Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sylacauga, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 49Number of bridges
  • 417ft / 127mTotal length
  • $47,887,000Total costs
  • 178,387Total average daily traffic
  • 17,831Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sylacauga
  • No street view available for this location

New bridges in Sylacauga, AL - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 21930-1939
  • 51940-1949
  • 121950-1959
  • 111960-1969
  • 51970-1979
  • 21980-1989
  • 71990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Sylacauga, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Sylacauga, AL
Average Bridge Truck Traffic in Sylacauga, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 28.6%Good
  • 33.3%Satisfactory
  • 14.3%Fair
  • 9.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 19.0%Very good
  • 28.6%Good
  • 38.1%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 19.0%Very good
  • 42.9%Good
  • 4.8%Satisfactory
  • 28.6%Fair
  • 4.8%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.0%Very good
  • 46.5%Good
  • 27.9%Satisfactory
  • 9.3%Fair
  • 2.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 46.2%Good
  • 34.6%Satisfactory
  • 19.2%Fair
Find on map >>   Show street view

Structure Number: 264,  Location: SYLACAUGA (Lat: 33.203800,  Lng: -86.205000),  Route carried "on" structure: City street ,  Year Built: 1925,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 150 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 195 (year 2042),  Design Load: H 15,  Features Intersected: CROOKED CREEK,  Facility Carried by Structure: CO. ROAD 132
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.699,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.8m (12.5ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $220,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $242,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 387,  Location: 3 MI. E. OF CAMDEN (Lat: 31.986589,  Lng: -87.228542),  Route carried "on" structure: State highway 10,  Year Built: 1927,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 2,940 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,829 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 132.467,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 45.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $204,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $224,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 85,  Location: 05 MI E CO 105 (Lat: 33.256558,  Lng: -86.248619),  Route carried "on" structure: County highway 177,  Year Built: 1930,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 480 (year 2018),  Average Future Daily Traffic: 580 (year 2038),  Design Load: H 10,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $286,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1818,  Location: Sulligent (Lat: 33.895250,  Lng: -88.146750),  Route carried "on" structure: US 278,  Year Built: 1928,  Year Reconstructed: 1938,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 4,850 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 6,675 (year 2038),  Design Load: H 15,  Features Intersected: Bogue Creek,  Facility Carried by Structure: AL-118
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.895,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.19m (10.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $591,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $650,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2045,  Location: 0.8 MI N US HWY 72 (Lat: 34.767839,  Lng: -86.714200),  Route carried "on" structure: County highway 88,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 3,500 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,300 (year 2035),  Design Load: H 15,  Features Intersected: VAUGHN BRANCH,  Facility Carried by Structure: JEFF RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $348,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2239,  Location: SYLACAUGA (Lat: 33.166667,  Lng: -86.266667),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 4,200 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,900 (year 2041),  Design Load: H 15,  Features Intersected: DARBY CREEK,  Facility Carried by Structure: WEST FT. WILLIAMS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.1m (10.2ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 67.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $657,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $723,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2416,  Location: 0.9 MI E JCT CO 16 (Lat: 33.316292,  Lng: -86.237733),  Route carried "on" structure: State highway 76,  Year Built: 1940,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 2,509 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,513 (year 2039),  Design Load: H 15,  Features Intersected: BRYANT BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.062,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.2m (7.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.33m (4.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $337,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $371,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2417,  Location: 0.5 MI E JCT CO 45 (Lat: 33.321722,  Lng: -86.208111),  Route carried "on" structure: State highway 76,  Year Built: 1940,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 2,509 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,513 (year 2039),  Design Load: H 15,  Features Intersected: GREASY HEAD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.669,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $468,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2626,  Location: 0.8 MI W CLAY *TALLLINE (Lat: 33.125000,  Lng: -86.190000),  Route carried "on" structure: County highway 511,  Year Built: 1941,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,290 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,525 (year 2038),  Features Intersected: SHELTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 80.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $459,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $505,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 345,  Location: 0.3 MI W FT WILLIAM (Lat: 33.163333,  Lng: -86.291667),  Route carried "on" structure: County highway 34,  Year Built: 1949,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,610 (year 2018),  Truck Traffic: 24%,  Average Future Daily Traffic: 1,975 (year 2038),  Design Load: H 15,  Features Intersected: BRANCH - COLBERT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 387,  Location: 2.9 MI. N OF AL 21 (Lat: 33.213369,  Lng: -86.195539),  Route carried "on" structure: County highway 123,  Year Built: 1950,  Status: Posted for load,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 805 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 935 (year 2038),  Design Load: H 15,  Features Intersected: TALASSEEHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.898,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 10.29m (33.76ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $1,693,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $1,862,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Membrane: Built-up
Find on map >>   Show street view

