Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Scranton, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 113Number of bridges
  • 774ft / 236mTotal length
  • $17,504,000Total costs
  • 1,238,086Total average daily traffic
  • 124,769Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Scranton
  • No street view available for this location

New bridges in Scranton, PA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21900-1909
  • 11930-1939
  • 21940-1949
  • 221950-1959
  • 461960-1969
  • 91970-1979
  • 31980-1989
  • 141990-1999
  • 62000-2009
  • 72010-2019
Reconstructed bridges in Scranton, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 61970-1979
  • 31980-1989
  • 21990-1999
  • 12000-2009
  • 32010-2019
Average Bridge Daily Traffic in Scranton, PA
Average Bridge Truck Traffic in Scranton, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.8%Excellent
  • 7.1%Very good
  • 32.1%Good
  • 12.5%Satisfactory
  • 17.9%Fair
  • 17.9%Poor
  • 7.1%Serious
  • 3.6%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 1.7%Excellent
  • 18.6%Very good
  • 15.3%Good
  • 22.0%Satisfactory
  • 15.3%Fair
  • 15.3%Poor
  • 8.5%Serious
  • 3.4%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.1%Very good
  • 28.8%Good
  • 20.3%Satisfactory
  • 28.8%Fair
  • 13.6%Poor
  • 3.4%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.3%Excellent
  • 16.3%Very good
  • 16.3%Good
  • 25.6%Satisfactory
  • 27.9%Fair
  • 11.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 209,  Location: GARGOL (Lat: 40.015558,  Lng: -77.173311),  Route carried "on" structure: State highway ,  Year Built: 1953,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,021 (year 2022),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,691 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB BERMUDIAN CREEK,  Facility Carried by Structure: SR 1020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.348,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $35,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1335,  Location: 500FT W OF OAK RD (Lat: 40.618336,  Lng: -79.905206),  Route carried "on" structure: State highway 910,  Year Built: 1966,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 7,877 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 11,425 (year 2032),  Design Load: HL 93,  Features Intersected: DEER CREEK,  Facility Carried by Structure: GIBSONIA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.724,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5474,  Location: SE OF SHARTLESVILLE (Lat: 40.500758,  Lng: -76.053911),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 125 (year 1985),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2030),  Design Load: HS 20,  Features Intersected: LESHER RUN,  Facility Carried by Structure: LESHER MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $4,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $59,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 8915,  Location: 5 MI SW SINNEMAHONING (Lat: 41.266528,  Lng: -78.155172),  Route carried "on" structure: State highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 348 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 468 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: FOLEY DRAFT,  Facility Carried by Structure: SR 2001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.041,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 13456,  Location: 5 MI.E.CAMBRIDGE SPRINGS (Lat: 41.810442,  Lng: -79.964231),  Route carried "on" structure: City street 7218,  Year Built: 1976,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 50 (year 2020),  Average Future Daily Traffic: 63 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: OVER KELLY RUN,  Facility Carried by Structure: T-840,HOGBACK W.RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $568,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20381,  Location: CITY SCRANTON .1M N EXPWY (Lat: 41.457003,  Lng: -75.663694),  Route carried "on" structure: Alternate US 11,  Year Built: 1993,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 22,044 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 24,800 (year 2032),  Design Load: HS 20,  Features Intersected: LEGGETS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.949,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 20382,  Location: SCRANTON OVER TR11 NB&SB (Lat: 41.454750,  Lng: -75.663075),  Route carried "on" structure: US 6,  Year Built: 1963,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 31,789 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 59,604 (year 2032),  Design Load: HS 20,  Features Intersected: SR 0011 TR 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $572,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20383,  Location: SCRANTON JCT TR11 &SR6006 (Lat: 41.455331,  Lng: -75.661992),  Route carried "on" structure: Business US 6,  Year Built: 1941,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 31,789 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 59,604 (year 2032),  Design Load: HS 20,  Features Intersected: LEGGETTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 31 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $267,000
Find on map >>   Show street view

Structure Number: 2041,  Location: SCRANTON 117' N BROOK ST (Lat: 41.394600,  Lng: -75.672975),  Route carried "on" structure: US 11,  Year Built: 1964,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 9,561 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,889 (year 2032),  Design Load: HS 20,  Features Intersected: STAFFORD MEADOW BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.829,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 20415,  Location: CTY SCRANTON OVER 7TH AVE (Lat: 41.415619,  Lng: -75.669253),  Route carried "on" structure: US 11,  Year Built: 1994,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 20,798 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 32,041 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: SR 3029 7TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.921,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 30.0m (98.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20417,  Location: SCRANTON CITY OVR SR 3013 (Lat: 41.425481,  Lng: -75.670708),  Route carried "on" structure: US 11,  Year Built: 1963,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 20,807 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 38,628 (year 2032),  Design Load: HS 20,  Features Intersected: SR 3013 NORTH MAIN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.180,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $225,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20419,  Location: CTY SCR OVER THEODORE ST (Lat: 41.437528,  Lng: -75.667400),  Route carried "on" structure: US 11,  Year Built: 1963,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 20,807 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 38,628 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: THEODORE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.567,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $200,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20442,  Location: SCRANTON CITY RIVER ST (Lat: 41.393406,  Lng: -75.651361),  Route carried "on" structure: State highway ,  Year Built: 1965,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 11,947 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 22,153 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 0081 I-81,  Facility Carried by Structure: SR 3102 RIVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.5m (60.7ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.30m (23.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $40,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $538,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20444,  Location: SCRANTON CITY OVER SR8005 (Lat: 41.395975,  Lng: -75.644211),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 29,801 (year 2021),  Truck Traffic: 19%,  Average Future Daily Traffic: 35,529 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 8005
