Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sylacauga, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 49Number of bridges
  • 417ft / 127mTotal length
  • $47,887,000Total costs
  • 178,387Total average daily traffic
  • 17,831Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sylacauga
  • No street view available for this location

New bridges in Sylacauga, AL - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 21930-1939
  • 51940-1949
  • 121950-1959
  • 111960-1969
  • 51970-1979
  • 21980-1989
  • 71990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Sylacauga, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Sylacauga, AL
Average Bridge Truck Traffic in Sylacauga, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 28.6%Good
  • 33.3%Satisfactory
  • 14.3%Fair
  • 9.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 19.0%Very good
  • 28.6%Good
  • 38.1%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 19.0%Very good
  • 42.9%Good
  • 4.8%Satisfactory
  • 28.6%Fair
  • 4.8%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.0%Very good
  • 46.5%Good
  • 27.9%Satisfactory
  • 9.3%Fair
  • 2.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 46.2%Good
  • 34.6%Satisfactory
  • 19.2%Fair
Find on map >>   Show street view

Structure Number: 19656,  Location: 0.2 MI EAST OF JCT.AL 21 (Lat: 33.106128,  Lng: -86.249283),  Route carried "on" structure: County highway 657A,  Year Built: 1980,  Year Reconstructed: 2005,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 33 (year 2014),  Average Future Daily Traffic: 57 (year 2036),  Features Intersected: UNNAMED PEROIDIC BRANCH,  Facility Carried by Structure: FARR LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 15.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $229,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 20005,  Location: .5 MI SOUTH US 280 (Lat: 33.215367,  Lng: -86.306019),  Route carried "on" structure: County highway 25,  Year Built: 1965,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 1,372 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,045 (year 2038),  Design Load: HS 20,  Features Intersected: UNAMED BRANCH,  Facility Carried by Structure: COUNTY RD 45
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 57.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $267,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20335,  Location: .1 MI.S.W.INT PELL CITY (Lat: 33.185081,  Lng: -86.258967),  Route carried "on" structure: County highway 315A,  Year Built: 1960,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 210 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 415 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB. SHIRTEE CK.,  Facility Carried by Structure: CREEK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $349,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20336,  Location: END OF PELL CITY ST. (Lat: 33.185600,  Lng: -86.259400),  Route carried "on" structure: County highway 304,  Year Built: 1960,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 310 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 435 (year 2041),  Design Load: HS 20,  Features Intersected: TRIB. SHIRTEE CK.,  Facility Carried by Structure: TWIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $437,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20338,  Location: SYL. MILL VILLAGE (Lat: 33.184400,  Lng: -86.258400),  Route carried "on" structure: County highway 176,  Year Built: 1960,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 310 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 435 (year 2041),  Design Load: H 10,  Features Intersected: TRIB. TO SHIRTEE CK.,  Facility Carried by Structure: CENTRAL AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $343,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $377,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2045,  Location: 0.5MI S.INT FLAG.MT.RD (Lat: 33.233333,  Lng: -86.338889),  Route carried "on" structure: County highway 45,  Year Built: 1955,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,015 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,580 (year 2038),  Design Load: H 20,  Features Intersected: UNNAMED PERIODIC BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.369,  Lanes on structure: 2,  Toll: Toll bridge is a segment,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 73.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $263,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $289,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2067,  Location: ???????????????????????? (Lat: 33.188500,  Lng: -86.255000),  Route carried "on" structure: County highway 299A,  Year Built: 2012,  Status: Posted for load,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 45 (year 2021),  Average Future Daily Traffic: 55 (year 2041),  Features Intersected: UNAMED PERIODIC BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.3m (20.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 29.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $197,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $217,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 11433,  Location: INT US 280 / US 231 (Lat: 33.144333,  Lng: -86.257306),  Route carried "under" structure: State highway 231,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 6,660 (year 2018),  Truck Traffic: 10%,  Features Intersected: US 231(SR21),  Facility Carried by Structure: US280(SR38)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 334.076,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 11434,  Location: INT US 280 * US 231 (Lat: 33.144167,  Lng: -86.257444),  Route carried "under" structure: US 231,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 6,660 (year 2018),  Truck Traffic: 10%,  Features Intersected: US 231(SR21),  Facility Carried by Structure: US 280(SR38)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 334.076,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Discuss Sylacauga, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.