Structure Number: 3882,  Location: 0.2 MI E CO RT 123 (Lat: 33.246439,  Lng: -86.197592),  Route carried "on" structure: County highway 149,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 235 (year 2018),  Average Future Daily Traffic: 320 (year 2038),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 26.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $223,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5071,  Location: SYLACAUGA SYLVEST PLANT (Lat: 33.183333,  Lng: -86.300000),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 0.89m (2.92ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2041),  Design Load: H 15,  Features Intersected: DARBY CREEK,  Facility Carried by Structure: CITY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.4m (14.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $257,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5109,  Location: SYLACAUGA W 4TH STREET (Lat: 33.200000,  Lng: -86.300000),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,000 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,800 (year 2041),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: CITY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $495,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $545,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5132,  Location: SYLACAUGA (Lat: 33.233333,  Lng: -86.266667),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 0.89m (2.92ft),  Average Daily Traffic: 600 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 890 (year 2041),  Design Load: H 15,  Features Intersected: DARBY CREEK,  Facility Carried by Structure: CITY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.1m (13.5ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $374,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5544,  Location: 2.05 MI N W CO 002 (Lat: 33.163333,  Lng: -86.345000),  Route carried "on" structure: County highway 34,  Year Built: 1956,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 565 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 755 (year 2038),  Features Intersected: BRANCH CULVERT
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $367,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $404,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5545,  Location: 0.75 MI N.W. CO RT 002 (Lat: 33.161667,  Lng: -86.323333),  Route carried "on" structure: County highway 34,  Year Built: 1956,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 610 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 845 (year 2038),  Features Intersected: BRANCH CULVERT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 60.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.48m (8.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $472,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $519,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 563,  Location: 5.3 MI E MAINE AVE (Lat: 33.231292,  Lng: -86.198408),  Route carried "on" structure: County highway 123,  Year Built: 1956,  Status: Posted for load,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 548 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 672 (year 2038),  Design Load: H 15,  Features Intersected: EMAUHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $842,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $926,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7987,  Location: 2.8 MI N JCT ALA 21 (Lat: 33.173300,  Lng: -86.286000),  Route carried "on" structure: US 280,  Year Built: 1963,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 21,282 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 29,784 (year 2039),  Design Load: H 20,  Features Intersected: TAR WATER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.534,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.94m (6.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,502,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,652,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7988,  Location: 2.2 MI N JCT ALA 21 (Lat: 33.167889,  Lng: -86.279061),  Route carried "on" structure: US 280,  Year Built: 1963,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 9,945 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,923 (year 2040),  Design Load: HS 20,  Features Intersected: EASTERN ALABAMA R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.340,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 46.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,417,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $1,559,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7989,  Location: 2.2 MI N JCT ALA 21 (Lat: 33.167858,  Lng: -86.279308),  Route carried "on" structure: US 280,  Year Built: 1963,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 9,945 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,923 (year 2040),  Design Load: HS 20,  Features Intersected: EASTERN ALABAMA R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.340,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 46.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,417,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $1,559,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8331,  Location: 1.0 MI N JCT AL 21 (Lat: 33.154172,  Lng: -86.269278),  Route carried "on" structure: State highway 38,  Year Built: 1964,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 15,625 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 21,875 (year 2039),  Design Load: H 20,  Features Intersected: DARBY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.121,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.36m (4.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,878,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $2,066,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8878,  Location: 0.6 MI E TALLADEGA CO LIN (Lat: 33.176833,  Lng: -86.163139),  Route carried "on" structure: State highway 148,  Year Built: 1965,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 920 (year 2013),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,123 (year 2036),  Design Load: H 15,  Features Intersected: WILLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.665,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.27m (4.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $455,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $501,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8885,  Location: 1.8 MI E OF SYLACAUGA (Lat: 33.166556,  Lng: -86.205000),  Route carried "on" structure: State highway 148,  Year Built: 1965,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,134 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,588 (year 2039),  Design Load: H 15,  Features Intersected: CHARTEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.554,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,145,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $1,260,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8886,  Location: 3 MI EAST SYLACAUGA (Lat: 33.169700,  Lng: -86.184200),  Route carried "on" structure: State highway 148,  Year Built: 1965,  Status: Open,  Structure Length: 1.11m (3.64ft),  Average Daily Traffic: 1,134 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,588 (year 2039),  Design Load: H 15,  Features Intersected: TALLASEEHATCHEE CK.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.391,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $919,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,011,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11433,  Location: INT US 280 / US 231 (Lat: 33.144333,  Lng: -86.257306),  Route carried "on" structure: US 280,  Year Built: 1975,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 7,733 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 10,826 (year 2038),  Design Load: HS 20,  Features Intersected: US 231(SR21)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 70.665,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.7m (38.4ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.06m (29.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,546,000,  Roadway Improvement Cost: $255,000,  Total Project Cost: $2,801,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11434,  Location: INT US 280 * US 231 (Lat: 33.144167,  Lng: -86.257444),  Route carried "on" structure: US 280,  Year Built: 1975,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 7,733 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 10,826 (year 2038),  Design Load: HS 20,  Features Intersected: US 231(SR21)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 70.665,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.7m (38.4ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.06m (29.