Bridge Statistics for Rochester Hills, Michigan (MI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 44Number of bridges
- 423ft / 129mTotal length
- $1,262,000Total costs
- 1,041,772Total average daily traffic
- 39,026Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Rochester Hills
- No street view available for this location
- New bridges - historical statistics
- 21950-1959
- 131960-1969
- 81970-1979
- 41980-1989
- 11990-1999
- 82000-2009
- 82010-2019
- Reconstructed bridges - Historical Statistics
- 11960-1969
- 01970-1979
- 01980-1989
- 31990-1999
- 32000-2009
- 32010-2019
- Bridge Condition - Deck
- 27.6%Very good
- 34.5%Good
- 20.7%Satisfactory
- 13.8%Fair
- 3.4%Poor
- Bridge Condition - Superstructure
- 41.4%Very good
- 20.7%Good
- 13.8%Satisfactory
- 13.8%Fair
- 10.3%Poor
- Bridge Condition - Substructure
- 27.6%Very good
- 41.4%Good
- 10.3%Satisfactory
- 6.9%Fair
- 13.8%Poor
- Bridge Condition - Channel
- 21.7%Very good
- 43.5%Good
- 13.0%Satisfactory
- 13.0%Fair
- 8.7%Poor
- Bridge Condition - Culverts
- 66.7%Very good
- 16.7%Satisfactory
- 16.7%Poor
Find on map >> Show street view
Structure Number: 13106, Location: ROCHESTER HILLS (Lat: 42.646314, Lng: -83.195958), Route carried "under" structure: Ramp County highway , Year Built: 2004, Structure Length: 0. m, Average Daily Traffic: 6,000 (year 2004), Truck Traffic: 3%, Features Intersected: ADAMS RD ON RAMP, Facility Carried by Structure: WB M-59(OFF RMP)
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.275, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Structure Number: 13106, Location: ROCHESTER HILLS (Lat: 42.646314, Lng: -83.195958), Route carried "under" structure: Ramp County highway , Year Built: 2004, Structure Length: 0. m, Average Daily Traffic: 6,000 (year 2004), Truck Traffic: 3%, Features Intersected: ADAMS RD ON RAMP, Facility Carried by Structure: WB M-59(OFF RMP)
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.275, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)