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.107,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $246,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20458,  Location: SCRANTON OVER RR&LACK RVR (Lat: 41.449372,  Lng: -75.636553),  Route carried "on" structure: Interstate 81,  Year Built: 1958,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 12.50m (41.01ft),  Average Daily Traffic: 54,680 (year 2022),  Truck Traffic: 15%,  Average Future Daily Traffic: 69,796 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LACK CO RR & LACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.186,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 25.7m (84.3ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.50m (41.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $209,000,  Roadway Improvement Cost: $615,000,  Total Project Cost: $2,820,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20459,  Location: SCRANTON CTY OV N MAIN AV (Lat: 41.449917,  Lng: -75.637739),  Route carried "on" structure: Interstate 81,  Year Built: 1958,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 54,680 (year 2022),  Truck Traffic: 15%,  Average Future Daily Traffic: 69,796 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NORTH MAIN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.038,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.9m (85.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 24.8m (81.4ft),  Out-to-Out Width: 27.3m (89.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Inventory Rating: 97.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $26,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $352,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2046,  Location: SCRANTON CITY ROCKWELL AV (Lat: 41.454997,  Lng: -75.648300),  Route carried "on" structure: ServiceState highway ,  Year Built: 1958,  Status: Closed,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 96 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 134 (year 2032),  Design Load: HS 20,  Features Intersected: SR 0081 I-81,  Facility Carried by Structure: SR 2107 COLIERY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Maintenance Responsibility: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $23,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $314,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20461,  Location: SCRANTON CITY OVER BUS 6 (Lat: 41.456892,  Lng: -75.659981),  Route carried "on" structure: Interstate 81,  Year Built: 1958,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 40,889 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 42,431 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 6006 BUSINESS 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.655,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 27.3m (89.6ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Satisfactory,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $60,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $813,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20564,  Location: SCRANTON CTY OVER I-81 NB (Lat: 41.395536,  Lng: -75.646625),  Route carried "on" structure: State highway 307,  Year Built: 1965,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 16,304 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,544 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 0081 I-81 NORTHBOUND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.923,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 23 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $31,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $421,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20566,  Location: SCRANTON OVER I-81 SR8005 (Lat: 41.396194,  Lng: -75.648306),  Route carried "on" structure: State highway 307,  Year Built: 1966,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 16,304 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,544 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 8005 RAMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.923,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $271,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20569,  Location: SCRANTON 500' N SR 3011 (Lat: 41.445411,  Lng: -75.673253),  Route carried "on" structure: State highway 307,  Year Built: 1969,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 8,603 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,443 (year 2032),  Design Load: HS 20,  Features Intersected: LEACH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.391,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $33,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $449,000
Find on map >>   Show street view

Structure Number: 20639,  Location: SP BRK TP NESBITT RESRVR (Lat: 41.311583,  Lng: -75.641508),  Route carried "on" structure: State highway 502,  Year Built: 1987,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 2,207 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,992 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: NESBIT RESERVOIR INLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.934,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20658,  Location: SPRINGBRK TP .6M E TR 502 (Lat: 41.309992,  Lng: -75.604381),  Route carried "on" structure: State highway 690,  Year Built: 1957,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,481 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,659 (year 2032),  Design Load: H 20,  Features Intersected: RATTLESNAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.982,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $38,000
Find on map >>   Show street view

