Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Talladega, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 53Number of bridges
  • 528ft / 161mTotal length
  • $60,401,000Total costs
  • 169,132Total average daily traffic
  • 9,706Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Talladega
  • No street view available for this location

New bridges in Talladega, AL - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 51930-1939
  • 141940-1949
  • 51950-1959
  • 11960-1969
  • 21970-1979
  • 91980-1989
  • 21990-1999
  • 82000-2009
  • 42010-2019
Reconstructed bridges in Talladega, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 31990-1999
Average Bridge Daily Traffic in Talladega, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.7%Excellent
  • 14.8%Very good
  • 29.6%Good
  • 33.3%Satisfactory
  • 18.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.8%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 22.2%Fair
  • 7.4%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.9%Very good
  • 25.9%Good
  • 7.4%Satisfactory
  • 29.6%Fair
  • 7.4%Poor
  • 3.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.0%Excellent
  • 20.0%Very good
  • 34.0%Good
  • 30.0%Satisfactory
  • 12.0%Fair
  • 2.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 36.0%Good
  • 52.0%Satisfactory
  • 12.0%Fair
Find on map >>   Show street view

Structure Number: 19398,  Location: AT JCT. JACKSON TRACE (Lat: 33.510278,  Lng: -86.106000),  Route carried "on" structure: County highway 803,  Year Built: 1980,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 125 (year 2018),  Average Future Daily Traffic: 135 (year 2038),  Design Load: HS 20,  Features Intersected: SMALL PERIODIC STREAM,  Facility Carried by Structure: PINE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.3m (20.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $158,000 ( Estimate for 2022),  Deck Structure Type: Aluminum
Find on map >>   Show street view

Structure Number: 1951,  Location: .25 (Lat: 33.356667,  Lng: -86.215000),  Route carried "on" structure: County highway 243,  Year Built: 2007,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 705 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 970 (year 2038),  Design Load: HS 20,  Features Intersected: TALLADEGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 58.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.14m (23.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,468,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,615,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20047,  Location: 500 FT W OF ALLEN ST (Lat: 33.466683,  Lng: -86.061750),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 50 (year 2012),  Average Future Daily Traffic: 55 (year 2042),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: NAFF AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.955,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.58m (8.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $790,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $869,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20048,  Location: 300 FT N OF NIMITZ AVE (Lat: 33.459639,  Lng: -86.078861),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 50 (year 2012),  Average Future Daily Traffic: 55 (year 2042),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: FRANKLIN DRIVE N.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.816,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.69m (5.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $615,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $677,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20049,  Location: 700 FT N OF ALLEN ST (Lat: 33.462139,  Lng: -86.073306),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 1,000 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,100 (year 2042),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: NIMITZ AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.943,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 36.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $770,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2005,  Location: INT. OF ALLEN STREET (Lat: 33.461889,  Lng: -86.069639),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 400 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 440 (year 2042),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: HORNE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.345,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 34.6m (113.5ft),  Out-to-Out Width: 35.2m (115.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.05m (6.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,359,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $1,495,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20051,  Location: 100 FT W OF JUDY CIR (Lat: 33.461083,  Lng: -86.075722),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 400 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 440 (year 2042),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: ALLEN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.39m (4.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $346,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $381,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20052,  Location: 400 FT E OF GREEN ACRES (Lat: 33.458639,  Lng: -86.080083),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 1,000 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,100 (year 2042),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: NIMITZ AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.897,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.3m (20.7ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $770,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20593,  Location: TALLADEGA (Lat: 33.440506,  Lng: -86.096744),  Route carried "on" structure: City street ,  Year Built: 2012,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,000 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,200 (year 2041),  Design Load: HS 20,  Features Intersected: ISBELL BRANCH,  Facility Carried by Structure: 17TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $338,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $372,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 21268,  Location: .06Mi W of Jackson St (Lat: 33.439389,  Lng: -86.110861),  Route carried "on" structure: City street ,  Year Built: 2019,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 106 (year 2016),  Average Future Daily Traffic: 159 (year 2041),  Design Load: HS 20,  Features Intersected: Town Creek,  Facility Carried by Structure: Isbell Circle
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.449,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $455,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $501,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21269,  Location: 200' East of West St (Lat: 33.437189,  Lng: -86.105850),  Route carried "on" structure: City street ,  Year Built: 2019,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,730 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,121 (year 2041),  Design Load: HS 20,  Features Intersected: Isbell Branch,  Facility Carried by Structure: Coosa St West
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $328,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $361,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2127,  Location: 0.1 MI N of North St. W (Lat: 33.436486,  Lng: -86.106578),  Route carried "on" structure: City street ,  Year Built: 2019,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 1,050 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,560 (year 2041),  Design Load: HS 20,  Features Intersected: Isbell Branch,  Facility Carried by Structure: West St N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.53m (5.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $432,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $475,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12002,  Location: CITY OF TALLADEGA (Lat: 33.425825,  Lng: -86.116014),  Route carried "under" structure: State highway 21,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 5,359 (year 2018),  Truck Traffic: 9%,  Features Intersected: AL 21,  Facility Carried by Structure: PEDESTRIAN OVERPAS
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 369.338,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Discuss Talladega, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.