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,546,000,  Roadway Improvement Cost: $255,000,  Total Project Cost: $2,801,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12223,  Location: 1.0 MI E CO RT 123 (Lat: 33.240194,  Lng: -86.184522),  Route carried "on" structure: County highway 149,  Year Built: 1979,  Status: Posted for load,  Structure Length: 2.48m (8.14ft),  Average Daily Traffic: 175 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 275 (year 2038),  Features Intersected: EMAUHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 44,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.36m (11.02ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $305,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 13882,  Location: 2.8 MI E OF AL HWY 21 (Lat: 33.383333,  Lng: -86.350000),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 125 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 185 (year 2041),  Design Load: H 20,  Features Intersected: BRANCH OF CROOKED CREEK,  Facility Carried by Structure: COUNTY ROAD 132
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.799,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.8m (12.5ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $187,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $206,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15984,  Location: 2.3 MI W OF AL 21 (Lat: 33.211667,  Lng: -86.228333),  Route carried "on" structure: County highway 121,  Year Built: 1994,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 1,832 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,810 (year 2038),  Design Load: HS 20,  Features Intersected: SHIRTEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.300,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,871,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $2,058,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16287,  Location: CITY OF SYLAUGA (Lat: 33.178333,  Lng: -86.278333),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 6,500 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,000 (year 2041),  Design Load: HS 20,  Features Intersected: SHIRTEE CREEK,  Facility Carried by Structure: OLD US 280
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.399,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.1m (36.4ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,304,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,434,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16419,  Location: 2.79 MI N JCT AL 21 (Lat: 33.173100,  Lng: -86.285800),  Route carried "on" structure: US 280,  Year Built: 1995,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 19,272 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 26,981 (year 2040),  Design Load: HS 20,  Features Intersected: TAR WATER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.550,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,405,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $1,546,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16623,  Location: N CITY LIMITS SYLACAUGA (Lat: 33.226814,  Lng: -86.227003),  Route carried "on" structure: State highway 21,  Year Built: 1997,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 8,114 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 11,360 (year 2040),  Design Load: HS 20,  Features Intersected: EMAUHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 343.817,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.96m (62.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,979,000,  Roadway Improvement Cost: $598,000,  Total Project Cost: $6,577,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16624,  Location: N CITY LIMITS SYLACAUGA (Lat: 33.225100,  Lng: -86.227781),  Route carried "on" structure: State highway 21,  Year Built: 1997,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 8,114 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 11,360 (year 2040),  Design Load: HS 20,  Features Intersected: EMAUHEE CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 343.672,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.75m (25.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,443,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $2,687,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17067,  Location: 1.5MI N CO RD 121 (Lat: 33.216667,  Lng: -86.250000),  Route carried "on" structure: County highway 121,  Year Built: 1997,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 610 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 765 (year 2038),  Design Load: HS 20,  Features Intersected: TALLASEEHATCHEE CRK,  Facility Carried by Structure: CO RD 139
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: March 2018,  Bridge Improvement Cost: $1,444,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $1,588,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17116,  Location: LIL TALLASEEHATCHEE CRK (Lat: 33.256667,  Lng: -86.241667),  Route carried "on" structure: County highway 139,  Year Built: 1997,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 510 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 585 (year 2036),  Design Load: HS 20,  Features Intersected: LITTLE TALLASEEHATCHEE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.6m (11.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.93m (6.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $569,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $626,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1818,  Location: 0.1 MI.STH.JCT.OVERBROOK (Lat: 33.134286,  Lng: -86.232936),  Route carried "on" structure: County highway 511,  Year Built: 1955,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,950 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,110 (year 2038),  Features Intersected: UNNAMED BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $380,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $418,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18181,  Location: 1.0 MI.STH AL HWY 21????? (Lat: 33.136111,  Lng: -86.233333),  Route carried "on" structure: County highway 511,  Year Built: 1955,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 3,205 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,925 (year 2038),  Design Load: H 15,  Features Intersected: CROOKED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.73m (8.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,417,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $1,559,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19512,  Location: 1.0MI.STH.CO.175 INT (Lat: 33.255308,  Lng: -86.259686),  Route carried "on" structure: County highway 105,  Year Built: 2009,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 288 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 410 (year 2038),  Design Load: HS 20,  Features Intersected: TALLASEEHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.34m (27.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,716,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $1,888,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19638,  Location: 0.2 MI NTH INT ALABAMA AV (Lat: 33.191750,  Lng: -86.273611),  Route carried "on" structure: County highway 45,  Year Built: 1950,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 3,925 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,450 (year 2034),  Features Intersected: UNAMED TRIB SHIRTEE CRK,  Facility Carried by Structure: OLD SYLACAUGA HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 61.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $278,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $306,000 ( Estimate for 2022)
Discuss Sylacauga, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.