Structure Number: 20778,  Location: SCRANTN CTY .2M E SR 3013 (Lat: 41.382094,  Lng: -75.705650),  Route carried "on" structure: State highway ,  Year Built: 1990,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 16,196 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 19,571 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: N.S. RR,  Facility Carried by Structure: SR 3016 DAVIS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20783,  Location: SCRANTON 813' E SR 3013 (Lat: 41.415200,  Lng: -75.673464),  Route carried "on" structure: State highway ,  Year Built: 1907,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 5,659 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,859 (year 2032),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RR,  Facility Carried by Structure: SR 3020 LINDEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $179,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20784,  Location: SCRANTON CTY LINDEN ST (Lat: 41.412794,  Lng: -75.668636),  Route carried "on" structure: State highway ,  Year Built: 1970,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 19.39m (63.62ft),  Average Daily Traffic: 6,830 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,814 (year 2032),  Design Load: HS 20,  Features Intersected: LACKA CO RAIL AUTHORITY,  Facility Carried by Structure: SR 3020 LINDEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.647,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 2,  Length of Maximum Span: 49.7m (163.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Serious,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.40m (63.65ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $669,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20786,  Location: SCRANTON .2 M S SR 3025 (Lat: 41.403075,  Lng: -75.663908),  Route carried "on" structure: State highway ,  Year Built: 1958,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 3,295 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,662 (year 2032),  Design Load: HS 20,  Features Intersected: ROARING BROOK,  Facility Carried by Structure: SR 3023 CEDAR AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.789,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 15.4m (50.5ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $26,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $354,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20845,  Location: SCRANTON CTY .1M S SR3013 (Lat: 41.433217,  Lng: -75.660203),  Route carried "on" structure: State highway ,  Year Built: 1946,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 12,496 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,174 (year 2032),  Design Load: HS 20,  Features Intersected: LACKAWANNA RIVER,  Facility Carried by Structure: SR6011 GRN RIDG ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.443,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $63,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $845,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20885,  Location: 200' NW OF S SHERMAN AVE (Lat: 41.417886,  Lng: -75.696550),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 6,250 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,950 (year 2032),  Design Load: HS 20,  Features Intersected: KEYSER CREEK / RBMN RR,  Facility Carried by Structure: WASHBURN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.7m (117.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $76,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $1,027,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20887,  Location: 200 FT NE OF COURT STREET (Lat: 41.426606,  Lng: -75.660322),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 6,100 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,000 (year 2032),  Design Load: HS 20,  Features Intersected: LACKAWANNA RIVER,  Facility Carried by Structure: ALBRIGHT AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $11,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20888,  Location: 500' NW OF S WASHINGTON (Lat: 41.399267,  Lng: -75.676494),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Posted for load,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 11,900 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,200 (year 2032),  Design Load: HS 20,  Features Intersected: LACKAWANNA RIVER,  Facility Carried by Structure: ELM STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Critical,  Superstructure: Critical,  Substructure: Poor,  Channel: Poor,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: April 2020,  Underwater Inspection Date: June 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $36,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $488,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20889,  Location: AT MERIDIAN ST INTERSECT (Lat: 41.401469,  Lng: -75.677233),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 10,800 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,800 (year 2032),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RR,  Facility Carried by Structure: EYNON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $102,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20891,  Location: 100' NW OF HOLLISTER AVE (Lat: 41.443772,  Lng: -75.646067),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,285 (year 2012),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,600 (year 2032),  Design Load: HS 20,  Features Intersected: LEGGETTS CREEK,  Facility Carried by Structure: WELLS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $22,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20892,  Location: 500 FT NE OF W MARKET ST (Lat: 41.454603,  Lng: -75.661947),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Posted for load,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 50 (year 2013),  Average Future Daily Traffic: 65 (year 2033),  Design Load: HS 20,  Features Intersected: LEGGETTS CREEK,  Facility Carried by Structure: HOLLOW AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2020,  Bridge Improvement Cost: $29,000,  Roadway Improvement Cost: $207,000,  Total Project Cost: $393,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20895,  Location: 500 FT NW OF 7TH AVE. (Lat: 41.413100,  Lng: -75.673597),  Route carried "on" structure: City street ,  Year Built: 1972,  Status: Posted for load,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 10,700 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,700 (year 2032),  Design Load: HS 20,  Features Intersected: NSRR / DLRR,  Facility Carried by Structure: W. LACKAWANNA AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 19.1m (62.7ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: November 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $34,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $456,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20898,  Location: 500' EAST OF W MARKET ST (Lat: 41.449747,  Lng: -75.664136),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 2,000 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,500 (year 2032),  Features Intersected: LEGGETTS CREEK,  Facility Carried by Structure: MARY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Fair,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: November 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $81,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20899,  Location: NEAR JOHNSON COLLEGE (Lat: 41.444831,  Lng: -75.644525),  Route carried "on" structure: City street ,  Year Built: 1900,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 10,771 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,000 (year 2032),  Features Intersected: LEGGETTS CREEK,  Facility Carried by Structure: NORTH MAIN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.046,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $404,000
Discuss Scranton, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.