Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for St. Charles, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 114Number of bridges
  • 3,163ft / 964mTotal length
  • $169,631,000Total costs
  • 2,331,661Total average daily traffic
  • 214,382Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for St. Charles
  • No street view available for this location

New bridges in St. Charles, MO - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 41960-1969
  • 71970-1979
  • 61980-1989
  • 361990-1999
  • 402000-2009
  • 132010-2019
  • 42020-2022
Reconstructed bridges in St. Charles, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 31970-1979
  • 01980-1989
  • 21990-1999
  • 32000-2009
Average Bridge Daily Traffic in St. Charles, MO
Average Bridge Truck Traffic in St. Charles, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 50.0%Good
  • 41.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.3%Very good
  • 60.4%Good
  • 18.8%Satisfactory
  • 14.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Very good
  • 54.2%Good
  • 31.3%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.8%Excellent
  • 15.4%Very good
  • 23.1%Good
  • 21.2%Satisfactory
  • 32.7%Fair
  • 3.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 6.7%Excellent
  • 3.3%Very good
  • 10.0%Good
  • 53.3%Satisfactory
  • 23.3%Fair
  • 3.3%Poor
Find on map >>   Show street view

Structure Number: 12139,  Location: S 1198 T 46 N R 4 E (Lat: 38.756747,  Lng: -90.542689),  Route carried "under" structure: State highway 94,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 23,082 (year 2021),  Truck Traffic: 4%,  Features Intersected: MO 94
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 174.081,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 12139,  Location: S 1198 T 46 N R 4 E (Lat: 38.756747,  Lng: -90.542689),  Route carried "under" structure: State highway 94,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 21,275 (year 2021),  Truck Traffic: 4%,  Features Intersected: MO 94
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 45.281,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 1214,  Location: S 1198 T 46 N R 4 E (Lat: 38.756786,  Lng: -90.542581),  Route carried "under" structure: State highway 94,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 21,275 (year 2021),  Truck Traffic: 4%,  Features Intersected: MO 94,  Facility Carried by Structure: RP MO364W TO MUEGG
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 45.269,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 1214,  Location: S 1198 T 46 N R 4 E (Lat: 38.756786,  Lng: -90.542581),  Route carried "under" structure: State highway 94,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 23,082 (year 2021),  Truck Traffic: 4%,  Features Intersected: MO 94,  Facility Carried by Structure: RP MO364W TO MUEGG
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 174.093,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 2784,  Location: S 3280 T 46 N R 5 E (Lat: 38.764711,  Lng: -90.484606),  Route carried "under" structure: City street ,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 6,104 (year 2021),  Truck Traffic: 2%,  Features Intersected: CST MAIN ST,  Facility Carried by Structure: IS 70 E
Minimum Vertical Clearance: 10.64m (34.91ft),  Kilometerpoint: 2.256,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Length of Maximum Span: 146.3m (480.0ft)

Find on map >>   Show street view

Structure Number: 2998,  Location: S 3280 T 46 N R 5 E (Lat: 38.768531,  Lng: -90.494517),  Route carried "under" structure: Business State highway 70,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 10,886 (year 2021),  Truck Traffic: 5%,  Features Intersected: LP 70
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 4.357,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 2999,  Location: S 3280 T 46 N R 5 E (Lat: 38.768794,  Lng: -90.494347),  Route carried "under" structure: Business State highway 70,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 14,173 (year 2021),  Truck Traffic: 5%,  Features Intersected: LP 70
Minimum Vertical Clearance: 4.46m (14.63ft),  Kilometerpoint: 0.230,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 30076,  Location: S 3280 T 46 N R 5 E (Lat: 38.776792,  Lng: -90.511769),  Route carried "under" structure: Interstate 70,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 65,441 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 70,  Facility Carried by Structure: MO 94 E
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 367.544,  Lanes on structure: 8,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.0m (85.3ft)

Find on map >>   Show street view

Structure Number: 30076,  Location: S 3280 T 46 N R 5 E (Lat: 38.776792,  Lng: -90.511769),  Route carried "under" structure: Interstate 70,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 64,209 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 70,  Facility Carried by Structure: MO 94 E
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 34.976,  Lanes on structure: 8,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.0m (85.3ft)

