number: 5509,  Location: 3/4 M Twnshp Line 3252-C7 (Lat: 40.144628,  Lng: -75.544222),  Route carried "on" structure: City street ,  Year Built: 2018,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 500 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 750 (year 2038),  Design Load: HL 93,  Features Intersected: Branch of French Creek,  Facility Carried by Structure: Crossover Blvd.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020
Find on map >>   Show street view

Structure Number: 27433,  Location: U PROVIDENCE 19F11/3252J3 (Lat: 40.173850,  Lng: -75.506953),  Route carried "under" structure: City street ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 1980),  Features Intersected: OLD STATE ROAD,  Facility Carried by Structure: P-TOWN X-WAY (EB)
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 27434,  Location: U PROVIDENCE 19F11/3252J3 (Lat: 40.174103,  Lng: -75.507036),  Route carried "under" structure: City street ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 1980),  Features Intersected: OLD STATE ROAD,  Facility Carried by Structure: P-TOWN X-WAY (WB)
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 27435,  Location: U. PROVIDENC 19G11/3253A3 (Lat: 40.169611,  Lng: -75.497075),  Route carried "under" structure: State highway 113,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 11,196 (year 2022),  Truck Traffic: 3%,  Features Intersected: TRAPPE ROAD,  Facility Carried by Structure: P-TOWN E-WAY (EB)
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 1.497,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 27436,  Location: UPPER PROVIDENCE 19G11 (Lat: 40.169906,  Lng: -75.497147),  Route carried "under" structure: State highway 113,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 11,196 (year 2022),  Truck Traffic: 3%,  Features Intersected: TRAPPE ROAD,  Facility Carried by Structure: POTTSTOWN EWAY(WB)
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 1.497,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 27437,  Location: COLLEGEVILLE 19K13/3253D5 (Lat: 40.161203,  Lng: -75.479950),  Route carried "under" structure: State highway 29,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 11,828 (year 2022),  Truck Traffic: 2%,  Features Intersected: PA 29 COLLEGEVILLE ROAD,  Facility Carried by Structure: P-TOWN X-WAY (EB)
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 3.137,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 27437,  Location: COLLEGEVILLE 19K13/3253D5 (Lat: 40.161203,  Lng: -75.479950),  Route carried "under" structure: State highway 29,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 10,792 (year 2022),  Truck Traffic: 2%,  Features Intersected: PA 29 COLLEGEVILLE ROAD,  Facility Carried by Structure: P-TOWN X-WAY (EB)
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 3.137,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 27438,  Location: COLLEGEVILLE 19K13/3253D5 (Lat: 40.161394,  Lng: -75.479878),  Route carried "under" structure: State highway 29,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 11,828 (year 2022),  Truck Traffic: 2%,  Features Intersected: COLLEGEVILLE ROAD,  Facility Carried by Structure: P-TOWN X-WAY (WB)
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 3.137,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 27438,  Location: COLLEGEVILLE 19K13/3253D5 (Lat: 40.161394,  Lng: -75.479878),  Route carried "under" structure: State highway 29,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 10,792 (year 2022),  Truck Traffic: 2%,  Features Intersected: COLLEGEVILLE ROAD,  Facility Carried by Structure: P-TOWN X-WAY (WB)
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 3.137,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Discuss Phoenixville, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.