Find on map >>   Show street view

Structure Number: 31294,  Location: S 3280 T 46 N R 5 E (Lat: 38.776314,  Lng: -90.512936),  Route carried "under" structure: ServiceState highway 70,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 6,032 (year 2021),  Truck Traffic: 2%,  Features Intersected: OR 70,  Facility Carried by Structure: MO 94 E
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 9.249,  Lanes on structure: 10,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 31335,  Location: S 3280 T 46 N R 5 E (Lat: 38.777314,  Lng: -90.510492),  Route carried "under" structure: City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 5,718 (year 2021),  Truck Traffic: 4%,  Features Intersected: CST BOONES LICK RD,  Facility Carried by Structure: MO 94 E
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 2.517,  Lanes on structure: 10,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 31756,  Location: S 3280 T 46 N R 4 E (Lat: 38.806597,  Lng: -90.481700),  Route carried "under" structure: State highway 370,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 20,604 (year 2021),  Truck Traffic: 5%,  Features Intersected: MO 370,  Facility Carried by Structure: MEL WETTER PKWY S
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 12.014,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 31756,  Location: S 3280 T 46 N R 4 E (Lat: 38.806597,  Lng: -90.481700),  Route carried "under" structure: State highway 370,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 21,413 (year 2021),  Truck Traffic: 5%,  Features Intersected: MO 370,  Facility Carried by Structure: MEL WETTER PKWY S
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 8.554,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 3194,  Location: S 3280 T 47 N R 4 E (Lat: 38.786678,  Lng: -90.533022),  Route carried "under" structure: Interstate 70,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 54,683 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 70,  Facility Carried by Structure: ZUMBEHL RD S
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 365.381,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 3194,  Location: S 3280 T 47 N R 4 E (Lat: 38.786678,  Lng: -90.533022),  Route carried "under" structure: Interstate 70,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 56,441 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 70,  Facility Carried by Structure: ZUMBEHL RD S
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 37.160,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 35182,  Location: S 3280 T 46 N R 5 E (Lat: 38.770939,  Lng: -90.500358),  Route carried "under" structure: Interstate 70,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 65,441 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 70,  Facility Carried by Structure: CONVENTION CENTER
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 368.743,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 26.7m (87.6ft)

Find on map >>   Show street view

Structure Number: 35182,  Location: S 3280 T 46 N R 5 E (Lat: 38.770939,  Lng: -90.500358),  Route carried "under" structure: Interstate 70,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 64,209 (year 2021),  Truck Traffic: 12%,  Features Intersected: IS 70,  Facility Carried by Structure: CONVENTION CENTER
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 33.788,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 26.7m (87.6ft)

Find on map >>   Show street view

Structure Number: 3729,  Location: S 32 T 47 N R 5 E (Lat: 38.798108,  Lng: -90.466814),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 234 (year 2021),  Truck Traffic: 4%,  Features Intersected: CST MAIN ST,  Facility Carried by Structure: MO 370 E
Minimum Vertical Clearance: 10.41m (34.15ft),  Kilometerpoint: 1.286,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 190.5m (625.0ft)

Find on map >>   Show street view

Structure Number: 373,  Location: S 32 T 47 N R 5 E (Lat: 38.798203,  Lng: -90.466647),  Route carried "under" structure: City street ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 234 (year 2021),  Truck Traffic: 4%,  Features Intersected: CST MAIN ST,  Facility Carried by Structure: MO 370 W
Minimum Vertical Clearance: 10.41m (34.15ft),  Kilometerpoint: 1.263,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 190.5m (625.0ft)

Find on map >>   Show street view

Structure Number: 4043,  Location: S 161 T 47 N R 5 E (Lat: 38.803119,  Lng: -90.475350),  Route carried "under" structure: State highway 94,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 10,417 (year 2021),  Truck Traffic: 6%,  Features Intersected: MO 94,  Facility Carried by Structure: MO 370 E
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 183.441,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 4113,  Location: S 161 T 47 N R 5 E (Lat: 38.803336,  Lng: -90.475300),  Route carried "under" structure: State highway 94,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 10,417 (year 2021),  Truck Traffic: 6%,  Features Intersected: MO 94,  Facility Carried by Structure: MO 370 W
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 183.464,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 4202,  Location: S 13 T 47 N R 4 E (Lat: 38.824178,  Lng: -90.518094),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 13,339 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST ELM ST,  Facility Carried by Structure: MO 370 E
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.113,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 4203,  Location: S 27 T 47 N R 5 E (Lat: 38.820986,  Lng: -90.506639),  Route carried "under" structure: County highway ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 9,106 (year 2021),  Truck Traffic: 5%,  Features Intersected: CRD ELM POINT IND DR,  Facility Carried by Structure: MO 370 E
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 2.303,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 4213,  Location: S 13 T 47 N R 4 E (Lat: 38.824353,  Lng: -90.518100),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 9,800 (year 2021),  Truck Traffic: 5%,  Features Intersected: CST ELM ST,  Facility Carried by Structure: MO 370 W
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.093,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 4214,  Location: S 27 T 47 N R 5 E (Lat: 38.821103,  Lng: -90.506517),  Route carried "under" structure: County highway ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 9,106 (year 2021),  Truck Traffic: 5%,  Features Intersected: CRD ELM POINT IND DR,  Facility Carried by Structure: MO 370 W
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 2.321,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 6672,  Location: S 32 T 47 N R 5 E (Lat: 38.764858,  Lng: -90.484025),  Route carried "under" structure: City street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 6,104 (year 2021),  Truck Traffic: 2%,  Features Intersected: CST MAIN ST,  Facility Carried by Structure: IS 70 W
Minimum Vertical Clearance: 10.44m (34.25ft),  Kilometerpoint: 2.221,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Length of Maximum Span: 146.3m (480.0ft)

Discuss St. Charles, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.